.'UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON> D.C. 20555-000I INDIANA MICHIGAN POWER COMPANY DOCKET NO. 50-316 DONALD C.
COOK NUCLEAR PLANT UNIT NO.
2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 166 License No.
DPR-74 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
B.
C.
D.
E.
The application for amendment by Indiana Michigan Power Company (the licensee) dated August 18,
- 1994, complies with the standards and requirements of the Atomic Energy Act 'of 1954, as amended (the Act),
and the Commission's rules and regulations set forth in 10 CFR Chapter I;
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
(
jrpoqO90131 940906 P PDR ADDCK 050003ib P
PDR 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No.
DPR-74 is hereby amended to read as follows:
Technical S ecifications The Technical Specifications contained in Appendices A and B,
as revised through Amendment No.
166
, are hereby incorporated in the
- license, The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of issuance.
Attachment:
Changes to the Technical Specifications Date of Issuance:
September 6,
1994 FOR THE NUCLEAR REGULATORY COMHISSION pS Ledyard B. Harsh, Director Project Directorate III-I Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation
ATTACHMENT 70 LICENSE AMENDMENT NO. 166 FACILITY OPERATING LICENSE NO.
DPR-74 DOCKET NO. 50-316 Revise Appendix A Technical Specifications by removing the pages identified below and inserting the attached pages.
The revised pages are identified by amendment number and contain vertical lines indicating the area of change.
REMOVE 3/4 0-4 3/4 8-13 3/4 8-16 INSERT 3/4 0-4 3/4 8-13 3/4 8-16
3 4 0 PPLICABILITY SURVEILLANCE RE UIREHENTS 4.0.8 By specific reference to this section, those surveillances which must be performed on or before August 13, 1994, and are designed as 18-month or 36-month surveillances (or required as outage-related surveillances under the provisions of Specification 4.0.5) may be delayed until the end of the cycle 9-10 refueling outage.
For these specific surveillances under this
- section, the spdcified time intervals required by Specification 4.0.2 will be determined with the new initiation date established by the surveillance date during the Unit 2 1994 refueling outage.
4.0.9 By specific reference to this section, those surveillances which must be performed on or before September 7, 1994, and are designated as 18-month surveillances may be delayed until gust prior to core reload in the Unit 2 Cycle 9-10 refueling outage.
COOK NUCLEAR PIAHT - UNIT 2 3/4 0-4 AMENDMENT NO. 458 166
VE L 2.
3.
4.
C UI EME S
Co t ued The pilot cell specific gravity, corrected to 77 F,
and full electrolyte level (fluid at the bottom of the maximum level indication mark), is greater than or equal to 1.200, The pilot cell voltage is greater than or equal to 2.13 volts, and The overall battery voltage is greater than or equal to 250 volts.
b.
At lease once per 92 days by verifying that:
I 1.
The voltage of each connected cell is greater than or equal to 2.13 volts under float charge.
2.
The specific gravity, corrected to 77 F, and full electrolyte level (fluid at the bottom of the maximum level indication mark), of each connected cell is greater than or equal to 1.200 and has not decreased more than 0.03 from the value observed during the previous
- test, and 3.
The electrolyte level of each connected cell is between the top of the minimum level indication mark and the bottom of the maximum level indication mark.
C.
At least once per 18 months by verifying that:
1.
The cells, cell plates and battery racks show no visual indication of physical damage or abnormal deterioration, 2.
The cell-to-cell and terminal connections are clean, tight, free of corrosion and coated with anti-corrosion material, d.
3.
The battery charger willsupply at least 140 amperes at greater than or equal to 250 volts for at least 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.*
At least once per 18
- months, perform a battery service test during shutdown (MODES 5 or 6),
by verifying that the battery capacity is adequate to supply and maintain in OPERABLE status the actual or simulated emergency loads for the times specified in Table 4.8-2 with the battery charger disconnected.
The battery terminal voltage shall be maintained greater than or equal to 210 volts throughout this test.*
+The provisions of Specification 4.0.9 are applicable to the 2-CD battery and charger.
COOK NUCLEAR PIANT - UNIT 2 3/4 8-13 AMENDMENT NO. 448, 430 166
LECTRICA P
R SYSTEMS C
D STRI UTION -
S DOWN:
MI NG 0
TION E
T 0 3.8.2.4 As a minimum, the following D.C. electrical equipment and bus shall be energized and OPERABLE:
1 - 250-volt D.C. bus, and 1 - 250-volt battery bank and charger associated with the above D.C. bus.
P I B
~C~ON:
MODES 5 and 6.
With less than the above complement. of D.C. equipment and bus OPERABLE, establish CONTAINMENT INTEGRITY within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.
VEILLANCE E UIR E
S 4.8.2.4.1 The above required 250-volt D.C. bus shall be determined OPERABLE and energized at least once per 7 days by verifying correct breaker alignment and indicated power availability.
4.8.2.4.2 The above required 250-volt battery bank and charger shall be demonstrated OPERABLE per Surveillance Requirement 4.8.2.3.2.*
- The provisions of Specification 4.0.9 are applicable to Surveillance Requirements 4.8.2.3.2.c.3 and 4.8.2.3.2.d for the 2-CD battery and charger.
COOK NUCLEAR PLANT - UNIT 2 3/4 8-16 AMENDMENT NO. 442 166