(ACCELERATED RIDS PROCESSINC REGULATORY XNFORMATXON DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9408220106 DOC.DATE: 94/07/31 NOTARIZED:
NO DOCKET I FACXL:50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana M
05000316 AUTH.NAME AUTHOR AFFXLIATXON JANISSE,J.D.
(formerly Indiana 6 Michigan Ele P
BLIND,A.A.
(formerly Xndiana 6 Michigan Ele RECIP.NAME RECIPIENT AFFILIATION R
SUBJECT:
Monthly operating rept for Jul 1994 for DC Cook Nuclear Plant Unit 2.W/940808 ltr.
DXSTRXBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES 0
RECXPXENT XD CODE/NAME PD3-1 PD INTERNAL: AEOD/DSP/TPAB NRR/DRIL/RPEB RGN3 EXTERNAL EGGG BRYCE IJ H
NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT XD CODE/NAME HICKMAN,J DORS/OEAB RE L
.01 NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 D
C N
NOTE TO ALL"RIDS'ECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACTTHE DOCUMENTCONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAMEFROM DISTRIBUTIONLISTS I OR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10
Indiana Michigan~
Power Company Cook Nuclear Plant One Cook Place Bridgman, MI 49106 616 465 5901 August 8, 1994 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
Pursuant to the requirements of Donald C.
Cook Nuclear Plant Unit, 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of July 1994 is submitted.
Respectfully, A.
. Blind Plant Manager Attachment c
NRC Region III D.R.
Hahn R.C. Callen S.
Hamming J.G. Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick R.L.
Simms W.G. Smith, Jr.
S.J.
Brewer D.W. Paul S.H. Steinhart J.L. Leichner J.A.
Isom D.G. Turner E.A. Smarrella J.C. Krieger D.F. Krause M.E. Russo
'Ug~o
~
9408220i06 940731 PDR ADOCK 05000316
N.R.C.
OPERATING DATA REPORT DOCKET NO.
50-316 DATE 02/Aug/94 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 OPERATING STATUS
- l. Unit Name D. C.
Cook Unit 2
- 2. Reporting Period July notes
- 3. Licensed Thermal Power (MWt) 3411 4.
Name Plate Rating (Gross MWe) 1133
- 5. Design Electrical Rating (Net MWe) 1090 6.
Maximum Dependable Capacity (GROSS MWe) 1100 7.
Maximum Dependable Capacity (Net MWe) 1060
- 8. If Changes Occur in Capacity Ratings (Items no.
3 through 7) Since Last Report Give Reasons 9.
ower eve o
ic estricte 10.
Reasons For Restrictions. If Any:
ny et e
is o.
- r. to ate umm.
ll. Hours in Reporting Period 744.0 5088.0 145344.0 12.
No. of Hrs. Reactor Was Critical 744.0 3830.8 98679.8
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 14.
Hours Generator on Line 744.0 3483.4 95259.3
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.
Gross Therm.
Energy Gen.
(MWH) 2230573 9416366 291530460 17.
Gross Elect.
Energy Gen.
(MWH) 685310 2930430 94538330 18.
Net Elect.
Energy Gen.
(MWH) 658089 2807164 91033146
- 19. Unit Service Factor 100.0 68.5 66.6
- 20. Unit Availability Factor 100.0 68.5 66.6
- 21. Unit Capacity Factor (MDC Net) 83.4 52.0 59.9
- 22. Unit Capacity Factor (DER Net) 81.1 50.6 58.4
- 23. Unit Forced Outage Rate 0.0 29.3 15.9 24.
Shutdowns Scheduled over Next Six Months (Type, Date,and Duration):
e to be in Se tember 6
1994 for an estimated 0 da s.
25.
ut own t n
o eport erio stimate ate o
tartup:
26.
nits in est tatus rior to ommercia INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION peration Forcast Achieved
AVERAGE DAILY POWER LEVEL (HWe-Net)
HONTH DOCKET NO.
50-316 UNIT TWO DATE 02/Aug/94 COHPLETED BY JD Janisse TELEPHONE 616-465-5901 July DAY 94/07/01 94/07/02 94/07/03 94/07/04 94/07/05 94/07/06 94/07/07 94/07/08 94/07/09 94/07/10 94/07/ll 94/07/12 94/07/13 94/07/14 94/07/15 94/07/16 AVERAGE DAILY POWER LEVEL 1038 1037 1035 1041 1033 1027 1023 1013 922 917 914 914 915 918 916 909 DAY 94/07/17 94/07/18 94/07/19 94/07/20 94/07/21 94/07/22 94/07/23 94/07/24 94/07/25 94/07/26 94/07/27 94/07/28 94/07/29 94/07/30 94/07/31 AVERAGE DAILY POWER LEVEL 901 881 865 854 838 821 800 777 755 750 739 737 726 710 696
DOCKET NO.:
UNIT NAME COMPLETED BY TELEPHONE:
DATE PAGE 50-316 D.C.
Cook Unit 2 D. L. Bublick (616) 465-5901 August 4, 1994 Page 1 of 1 MONTHLY OPERATING ACTIVITIES JULY 1994 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 100% RTP.
The unit exited this reporting period in Mode 1 at 724 RTP.
There were no challenges to the pressurizer safety-valves or power operated relief valves.
Gross Electrical generation for the month of July was 685310 MWH.
DETAILS 7-8-94 7-31-94 1930 2359 Started U-2 Cycle 9 Power Coastdown in preparation for Unit Two refueling/maintenance outage.
e Reactor power is at 72% RTP.
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: JULY 1994 UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
Page 1 of 1 D.
C COOK UNIV 2.
August 4, 1994 DE L. BublicK~
(616) 465-5901 DURATION NO.
DATE TYPE~
HOURS METHOD OF SHUTTING DOWN REASONS REACTOR~
LICENSEE EVENT REPORT NO.
SYSTEM CODEX'OMPONENT CODEs CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 237 940708 S
N/A H
N/A N/A N/A t
Commenced a planned end of core life power coastdown program from 100% RTP.
The cycle 9 to 10 refueling outage is scheduled to begin on September 6,
1994.
The power level at the end of this reporting period was 72% RTP.
1 F
S Forced Scheduled 2
Reason:
A:
Equipment Failure (Explain)
B:
Maintenance or Test C:
Refueling D:
Regulatory Restriction E:
Operator Training and License Examination F:
Administrative G:
Operational Error (Explain)
H:
Other (Explain) 3 Method:
1:
Manual 2:
Manual Scram 3:
Other (Explain) 4Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 1061) 5Exhibit I: