Text
ACCELERATED DI.
BUTION DEMONS ATION SYSTEM REGULATORY INFORMATION DISTRIBUTXON SYSTEM (RIDS)
DOCKET FACIL:50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana M
05000316 AUTH.NAME AUTHOR AFFILIATXON JANISSE,J.D.
Indiana Michigan Power Co. (formerly Indiana
& Michigan Ele BLIND,A.A.
Xndiana Michigan Power Co. (formerly Indiana
& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operatin t for Apr 1994 for DC Cook Nuclear Plant Unit 2.W 506 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
D RECXPXENT ID CODE/NAME PD3-1 PD XNTERNAL: AEOD/DOA 8
ZAB REG ILE 01 EXTERNAL: EG&G BRYCE,J.H NSIC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME HICKMAN,J AEOD/DSP/TPAB NRR/DRIL/RPEB RGN3 NRC PDR COPXES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 D
D D
NOTE TO ALL"RIDS" RECIPIENTS A
D D
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION
'f.ISIS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBEP. OF'COPIES REQUIRED:
LTTR 11 ENCL 11
> ~
I tI
indiana Michigan~
Power Company ~
Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 IMQIANSl MCHIGQM lPQSVM May 6, 1994 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, DE CD 20555 Gentlemen:
Pursuant to the requirements of Donald C.
Cook Nuclear Plant Unit 2 Technical Specification 6 ~ 9 ~ 1 ~ 10, the attached Monthly Operating Report for the month of April 1994 is submitted.
Respectfully, A.A. Blind Plant Manager Attachment c:
NRC Region III D.R.
Hahn R.C. Callen S.
Hamming J.G.
Keppler INPO Records Center ANI Nuclear Engineering Department E.ED Fitzpatrick R.L.
Simms W.G ~ Smith, Jr.
S.J.
Brewer D.W. Paul S.HE Steinhart J.L. Leichner J.A.
Isom D.G. Turner E.A. Smarrella J.C. Krieger D.F. Krause M.E. Russo
'BC 6 04
. "'q406 180 1,92 94050b
'DR,
";.'PDR<~/ADQ~tK 050005ib, ',
N.R.C.
OPERATING DATA REPORT DOCKET NO.
50-316 DATE 03/May/94 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D.
C.
Cook Unit 2
- 2. Reporting Period April 1994
- 3. Licensed Thermal Power (MWt) 3411 4.
Name Plate Rating (Gross MWe) 1133
- 5. Design Electrical Rating (Net MWe) 1090 6.
Maximum Dependable Capacity (GROSS MWe) 1100 7.
Maximum Dependable Capacity (Net MWe) 1060 notes 8
~ If Changes Occur in Capacity Ratings (Items no.
3 through 7) Since Last Report Give Reasons 9.
Power Level To Which Restricted. If Any (Net MWe) 10.
Reasons For Restrictions. If Any:
This Mo.
Yr. to Date Cumm.
- 11. Hours in Reporting Period 720. 0 2880. 0 143136. 0 12.
No. of Hrs. Reactor Was Critical 410
~ 7 1622. 8 96471. 8
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 14. Hours Generator on Line 158.5 1275.4 93051.3
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 16.
Gross Therm.
Energy Gen (MWH) 346047 3206646 285320740 17.
Gross Elect.
Energy Gen.
(MWH) 93380 998350 92606250
- 18. Net Elect.
Energy Gen.
(MWH) 88069 955055 89181037
- 19. Unit Service Factor 22.0 44.3 66.1
- 20. Unit Availability Factor 22.0 44.3 66.1
- 21. Unit Capacity Factor (MDC Net)
- 11. 5 31.3 59.6
- 22. Unit Capacity Factor (DER Net) 11 ~ 2 30.4 58.1 23.,Unit Forced Outage Rate
- 78. 0
- 53. 1
- 16. 3 24.
Shutdowns Scheduled over Next Six Months (Type, Date,and Duration):
R fuelin outa e to be in Se tember 2
1994 for an estimated ration of 70 da s.
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO-UNIT TELEPHONE 50-316 TWO 03/May/94 JD Janisse 616-465-5901 DAY 94/04/01 94/04/02 94/04/03 94/04/04 94/04/05 94/04/06 94/04/07 94/04/08 94/04/09 94/04/10 94/04/11 94/04/12 94/04/13 94/04/14 94/04/15 94/04/16 AVERAGE DAILY POWER LEVEL April 1994 DAY 94/04/17 94/04/18 94/04/19 94/04/20 94/04/21 94/04/22 94/04/23 94/04/24 94/04/25 94/04/26 94/04/27 94/04/28 94/04/29 94/04/30 AVERAGE DAILY POWER LEVEL 0
0 0
0 0
0 0
172 546 588 566 552 620 626
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: APRIL 1994 UNIT NAME:
DATE:
COMPLETED BY TELEPHONEs PAGE 1 OF 1
D. C.
COOK UNIT 2 May 9, 1994 R. D. Repnnells (616) 465-5901 DURATION NO.
DATE TYPE'OURS METHOD OF SHUTTING DOWN REASON~
REACTOR~
LICENSEE EVENT REPORT NO.
SYSTEM CODEi COMPONENT CAUSE AND CORRECTIVE ACTION CODEX'O PREVENT RECURRENCE 234 940221 F
561.5 H
94-01/U-2 SB ISV Repairs to the Main Generator were completed, Unit 2 was paralleled to the Grid on April 24, 1994.
1 F:
S Forced Scheduled 2
Reason:
A:
Ecpxipment Failure (Explain)
B:
Maintenance or Test C:
Refueling D:
Regulatory Restriction E:
Operator Training and License Examination F:
Administrative G:
Operational Error (Explain)
H:
Other (Explain) 3 Method:
1:
Manual 2:
Manual Scram 3:
Other (Explain) 4Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 1061) 5Exhibit I:
. Same Source
0 DOCKET NO.:
UNIT NAME COMPLETED BY:
TELEPHONE:
DATE:
PAGE 50-316 D.C. Cook Unit 2 R.
D. Reynnells (616) 465-5901 May 9, 1994 Page 1 of 2 MONTHLY OPERATING ACTIVITIES APRIL 1994 HIGHLIGHTS The unit entered the reporting period in Mode 4 at 0% RTP.
Main Turbine Generator repairs were completed with the Main Generator being paralleled to the Grid on April 24.
The unit exited this reporting period in Mode 1 at 624 RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross Electrical generation for the month of April was 93380 MWH.
DETAILS 04-09-94 04-13-94 04-19-94 04-20-94 04-24-94 04-25-94 1707 1800 2116 2218 1435 1512 0438 0507 2125 2200 1028 1155 1315 0639 Commenced RCS Heatup.
Entered Mode 3.
Commenced Reactor Startup.
Entered Mode 2.
Unit 2 Reactor is critical.
Commenced power increase to roll the Main Turbine.
Entered Mode 1.
Commence power reduction to Mode 2.
Entered Mode 2.
Commenced power increase to roll the Main Turbine.
Entered Mode 1.
Paralleled the Main Turbine Generator to the Grid, commenced power increase.
Reactor power stabilized at 29% RTP.
Commenced reactor power increase.
Reactor power stabilized at 604 RTP.
4
~ g 41 t
DOCKET O.:
UNIT NAME:
COMPLETED BY:
TELEPHONE-DATE:
PAGE 50-316 D.C.
Cook Unit 2 R.
D. Reynnells (616) 465-5901 May 9, 1994 Page 2 of 2 MONTHLY OPERATING ACTIVITIES APRIL 1994 1645 04-28-94 1335 1815 (DETAILS cont) 04-27-94 1435 Commence power reduction to 554 RTP.
Reactor power stabilized at 554 RTP.
Commenced power increase to 62% RTP.
Reactor power stabilized at 62% RTP.