ML17331B393
| ML17331B393 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 05/18/1994 |
| From: | Fitzpatrick E INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| AEP-NRC-1166P, NUDOCS 9405240214 | |
| Download: ML17331B393 (3) | |
Text
A~~ CELERATED D. <TRIBUTION DEMONS ATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION'%BR:9405240214 DOC.DATE: 94/05/18 NOTARIZED: NO DOCKET g
FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana M
05000315 AUTH.NAME AUTHOR AFFILIATION FITZPATRICK,E.
(formerly Indiana 6 Michigan Ele RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Withdraws request for TS change re SG tube plugging
.criteria.
DISTRIBUTION CODE:
AOOID COPIES RECEIVED:LTR J ENCL
'P SIZE:
TITLE: OR Submittal:
General Distribution NOTES:
'RECIPIENT ID CODE/NAME PD3-1 LA HICKMAN,J INTERNAL: NRR/DE/EELB NRR/DRCH/HICB NRR/DSSA/SPLB NUDOCS-ABSTRACT OGC/HDS2 EXTERNAL: NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD3-1 PD NRR/DORS/OTS B NRR/DRPW NRR/DSSA/SRXB OC/LFDCB 01 NSIC COPIES LTTR ENCL 1
1 1
1 1
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 16 ENCL ~ U
Indiana Michigan Power Company P.O. Box 16631 Coiumbus, OH 43216 AEP:NRC:1166P Donald C.
Cook Nuclear Plant Unit 1 Docket No. 50-315 License No.
DPR-58 TECHNICAL SPECIFICATION CHANGE WITHDRAWAL UNIT 1 STEAM GENERATOR ALTERNATE PLUGGING CRITERIA U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555 Attn:
Mr. W. T. Russell May 18, 1994
Dear Mr. Russell:
We hereby withdraw our request for a technical specification (T/S) change to Cook Nuclear Plant Unit 1 Steam Generator Tube Plugging
- criteria, submitted in our letter AEP:NRC:1166 dated March 20, 1991.
This T/S change request proposed, beginning with Unit 1 Cycle 13, a 4-volt bobbin coil alternate plugging criterion that we are confident would assure continued safe operation of the Unit 1
We subsequently requested and have received interim Unit 1 steam generator tube plugging criteria for both Cycles 13 and 14 '
separate T/S change request for steam generator tube plugging
- criteria, applicable beyond Cycle 14, will be submitted in the future.
Such a request may incorporate either interim plugging criteria or alternate plugging criteria, depending upon the nature and availability of accepted industry standards at that time.
Sincerely, E.
E. Fitzpatrick
~
~
Vice President dr cc:
A. A. Blind G. Charnoff J.
B. Martin - Region III NFEM Section Chief NRC Resident Inspector J.
R. Padgett P
PDR 9405240214 94'0518.
PDR ADDCK 05000315