ML17332A214

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for June 1994 for DC Cook Nuclear Plant Unit 1
ML17332A214
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 06/30/1994
From: Blind A, Bublick D, Janisse J
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9407180270
Download: ML17332A214 (12)


Text

~ RIDRIT Y ACCELERATED RIDS PRCCESSINQ)y REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS )

ACCESSION NBR: 9407180270 DOC. DATE: 94/06/30 NOTARIZED:

NO DOCKET FACIL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana M

05000315 AUTH.NAME AUTHOR AFFILIATION JANISSE,J.D.

Indiana Michigan Power Co.

(formerly Indiana 6 Michigan Ele p

BUBLICK,D.L.

Indiana Michigan Power Co.

(formerly Indiana !l'ichigan Ele BLIND,A.A.

Indiana Michigan Power Co.

(formerly Indiana

& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for June 1994 for DC Cook Nuclear Plant Unit 1.W/940707 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT ID CODE/NAME PD3-1 PD INTERNAL: AEOD/DSP/TPAB NRR/DRIL/RPEB RGN3 EXTERNAL: EGGG BRYCE,J.H NSIC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME HICKMAN,J S

OEAB

,G FI E

01 NRC PDR COPIES LTTR ENCL 1

1 1,

1 1

1 1

1 D

0 C

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE!CONTACTTHE DOCUMENTCONTROL DESK, ROOM P!-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAMEFROM DISTRIBUTIONLISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR '0 ENCL 10

1 t

Indianp Michigan ~

Power Company Cook Nuclear Plant One Cook Place Bridgrnan, MI 49106 616 465 5901 lNQMMSL NIClilGQN POWM'uly 7,

1994 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

Pursuant to the requirements of Donald C.

Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of June 1994 is submitted.

Respectfully, A.A. Blind Plant Manager Attachment co NRC Region III D.R. Hahn R.C. Callen S.

Hamming J.G. Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick R.L.

Simms W.G. Smith, Jr.

S.J.

Brewer D.W. Paul S.H. Steinhart J.L. Leichner J.A.

Isom D.G. Turner E.A. Smarrella J.C. Krieger D.F. Krause M.E. Russo 9407180270 940630 PDR ADOCK 05000325 PDR

/p

N.R.C.

OPERATING DATA REPORT DOCKET NO. '0-315 DATE 01/Jul/94 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.

C.

Cook Unit 1

2. Reporting Period June 1994
3. Licensed Thermal Power (MWt) 3250 4.

Name Plate Rating (Gross MWe) 1152

5. Design Electrical Rating (Net MWe) 1020 6.

Maximum Dependable Capacity (GROSS MWe) 1056 7.

Maximum De endable Ca acit Net MWe) 1000 notes p

p y

(

8. If Changes Occur in Capacity Ratings (Items no.

3 through

7) Since Last Report Give Reasons 9.

Power Level To Which Restricted. If Any (Net MWe) 10.

Reasons For Restrictions. If Any:

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

Hours in Reporting Period No. of Hrs. Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator on Line Unit Reserve Shutdown Hours Gross Therm.

Energy Gen.

(MWH)

Gross Elect.

Energy Gen.

(MWH)

Net Elect.

Energy Gen.

(MWH)

Unit Service Factor Unit Availability Factor Unit Capacity Factor (MDC Net)

Unit Capacity Factor (DER Net)

Unit Forced Outage Rate Shutdowns Scheduled over Next Six None This Mo.

Yr. to Date 720.0 4344.0 720.0 1840.5 0.0 0.0 720.0 1803.1 0.0 0.0 2195918 45004 13 705580 1425320 679682 1363442 100 '

41.5 100.0 41.5 94.4 31.4 92.5 30.8 0.0 0.0 Months (Type, Date, and Cumm.

170904.0 127494.9 463.0 125411.7 321. 0 368026188 119447980 114885240 74.3 74.3 66.9 65.2

6.0 Duration)

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved

AVERAGE DAILY POWER LEVEL (MWe-Net )

DOCKET NO.

UNIT TELEPHONE 50-315 ONE 01/Ju1/94 JD Janisse 616-465-5901 DAY 94/06/01 94/06/02 94/06/03 94/06/04 94/06/05 94/06/06 94/06/07 94/06/08 94/06/09 94/06/10 94/.06/11 94/06/12 94/06/13 94/06/14 94/06/15 94/06/16 June 1994 A

AVERAGE DAILY POWER LEVEL 406 460 663 872 994 997 996 1003 999 989 1011 "1014 1017 1012 1013 1003 DAY 94/06/17 94/06/18 94/06/19 94/06/20 94/06/21 94/06/22 94/06/23 94/06/24 94/06/25 94/06/26 94/06/27 94/06/28 94/06/29 94/06/30 AVERAGE DAILY POWER LEVEL 990 993 1002 1010 1005 1002 1003 960 899 985 1008 1009 1005 1000

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: JUNE 1994 UNIT NAME:

D. C.

COOK UNIT 1 DATE:

July 6, 1994 COMPLETED BY:

D. L. Bublick TELEPHONE:

(616) 465-8901 DURATION NO.

DATE TYPE HOURS METHOD OF SHUTTING DOWN REASONS REACTOR~

LICENSEE EVENT REPORT NO.

SYSTEM CODE'OMPONENT CAUSE AND CORRECTIVE ACTION CODE~

TO PREVENT RECURRENCE 310 940624 S

N/A N/A N/A N/A N/A The reactor power was reduced to 80% RTP on 940624 for planned Main Turbine valve testing.

Reactor power was returned to 99%

RTP on 940626.

1 F:

S:

Forced Scheduled 2

Reason:

A:

Equipment Failure (Explain)

B:

Maintenance or Test C:

Refueling D:

Regulatory Restriction

~ E:

Operator Training and License Examination Fs Administrative=

G:

Operational Error (Explain)

H:

Other (Explain) 3 Methods 1:

Manual 2:

Manual Scram 3:

Automatic Scram 4:

Other (Explain) 4Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 1061) 5Exhibit Is Same Source

DOCKET NO.:

UNIT NAME COMPLETED BY TELEPHONE:

DATE:

PAGE 50-315 D.C.

Cook Unit 1 D. L. Bublick (616) 465-5901 July 6, 1994 Page 1 of 2 MONTHLY OPERATING ACTIVITIES June 1994 HIGHLIGHTS The unit entered the reporting period in Mode 1 at 49% RTP.

The unit exited this reporting period in Mode 1 at 99% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross Electrical generation for the month of June was 705580 MWH.

DETAILS 6-2-94 6-3-94 6-4-94 1130 1800 2036 0430 1330 2200 0205 Commenced Reactor Power Increase.

Reactor stabilized at 584 RTP.

Commenced Reactor Power Increase.

Reactor stabilized at 694 RTP.

Commenced Reactor Power Increase.

Reactor stabilized at 794 RTP for Chemistry Hold.

Commenced Reactor Power Increase.

6-5-94 6-11-94 1330 Reactor stabilized at 904 RTP.

2036 Commenced Reactor Power Increase.

0310 Reactor stabilized at 97.5:

RTP.

1015 Commenced Reactor Power Increase.

6-24-94.

1130 1424 2247 Reactor stabilized at 1004 RTP.

Commenced Power Reduction for valve testing.

Reactor stabilized at 80% RTP.

6-25-94 0335 0926 1940 Commenced Reactor Power Increase.

Reactor stabilized at 904 RTP.

Commenced Reactor Power Increase.

~ ~

e

DOCKET NO.:

UNIT NAME COMPLETED BY:

TELEPHONE:

DATE PAGE 50-315 D.C.

Cook Unit 1 D. L. Bublick (616) 465-5901 July 6, 1994 Page 2 of 2 MONTHLY OPERATING ACTIVITIES June 1994 6-25-94 6-26-94 2150 1126 1340 Reactor stabilized at 95% RTP.

Commenced Reactor Power Increase.

Reactor stabilized at 994 RTP.

L

~

P

~

f)

Q

\\