Documents Changes in Schedular Commitments Made in to Provide Rev of Response to NRC RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers within 60 to 90 Days After Receipt of Nuclear Energy Inst Application Guideline
ML17332A334
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/28/1994
From: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Russell W
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AEP:NRC:0692CZ, AEP:NRC:692CZ, GL-92-08, GL-92-8, NUDOCS 9410110173
Download: ML17332A334 (5)


Text

F'.LC)

R.IWY'CCELERATEDRIDS PROCESSING) 0 NOTES:

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9410110173 DOC.DATE: 94/09/28 NOTARIZED: NO DOCKET FACIL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana M

05000315 50-316 Donald C.

Cook Nuclear Power Plant, Unit 2, Indiana M

05000316 AUTH.NAME AUTHOR AFFILIATION FITZPATRICK,E.

Indiana Michigan Power Co. (formerly Indiana

& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION RUSSELL,W.T.

Document Control Branch (Document Control Desk)

R

SUBJECT:

Documents changes in schedular commitments made in 940204 ltr to provide rev of response to NRC RAI re GL 92-08, "Thermo-Lag 330-1 Fire Barriers" within 60 to 90 days after receipt of Nuclear Energy Inst application guideline.

DISTRIBUTION CODE:

A029D COPIES RECEIVED:LTR J ENCL 0 SIZE:

TITLE: Generic Letter 92-008 Thermal-Log 330 Fire Barrier R

INTERNAL EXTERNAL: NOAC RECIPIENT ID CODE/NAME PD3-1 LA HICKMAN,J CE 1

NRR/DRPW/PD3-1 RGN3

....FILE COPIES RECIPIENT LTTR ENCL ID CODE/NAME PD3-1 PD NRR/DE/EELB NRR/DSSA/SPLB NRC PDR COPIES LTTR ENCL D

U N

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE!CONTACTTHE DOCUMENTCONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELIS%II.ATE YOUR NAME PRO<XI DISTRIBUTIONLISTS I'OR DOCUMENTS YOU DON"I'EED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 11 ENCL

0 II 1

t!

II

Indiana Michigan Power Company P.O. Box 16631 Columbus, OH 43216 R

AEP:NRC:0692CZ Donald C.

Cook Nuclear'Plant Units 1 and 2

Docket Nos.

50-315 and 50-316 License Nos.

DPR-58 and DPR-74 REVISION OF

RESPONSE

TO NRC REQUEST FOR ADDITIONAL INFORMATION (RAI) REGARDING GENERIC LETTER (GL) 92-08>

"THERMO-LAG 330-1 FIRE BARRIERS" U.

S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 Attn:

W. T. Russell September 28, 1994

Dear Mr. Russell:

Pursuant to our recent conversations with NRR staff, the purpose of this letter is to formally document the changes in, schedular

'commitments made to the NRC in AEP:NRC:0692CV, dated February 4, 1994.

Specifically, in AEP:NRC:0692CV, we committed to provide supplemental information pursuant to generic letter 92-08, request for additional information on items III.B, IV.B, and VI.B within 60 to 90 days after receipt of the associated Nuclear Energy Institute (NEI) application guideline.

We subsequently received the NEI application guideline.

However, during the *July 26,
1994, NRC technical staff meeting with NEI, it was noted that plant specific letters would be sent by the NRC to licensees to request information similar to that which was to be included in the 60 to 90 day response letter.

As a result of the pending NRC action, we will postpone our response until receipt of the plant specific letter.

This will allow us to consolidate our response to the above generic letter items with any additional items identified in the letter.

Sincerely, E.

E. Fitzpatrick Vice President 9410ilOi73 940928 PDR ADOCK 05000315 PDR DJ(

Mr. W. T; Russell AEP NRC:0692CZ cad cc:

A. A. Blind G. Charnoff J.

B. Martin NFEM Section Chief NRC Resident Inspector

- Bridgman J.

R. Padgett

0