'Iv' PRIORITY' y(ACCELERATED RIDS PROCESSING)y REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9407180273 DOC.DATE: 94/06/30 NOTARIZED: NO DOCKET N
FACIL:50-316 Donald C.
Cook Nuclear Power Plant, Unit: 2, Indiana M
05000316 AUTH.NAME AUTHOR AFFILIATION JANISSE,J.D.
(formerly Indiana
& Michigan Ele p
BUBLICK,D.L.
(formerly Indiana 6 Michigan Ele BLIND,A.A.
(formerly Indiana 6 Michigan Ele-RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for June 1994 for DC Cook Nuclear Plant Unit 2.W/940707 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
0 RECIPIENT ID CODE/NAME PD3-1 PD INTERNAL: AEOD/DSP/TPAB NRR/DRIL/RPEB RGN3 EXTERNAL EGGG BRYCE 1 J
~ H NSIC COPIES LTTR ENCL 1
1
~
1 1
1 1
1 1
1 1
1 1
RECIPIENT ID CODE/NAME HICKMAN,J NRR DO OEAB G
01 NRC PDR COPIES LTTR ENCL 1
1 1.
1' 1
1 1
Y' 0
U NOTE TO ALL'RIDS RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACTTHE DOCUMENTCONTROL DESK, ROOM P!-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAMEFROM DISTRIBUTIONLISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10
t Y',
C j
I
4 r
Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 July 7, 1994 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
Pursuant to the requirements of Donald C.
Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of June 1994 is submitted.
Respectfully, A.A. Blind Plant, Manager Attachment co NRC Region III D.R.
Hahn R.C. Callen S.
Hamming J.G. Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick R.L.
Simms W.G. Smith, Jr.
S.J.
Brewer D.W. Paul S.H. Steinhart J.L. Leichner J.A. Isom D.G. Turner E.A. Smarrella J.C. Krieger D.F. Krause M.E. Russo 9407180273 940b30 PDR ADOCK 050003ib
'R-,.
PDR I
I )
N.R.C.
OPERATING DATA REPORT DOCKET NO.
50-316 DATE 01/Jul/94 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D.
C.
Cook Unit 2
- 2. Reporting Period June 1994
- 3. Licensed Thermal Power (MWt) 3411 4.
Name Plate Rating (Gross MWe) 1133
- 5. Design'lectrical Rating (Net MWe) 1090 6.
Maximum Dependable Capacity (GROSS MWe) 1100 7.
Maximum Dependable Capacity (Net MWe) 1060 notes
- 8. If Changes Occur in Capacity Ratings (Items no.
3 through
- 7) Since Last Report Give Reasons 9.
Power Level To Which Restricted. If Any (Net MWe) 10.
Reasons For Restrictions. If Any:.
This Mo.
Yr. to Date Cumm.
- 11. Hours in Reporting Period 720.0 4344.0 144600.0 12.
No. of Hrs. Reactor Was Critical 720.0 3086.8 97935.8
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator on Line 720.0 2739.4 94515.3
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.
Gross Therm.
Energy Gen.
(MWH) 2371985 7185793 289299887 17.
Gross Elect.
Energy Gen.
(MWH) 756940 2245120 93853020
- 18. Net Elect.
Energy Gen.
(MWH) 730287 2149075 90375057
- 19. Unit Service Factor 100.0
- 63. 1 66.4
- 20. Unit Availability Factor 100.0
- 63. 1 66.4
- 21. Unit Capacity Factor (MDC Net) 95.7 46.7 59.8
- 22. Unit Capacity Factor (DER Net)
- 93. 1 45.4 58.3
- 23. Unit Forced Outage Rate 0.0 34.5 16.0 24.
Shutdowns Scheduled over Next Six Months (Type, Date,and Duration):
Refuelin Outa e to be in Se tember 2,
1994 for an estimated duration of 70 da s.
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved
~
AVERAGE DAILY POWER LEVEL (MHe-Net)
DOCKET NO.
UNIT TELEPHONE 50-3 16 TWO 01/Jul/94 JD Janisse 616-465-5901 DAY AVERAGE DAILY POWER LEVEL June 1994 DAY AVERAGE DAILY POWER LEVEL 94/06/01 94/06/02 94/06/03.
94/06/04'4/06/05 94/06/06 94/06/07 94/06/08 94/06/09 94/05/10 94/06/11 94/06/12 94/06/13 94/06/14 94/06/15 94/06/16 950 1071 1070 1058 1061 1057 1056 1069 1066 928 530 716 1049 1051 1034 1025 94/06/17 94/06/18 94/06/19 94/06/20 94/06/21 94/06/22 94/06/23 94/06/24 94/06/25 94/06/26 94/06/27 94/06/28 94/06/29 94/06/30 1029 1037 1052 1052 1040 1045 1047 1061 1060 1048 1047 1050 1037 1033
DOCKET NO.-
UNIT NAME COMPLETED BY:
TELEPHONE-DATE PAGE 50-316 D.C.
Cook Unit 2 D. L. Bublick (616) 465-5901 July 6, 1994
'age 1 of 1 MONTHLY OPERATING ACTIVITIES JUNE 1994 HIGHLIGHTS The unit entered the reporting period in Mode 1 at 83~ RTP.
The unit exited this reporting period in Mode 1 at 1004 RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross Electrical generation for the month of June was 756940 MWH:
DETAILS 6-1-94 6-2-94 6-10-94 6-12-94 1730 1642 1400 2320 0932 2230 Commenced Reactor Power Increase.
Reactor stabilized at 1004 RTP.
Commenced Power Reduction to allow repair of "E" MFP Suction Pressure Tap Weld leak.
Reactor stabilized at 55> RTP.
Commenced Reactor Power Increase.
Reactor stabilized at 100~
RTP.
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: JUNE 1994 UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
D. C.
COOK UNIT 2 July 6, 1994 D. L. Bublick (616) 465-5901 4
DURATION NO.
DATE TYPE HOURS METHOD OF SHUTTING DOWN REASON REACTOR LICENSEE EVENT REPORT NO SYSTEM CODE'OMPONENT CODE~
CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 236 940610 S
N/A B
N/A N/A N/A N/A The reactor power was reduced to 55%
RTP on 940610 for planned repairs of an "E" MFP Suction Pressure Tap Weld leak.
Reactor power was returned to 100%
RTP on 940612.
1 F:
Forced S:
Scheduled 2
Reason:
A:
Equipment Failure (Explain)
B:
Maintenance or Test Cs Refueling D:
Regulatory Restriction Es Operator Training and License Examination F:
Administrative G:
Operational Error (Explain)
Hs Other (Explain) 3 Method:
1:
Manual 2:
Manual Scram 3:
Other (Explain) 4Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 1061) 5Exhibit I:
Same Source
h