ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY XNFORMATION DISTRIBUTION SYSTEM (RIDS).
ACCESSXON NBR:9406210296 DOC.DATE: 94/05/31 NOTARIZED:
NO
.'OCKET,N FACIL:50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana M
05000316 AUTH.NAME AUTHOR AFFILIATION'ANSXSSE,J.D..-
Indiana. Michigan.-Power, Co....(.formerly,.Indiana..& Michigan Ele BUBLICK,D.L.
Indiana Michigan Power Co. (formerly Indiana
& Michigan Ele BLIND,A.A..
(formerly Indiana
& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating rept for May 1994 for DC Cook Nuclear Plant Unit 2.W/940606 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR t ENCL L SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES D
A RECIPIENT ID CODE/NAME PD3-1 PD, INTERNAL: AEOD/DSP/TPAB NRR/DRIL/RPEB RGN3 EXTERNAL EG&G BRYCE IJ
~ H NSIC ICOPIES LTTR ENCL 1
1 1
1 1
1 1
1 1 '>
1 1
RECIPIENT ID CODE/NAME HICKMAN,J R BORS/OEAB RE FXL 01 NRC PDR COPIES LTTR ENCL 1
1.
1 1
1 I
1 1:r D
D R
D NOTE TO ALL"RIDS" RECIPIENTS i
PLEASE HELP VS TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10 D
D
ql L
l
Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 June 6,
1994 U. S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gehtlemen:
Pursuant to the requirements of Donald C.
Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of May 1994 is submitted.
Respectfully, pea. M A.A. Blind Plant Manager Attachment c'RC Region III D.R. Hahn R.C. Callen S.
Hamming J.G.
Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick R.L.
Simms W.G. Smith, Jr.
C S.J.
Brewer D.W. Paul S.H. Steinhart J.L. Leichner J.A.
Isom D.G. Turner E.A. Smarrella J.C. Krieger D.F. Krause M.E. Russo 9406210296 940S31 PDR ADDCK 05000316 R
N.R.C.
OPERATING DATA REPORT DOCKET NO.
50-316 DATE 02/Jun/94 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D.
C.
Cook Unit 2
- 2. Reporting Period May 1994
- 3. Licensed Thermal Power (MWt) 3411 4.
Name Plate Rating (Gross MWe) 1133
- 5. Design Electrical Rating (Net MWe) 1090 6.
Maximum Dependable Capacity (GROSS MWe) 1100 7.
Maximum De endable Ca acit Net MWe 1060 notes p
p y
(
)
- 8. If Changes Occur in Capacity Ratings (Items no.
3 through
- 7) Since Last Report Give Reasons 9.
Power. Level To Which Restricted. If Any (Net MWe) 10.
Reasons For Restrictions. If Any:
11.
Hours in Reporting Period 12.
No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 14.
Hours Generator on Line
- 15. Unit Reserve Shutdown Hours 16.
Gross Therm.
Energy Gen.
(MWH) 17.
Gross Elect.
Energy Gen.
(MWH)
- 18. Net Elect.
Energy Gen..
(MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate 24.
Shutdowns Scheduled over Next Six Ref This Mo.
Yr.
744.0 744.0>>
0.0 744.0 0.0 1607162 489830 463733 100.0 100.0 58 '
57.2 0.0 Months (Type, to Date 3624 '
2366.8 0.0 2019 '0.0 4813808 1488180 1418788 55 '
55.7 36.9 35 '
41.7 Date,and Cumm.
143880.0 97215.8 0.0 93795.3 0.0 286'927902 93096080 89644770 66.3 66.3 59.6 58.1 16.1 Duration):
~duratio f
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forcast INITIALCRITICALITY INITIALELECTRICITY
~
COMMERCIAL OPERATION Achieved
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
UNIT TELEPHONE 50-316 TWO 02/Jun/94 JD Janisse 616-465-5901 DAY 94/05/01 94/05/02 94/05/03 94/05/04 94/05/05 94/05/06 94/05/07 94/05/08 94/05/09 94/05/10 94/05/11 94/05/12 94/05/13 94/05/14 94/05/15 94/05/16 AVERAGE DAILY POWER LEVEL 627 628 622 620 618 619 623 621 620 620 626 623 624 623 626 626 May 1994 DAY 94/05/17 94/05/18 94/05/19 94/05/20 94/05/21 94/05/22 94/05/23 94/05/24 94/05/25 94/05/26 94/05/27 94/05/28 94/05/29 94/05/30 94/05/31 AVERAGE DAILY POWER LEVEL 627 626 626 623 620 618 619 623 618 624 620 617 618 617 663
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: MAY 1994 UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
PAGE 1 OF 1
D.
C.
COOK UNIT 2 June 6,
1994 D. L. Bublick-(616) 465-5901 DURATION NO.
DATE TYPE HOURS METHOD OF SHUTTING DOWN REASON2 REACTOR3 LICENSEE EVENT REPORT NO.
SYSTEM CODE'OMPONENT CODE CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE None There were no unit shutdowns or significant power reductions fro~
73%
RTP this month.
1 F
S:
Forced Scheduled 2
Reason:
A:
Equipment Failure (Explain)
B:
Maintenance or Test C:
Refueling D:
Regulatory Restriction E:
Operator Training and License Examination F:
Administrative-G:
Operational Error (Explain)
H:
Other (Explain) 3 Method:
1:
Manual 2:
Manual Scram 3:
Other (Explain) 4Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 1061) 5Exhibit I:
Same
. Source
r4 C
DOCKET NO.:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
DATE:
PAGE 50-316 D.C.
Cook Unit 2 D. L. Bublick (616) 465-5901 June 6,
1994 Page 1 of 1 MONTHLY OPERATING ACTIVITIES MAY 1994 HIGHLIGHTS The unit entered the reporting period in Mode 1 at 63% RTP.
The unit exited this reporting period in Mode 1 at 73% RTP.
There were no challenges to the pressurizer safety valves or power operated relief.valves.
Gross Electrical generation for the month of May was 489830 MWH.
DETAILS 05-31-94 2312 Commenced reactor power increase to 1004 RTP.
0
.t t,