A,CCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9406210301 DOC.DATE: 94/05/31 NOTARIZED:

NO 'OCKET, 0 FACIL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana M

05000315 AUTH.NAME AUTHOR AFFILIATION JANISSE,J.D.

Indiana Michigan Power Co.

(formerly Indiana

& Michigan Ele BUBLICK,D.L.

Indiana Michigan Power Co.

(formerly Indiana

& Michigan Ele BLIND,A.A.

Indiana Michigan Power Co.

(formerly Indiana

& Michigan Ele R

RECIP.NAME RECIPIENT AFFILIATION I

SUBJECT:

Monthly operating rept for May 1994 for DC Cook Nuclear Plant Unit 1.W/940606 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

D RECIPIENT ID CODE/NAME PD3-1 PD INTERNAL: AEOD/DSP/TPAB NRR/DRIL/RPEB RGN3 EXTERNAL EG&G BRYCE g J

~ H NSIC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME HICKMAN,J N

ORS OEAB RE FIL 01 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 D

D S

R-D NOTE TO ALL"RIDS" RECIPIENTS:

D D

PLEASE HELP US TO REDUCE lVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOiVI P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 10 ENCL 10

Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 June 6,

1994 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

pursuant to the requirements of Donald C.

Cook Nuclear plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of May 1994 is submitted.

Respectfully, A.A. Blind Plant Manager Attachment c;

NRC Region III D.R.

Hahn R.C. Callen S.

Hamming J.G. Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick R.L.

Simms W.G. Smith, Jr.

S.J.

Brewer D.W. Paul S.H. Steinhart J.L. Leichner J.A.

Isom D.G. Turner E.A. Smarrella J.C. Krieger D.F. Krause M.E. Russo

'P406210301 940531 PDR ADOCK 05000315 R

PDR

~ 1 If

N.R.C.

OPERATING DATA REPORT DOCKET NO.

50-315 DATE 02/Jun/94 COMPLETED BY JD Janisse TELEPHONE 616-465-.5901 OPERATING STATUS

1. Unit Name D.

C.

Cook Unit 1

2. Reporting Period May 1994

-3. Licensed Thermal Power (MWt) 3250 4.

Name Plate Rating (Gross MWe)

~

1152

5. Design Electrical Rating (Net MWe) 1020 6.

Maximum Dependable Capacity (GROSS MWe) 1056 7.

Maximum Dependable Capacity (Net MWe) 1000 notes

8. If Changes Occur in Capacity Ratings (Items no.

3 through

7) Since Last Report Give Reasons
9. Power, Level To Which Restricted. If Any (Net MWe) 10.

Reasons For Restrictions. If Any:

11.

Hours in Reporting Period 12.

No. of Hrs. Reactor Was Critical

13. Reactor Reserve Shutdown Hours
14. Hours Generator on Line
15. Unit Reserve Shutdown Hours.

16.

Gross Therm.

Energy Gen.

(MWH)

17. Gross Elect.

Energy Gen.

(MWH)

18. Net Elect.

Energy Gen.

(MWH)

19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate 24.

Shutdowns Scheduled over Next Six None This Mo.

Yr. to Date 744.0 3624.0 107.4 1120.5 0.0 0.0 70.1 1083.1 0.0 0.0 78086 2304494 19680 '19740 17382 683760 9.4 29.9 9.4 29.9 2.3 18.9 2.3

18. 5 0.0 0.0 Months (Type, Date,and Cumm.

170184.0 126774.9 463 '

124691.7 321.0 365830270 118742400 114205558 74.2 74.2 66.8 65.1

6.0 Duration)

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved

AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY DOCKET NO.

UNIT TELEPHONE May 1994 AVERAGE DAILY POWER LEVEL 50-315 ONE 02/Jun/94 JD Janisse 616-465-5901 DAY AVERAGE DAILY POWER LEVEL 94/05/01 94/05/02 94/05/03 94/05/04 94/05/05 94/05/06 94/05/07 94/05/08 94/05/09 94/05/10 94/05/11 94/05/12 94/05/13 94/05/14 94/05/15 94/05/16 94/05/17 94/05/18 94/05/19 94/05/20 94/05/21 94/05/22 94/05/23 94/05/24 94/05/25 94/05/26 94/05/27 94/05/28 94/05/29 94/05/30 94/05/31 0

0 0

0 0

0 0

0 0

0 0

0 200 169 356

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: MAY 1994 UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

Page 1 of 1 D. C.

COOK UNIT 1 June 5,

1994 D. L. Bublick (616) 465-5901 DURATION NO.

DATE TYPE'OURS METHOD OF SHUTTING DOWN REASON~

REACTOR~

LICENSEE EVENT REPORT NO.

'SYSTEM CODE'OMPONENT CAUSE AND CORRECTIVE ACTION CODE TO PREVENT RECURRENCE 308 940212 S

309 940530 S

672.4 B/C 1.7 N/A N/A N/A N/A N/A N/A The unit was removed. from service on-940212 at 0457 hours0.00529 days <br />0.127 hours <br />7.556217e-4 weeks <br />1.738885e-4 months <br /> EDT for the cycle 13 to 14 refueling/maintenance outage.

All refueling and maintenance activities have been completed

'nd the turbine generator was paralleled to the grid on 940529 at 0026 hours3.009259e-4 days <br />0.00722 hours <br />4.298942e-5 weeks <br />9.893e-6 months <br />.

Total length of the outage was 2,539.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />.

The turbine generator was removed from parallel to perform turbine overspeed testing.

The testing was successfully completed and the unit was reparalleled to the grid at 1557 on 940530.

1F-S Forced Scheduled 2

Reason:

A:

Equipment Failure (Explain)

B:

Maintenance or Test C:

Refueling D:

Regulatory Restriction E:

Operator Training and License Examination F:

Administrative G:

Operational Error (Explain)

H:

Other (Explain) 3 Method:

1:

Manual 2:

Manual Scram 3:

Automatic Scram 4:

Other (Explain) 4Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 1061) 5Exhibit I:

Same Source

DOCKET O.:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

DATE:

PAGE 50-315 D.C.

Cook Unit 1 D. L. Bublick (616) 465-5901 June 5, 1994 Page 1 of 2 MONTHLY OPERATING ACTIVITIES MAY 1994 HIGHLIGHTS The unit entered the reporting period in Mode 5 at 04 RTP.

The reactor was taken critical on May 27, 1994 at 1237 for the first time in cycle 14.

The first entry into Mode 1 was on May 28, 1994 at 2137.

The turbine generator was paralleled to the grid on May 29, 1994 at 0026.

Reactor power was decreased to 84 RTP on May 30, 1994,for turbine overspeed testing.

The turbine generator was paralleled to the grid on May 30, 1994 at 1557.

Power escalation to 484 RTP was begun on May 30, 1994 at 1605 The unit exited this reporting period in Mode 1 at 48% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross Electrical generation for the month of May was 19680 MWH.

DETAILS 05-02-94 05-05-94 05-13-94 05-14-94 05-25-94 05-27-94 0611 1528 0452 1527 0435 0352 1556 1120 1237 Entered Mode 4.

Entered Mode 3.

Started RCS Cooldown at '254F/Hour.

Going to Mode 5 for Conoseal Repairs.

Entered Mode 4.

Entered Mode 5.

Entered Mode 4.

Entered Mode 3.

Entered Mode 2.

Reactor reached criticality.

DOCKET UNIT NAME:

COMPLETED BY:

TELEPHONE:

DATE:

PAGE:

50-315 D.C.

Cook Unit 1 D. L. Bublick (616) 465-5901 June 5,

1994 Page 2 of 2

MONTHLY OPERATING ACTIVITIES MAY 1994 DETAILS (con't) 05-28-94 05-29-94 05-30-94 05-31-94 2024 2137 2205 0026 0033 0519 1042 1401 1413 1416 1557 1605 1748 2218 1500 Commenced reactor power increase for turbine roll.

Entered Mode 1.

Reactor power at 7% RTP.

Unit paralleled to the grid.

Increased reactor power to 30% RTP.

Reactor power at 304 RTP.

Commenced reactor power reduction for Turbine Overspeed Testing.

Main turbine overspeed testing underway.

Main turbine tripped.

Reset main turbine.

Paralleled main generator.

Started power escalation to 484 RTP.

Stopped reactor power increase at 28.5:

for Chemistry hold.

Continued with reactor power increase to 48: RTP.

Reactor power stabalized at 48% RTP.