Monthly Operating Rept for Apr 1994 for DC Cook Nuclear Plant Unit 1
ML17331B383
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 04/30/1994
From: Blind A, Janisse J
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9405190191
Download: ML17331B383 (10)


Text

P.CCELERATED DI BUTlON DEMONS TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET FACIL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Xndiana M

05000315 AUTH.NAME AUTHOR AFFILIATION JANISSE,J.D.

Indiana Michigan Power Co.

(formerly Indiana

& Michigan Ele BLIND,A.A.

Indiana Michigan Power Co.

(formerly Indiana

& Michigan Ele RECIP.NAME RECIPXENT AFFILIATION

SUBJECT:

Monthly operatin e t for Apr 1994 for DC Cook Nuclear Plant Unit 1.W/ 40506 ltr.

DISTRXBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

D RECIPIENT ID CODE/NAME PD3-1 PD INTERNAL: AEOD/DOA N

S.

EAB EG FILE 01 EXTERNAL: EG&G BRYCE,J.H NSXC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 RECXPXENT ID CODE/NAME HICKMAN,J AEOD/DSP/TPAB NRR/DRIL/RPEB RGN3 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 D

D D

NOTE TO ALL"RIDS" RECIPIENTS:

A D

D PLEASE HELP US TO REDUCE WASfEl CONTACT THE DOCUMENT CONTROL DESK ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 11 ENCL 11

indiana Ntichigan~

Power Company ~

Cook Nuclear Plant One Cook Place Bridgman, Ml 49106

~

616 465 5901 8

May 6, 1994 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

Pursuant to the requirements of Donald C.

Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of April 1994 is submitted.

Respectfully, A.A. Blind Plant Manager Attachment c'RC Region III D.R.

Hahn R.C. Callen S.

Hamming J.G.

Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick R. L.

Simms W.G. Smith, Jr.

S.J.

Brewer D.W. Paul S.H. Steinhart J.L. Leichner J.A.

Isom D.G. Turner E.A. Smarrella J.C. Krieger D.F. Krause M.E. Russo

N.R.C.

OPERATING DATA REPORT DOCKET NO.

50-315 DATE 02/May/94 COMPLETED BY JD Janisse TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.

C.

Cook Unit 1

2. Reporting Period April 1994
3. Licensed Thermal Power (MWt) 3250 4.

Name Plate Rating (Gross MWe) 1152

5. Design Electrical Rating (Net MWe) 1020 6.

Maximum Dependable Capacity (GROSS MWe) 1056 7.

Maximum Dependable Capacity (Net MWe) 1000 notes

8. If Changes Occur in Capacity Ratings (Items no.

3 through

7) Since Last Report Give Reasons 9.

Power Level To Which Restricted. If Any (Net MWe) 10.

Reasons For Restrictions. If Any:

This Mo.

Yr. to Date ll. Hours in Reporting Period 720.0 2880.0 12.

No. of Hrs. Reactor Was Critical 0.0 1013. 1

13. Reactor Reserve Shutdown Hours 0.0 0.0
14. Hours Generator on Line
0. 0 1013

~ 0

15. Unit Reserve Shutdown Hours 0.0 0.0
16. Gross Therm.

Energy Gen.

(MWH) 0 2226409

17. Gross Elect.

Energy Gen.

(MWH) 0 700060 18.

Net, Elect.

Energy Gen.

(MWH) 0 666378

19. Unit Service Factor 0.0 35.2
20. Unit Availability Factor 0.0 35 '
21. Unit Capacity Factor (MDC Net) 0.0 23

~ 1

22. Unit Capacity Factor (DER Net) 0.0 22 '
23. Unit Forced Outage Rate 0.0 0 '

24.

Shutdowns Scheduled over Next. Six Months (Type, Date,and None

25. If Shut Down At End of Repor,':"eiod, Estimated Date of MR 14 1994 IOÃ5"
26. Units in Test Status (Prior Igloo.ommercial Operation):

Forcast INITIALCRITICALITY o+o+

INITIALELECTRICITY

'OMMERCIAL OPERATIONo u MO OA

, 0'cL lQ

,'oo'CQ I o'0 tr Cumm.

169440.0 126667 '

463 '

124621 '

321.0 365752184 118722720 114188176 74.5 74.5 67.1 65 '6.0 Duration):

Startup:

Achieved

AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY 94/04/01 94/04/02 94/04/03 94/04/04 94/04/05 94/04/06 94/04/07 94/04/08 94/04/09 94/04/10 94/04/11 94/04/12 94/04/13 94/04/14 94/04/15 94/04/16 DOCKET NO.

UNIT TELEPHONE April 1994 AVERAGE DAILY POWER LEVEL 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 50-315 ONE 02/May/94 JD Janisse 616-465-5901 DAY 94/04/17 94/04/18 94/04/19 94/04/20 94/04/21 94/04/22 94/04/23 94/04/24 94/04/25 94/04/26 94/04/27 94/04/28 94/04/29 94/04/30 AVERAGE DAILY POWER LEVEL 0

0 0

0 0

0 0

0 0

0 0

0 0

0

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: APRIL 1994 UNIT NAME:

DATE COMPLETED BY:

TELEPHONE:

Page 1 of 1 D. C.

COOK UNIT 1 May 9, 1994 R. D. Reynnells, (616) 465-5901 DURATION NO.

DATE TYPE'OURS METHOD OF SHUTTING DOWN REASON~

REACTOR~

LICENSEE EVENT REPORT NO.

SYSTEM CODEX'OMPONENT CODE CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 308 940212 S

720 B/C N/A N/A N/A The unit remained shutdown for the cycle 13 to 14 maintenance/refueling outage through out this reporting period.

1 F:

Forced S:

Scheduled 2

Reason:

A:

Ecyxipment Failure (Explain)

B:

Maintenance or Test C:

Refueling D:

Regulatory Restriction E:

Operator Training and License Examination F:

Administrative G:

Operational Error (Explain)

H:

Other (Explain) 3 Method:

1:

Manual 2:

Manual Scram 3:

Automatic Scram 4:

Other (Explain) 4Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 1061) 5Exhibit I:

Same Source

Wj

~.

DOCKET O.:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

DATE:

PAGE:

50-315 D.C.

Cook Unit 1 R.

D. Reynnells (616) 465-5901 May 9, 1994 Page 1 of 1 MONTHLY OPERATING ACTIVITIES APRIL 1994 HIGHLIGHTS The unit entered this reporting period in Mode 6, with the core off loaded.

The unit remained shutdown during this reporting period in support of the cycle 13 to 14 maintenance/refueling outage.

Mode 6, refueling was entered on April 2 and the reactor core reload was completed on April 5.

The unit exited this. reporting period in Mode 5 at 04 RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross Electrical generation for the month of April was 0 MWH.

t DETAILS 04-02-94 0103 Commence fuel reload from the spent fuel pool to the core.

Entered Mode 6.

04-05-94 04-10-94 1058 1910 All fuel assemblies are in the core.

Entered Mode 5.

V

~

(

~

4

~

~

II