FORD 1
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9405230123
DOC.DATE: 94/05/12
NOTARIZED:
NO
DOCKET
FACIL:50-315 Donald
C.
Cook Nuclear
Power Plant, Unit 1, Indiana
M
05000315
50-316
Donald
C.
Cook Nuclear
Power Plant, Unit 2, Indiana
M
05000316
UTH.NAME
AUTHOR AFFILIATION
EENMAN,E.G.
Region
3 (Post
820201).
ECIP.NAME
RECIPIENT AFFILIATION
FITZPATRICK,E.
Co. (formerly Indiana
& Michigan Ele
SUBJECT:
Forwards
insp repts
50-315/94-08
& 50-316/94-08
on
940404-22
I
DISTRIBUTION CODE:
IEOID
COPIES
RECEIVED'LTRl ENCLl BISE'
+
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
ID CODE/NAME
PD3-1
INTERNAL: AEOD/DEIB
AEOD/DSP/TPAB
DEDRO
NRR/DRCH/HHFB
NRR/DRSS/PEPB
NRR/PMAS/ILPB2
~eB
D
~R.EG ~E
02
RGN3
FILE
01
EXTERNAL: EG&G/BRYCEIJ. H.
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
HICKMAN,J
AEOD/DSP/ROAB
AEOD/TTC
NRR/DORS/OEAB
NRR/DRIL/RPEB
NRR/PMAS/ILPBl
NUDOCS-ABSTRACT
OGC/HDS2
RES/HFB
NRC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
N
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM P 1-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS-YOU DON'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
22
ENCL
22
~p,S Afgy
+w*t +
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
801 WARRENVILLEROAD
LISLE. ILLINOIS60532-4351
MAY qq;9
Docket No. 50-315
Docket No. 50-316
Company
ATTN:
Mr. E.
E. Fitzpatrick
Senior Vice President
Nuclear Generation
1 Riverside Plaza
Columbus,
OH
43216
Dear Mr. Fitzpatrick:
This refers to the special
safety inspection
conducted
by Messrs.
James
A.
Isom and David J. Hartland of this office from April 4 through
22,
1994.
The inspection
focused
on the event involving the accumulation of silt in the
essential
service
water
(ESW)
supply lines to the Unit
1
and
2 "West" motor-
driven auxiliary feedwater
(AFW) pumps.
At the conclusion of the inspection,
the findings were discussed
with those
members of your staff identified in the
enclosed
report.
Areas examined during the inspection are identified in the report.
Within these
areas,
the inspection
consisted
oF
a selective
examination
oF procedures
and
representative
records,
observations,
and interviews with personnel.
Based
on the results of this inspection,
certain of your activities appeared
to
be
in violation of
NRC requirements,
as specified
in the
enclosed
Notice of
Violation (Notice).
The violation is of concern
because
the procedure
used to
flush the
ESW supply lines to the
AFW pumps
was
inadequate
to ensure
that
no
foreign material would accumulate
and possibly prevent sufficient ESW flow to the
pumps
upon demand.
Your response
to this violation should
include any additional actions to be taken to prevent other infrequently used
cooling loops from being subjected
to
a buildup of silt or other foreign matter
that could cause
a system
dependent
on
ESW to become
You are required
to respond
to this letter
and should follow the instructions
specified in the enclosed Notice when preparing your response.
In your response,
you should
document
the specific actions
taken
and
any additional
actions
you
plan
to prevent
recurrence.
After reviewing your response
to this Notice,
including your proposed corrective actions
and the results of future inspections,
the
NRC will determine
whether further
NRC enforcement
action is necessary
to
ensure
compliance with NRC regulatory requirements.
gyg05gg0)gg
940512
ADDCK 050003i 5
Q
Indiana Hichigan Power
Company
The
responses
directed
by this let;er
(and
the
accompanying
Notice)
are
not
subject
to the clearance
procedures
oF the Office of Management
and
Budget
as
required
by the Paperwork Reduction Act of 1980,
PL 96-51 1.
1n accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy of this
letter,
the enclosures,
and your response
to this letter will be placed
in the
NRC Public Document
Room.
We will gladly discuss
any questions
you have concerning this inspection.
Sincerely,
Edward
G.
Greenman,
Director
Division of Reactor Projects
Enclosures:
1.
2.
Inspection
Report
No.
50-315/94008(ORP);
50-316/94008(DRP)
cc w/enclosure:
A. A. Blind, Plant Manager
OC/LFOCB
Resident
Inspector, RIII
James
R. Padgett,
Michigan Public
Service
Commission
Michigan Department of
Public Health
D.
C.
Cook,
LPH,
S. Stein,
Indiana Nichigan
Power
Company
The
responses
directed
by this letter
(and
the
accompanying
Notice)
are
not
subject to the clearance
procedures
of the Office of Management
and
Budget
as
required
by the
Paperwork
Reduction Act of 1980,
PL 96-511.
In accordance
with 10 CFR 2.790 of the Commission's regulations,
a copy of this
letter,
the enclosures,
and your response
to this letter will be placed in the
NRC Public Document
Room.
We will gladly discuss
any questions
you have concerning this inspection.
Sincerely,
Enclosures:
1.
2.
Inspection
Report
No.
50-315/94008(DRP);
50-316/94008(DRP)
cc w/enclosure:
A. A. Blind, Plant Manager
OC/LFDCB
Resident
Inspector,
RIII
James
R. Padgett,
Michigan Public
Service
Commission
Michigan Department of
Public Health
D.
C.
Cook,
LPN,
S. Stein,
0
C
.
Edward
G.
Greenman,
Director
Division of Reactor Projects
R I
rsini
p/gi/pi
RADII
K opp
Rl ti,
p
Bu gess
RI I
I
Piro
ye[$j(
Company
The
responses
directed
.by this letter
(and
the
accompanying
Notice)
are
not
subject to the clearance
procedures
of the Office of Management
and
Budget
as
required
by the Paperwork Reduction Act of 1980,
PL 96-511.
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy of this
letter,
the enclosures,
and your response
to this letter will be placed
in the
NRC Public Document
Room.
Me will gladly discuss
any questions
you have concerning this inspection.
Sincerely,
Enclosures:
1.
2.
Inspection
Report
No.
50-315/94008(DRP);
50-316/94008(DRP)
'cc w/enclosure:
A. A. Blind, Plant Manager
OC/LFDCB
Resident
Inspector, RIII
James
R. Padgett,
Michigan Public
Service
Commission
Michigan Department of
Public Health
D.
C.
Cook,
LPM,
S. Stein,
Edward
G.
Greenman,
Director
Division of Reactor Projects