Monthly Operating Rept for Aug 1994 for DC Cook Unit 1.W/
ML17332A304
Person / Time
Site: Cook 
Issue date: 08/31/1994
From: Blind A, Janisse J
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9409190215
Download: ML17332A304 (8)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9409190215 DOC.DATE: 94/08/31 NOTARIZED: NO DOCKET FACIL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana M

05000315 AUTH.NAME AUTHOR AFFILIATION JANISSE,J.D.

Indiana Michigan Power Co. (formerly Indiana

& Michigan Ele p

BLIND,A.A.

Indiana Michigan Power Co. (formerly Indiana

& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Aug 1994 for DC Cook Unit 1.W/

940907 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

0 RECIPIENT ID CODE/NAME PD3-1 PD INTERNAL: AEOD/SPD/RRAB NRR/PMAS/IRCB-E RGN3 EXTERNAL: EG&G BRYCE,J.H NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME HICKMAN,J NRR DORS EAB G FIL 01 NOAC COPIES LTTR ENCL 1

1 1

1 1

1 D

u N

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE!CONTACTTHE DOCUMENTCONTROL DESK, ROOKI PI-37 (EXT. 504-2083 ) TO ELIXIINATEYOUR.4AME PRO%I DISTRIBUTIONLISTS I'OR DOCUMENTS YOU DON"I'L'ED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 10 ENCL 10

indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 IMEMSlNA EQfCNSGQM POWER September 7,

1994 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

Pursuant to the requirements of Donald C.

Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of August 1994 is submitted.

Respectfully, A.A. Blind Plant Manager Attachment c

NRC Region III D.R. Hahn R.C. Callen S.

Hamming J.G. Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick R.L.

Simms W.G. Smith, Jr.

S.J.

Brewer D.W. Paul S.H. Steinhart J.L. Leichner J.A.

Isom D.G. Turner E.A. Smarrella J.C. Krieger D.F. Krause M.E. Russo

~GUO49 9409190215 940831 PDR ADOCK 05000315 R

pnp

N.R.C.

OPERATING DATA REPORT DOCKET NO.

50-315 DATE 0 1/Sep/94 COMPLETED BYJ D Janisse

'TELEPHONE 616-465-5901 OPERATING STATUS

l. Unit Name D.

C.

Cook Unit 1

2. Reporting Period AUG 1994 notes
3. Licensed Thermal Power (MWt) 3250 4.

Name Plate Rating (Gross MWe) 1152

5. Design Electrical Rating (Net MWe) 1020 6.

Maximum Dependable Capacity (GROSS MWe) 1056 7.

Maximum Dependable, Capacity (Net MWe) 1000

8. If Changes Occur in Capacity Ratings (Items no.

3 through 7) Since Last Report Give Reasons 9.

ower eve o

ic estricte ny et e

10.

Reasons For Restrictions. If Any:

is Mo.

r. to ate 744.0 5832.0 744.0 3328.5 0.0 0.0 744.0 3291.1 0.0 0.0 2411869 9314978 774860

. 2965320 747659 2849198 100.0 56.4 100.0 56.4 100.5 48.9 98.5 '7.9 0.0 0.0 x Months (Type, Date,and ll. Hours in Reporting Period 12.

No. of Hrs. Reactor Was Critical

13. Reactor Reserve Shutdown Hours 14.

Hours Generator on Line

15. Unit Reserve Shutdown Hours 16.

Gross Therm.

Energy Gen.

(MWH) 17.

Gross Elect.

Energy Gen.

(MWH) 18.

Net Elect.

Energy Gen'.

(MWH)

19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate 24.

Shutdowns Scheduled over Next Si None umm.

172392.0 128982.9 463.0 126899.7 321.0 372840754 120987980 116370996 74.5 74.5 67.2 65.5

5.9 Duration)

25.

ut own' n

o eport ergo st>mate ate o

tartup:

26.

nsts sn est atus r>or to ommercsa INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION peration Forcast Achieved

C

AVERAGE DAILY POWER LEVEL (HWe-Net)

MONTH DOCKET NO.

50-315 UNIT ONE DATE 0l /Sep/94 COMPLETED BY J D Janisse TELEPHONE 616-465-5901 AUG 1994 DAY 94/08/01 94/08/02 94/08/03 94/08/04 94/08/05 94/08/06 94/08/07 94/08/08 94/08/09 94/08/10 94/08/ll 94/08/12 94/08/13 94/08/14 94/08/15 94/08/16.

AVERAGE DAILY POWER LEVEL 991 987 991 992 1024 1021 1017 1012 1014 1020 1007 1002 1011 1007 1006 1007 DAY 94/08/17 94/08/18 94/08/19 94/08/20 94/08/21 94/08/22 94/08/23 94/08/24 94/08/25 94/08/26 94/08/27 94/08/28 94/08/29 94/08/30 94/08/31 AVERAGE DAILY POWER LEVEL 1003 1004 1009 1005 1008 1006 1005 1008 1005 989 992 1002 1005 1000 1004

DOCKET NO.:

UNIT NAME COMPLETED BY:

TELEPHONE DATE:

PAGE:

50-315 D.C.

Cook Unit 1 D. L. Bublick (616) 465-5901 Sept.'6, 1994 Page 1 of 1 a

MONTHLY OPERATING ACTIVITIES AUGUST 1994 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 1004 RTP.

The unit exited this reporting period in Mode 1 at 1004 RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross Electrical generation for the month of August was 774860 MWH.

DETAILS None to report.

~

0

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH AUGUST 1994 UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

D.

C COOK UNIT Sept.

6, 1994 D. L. Buhllck (616) 465-5901 DURATION NO.

DATE TYPE HOURS METHOD OF SHUTTING DOWN REASON~

REACTOR~

LICENSEE EVENT REPORT NO+

SYSTEM CODE'OMPONENT CODE~

CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE None There were no unit shutdowns or significant power reductions from 100% RTP this month.

F

$ ~

Forced Scheduled 2

Reason:

As Equipment Failure (Explain)

Bs Maintenance or Test Cs Refueling D:

Regulatory Restriction Es Operator Training and License Examination Fs Administrative G:

Operational Error (Explain)

H:

Other (Explain) 3 Method:

1:

Manual 2:

Manual Scram 3:

Automatic Scram 4:

Other (Explain) 4Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 1061) 5Exhibit Ic Same Source