ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM t

t REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9404200297 DOC.DATE:

QJV$6$/"83.

NOTARXZED: NO DOCKET FACIL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana M

05000315 AUTH.NAME AUTHOR AFFILIATION JANISSE,J.D.

Indiana Michigan Power Co.

(formerly Indiana 6 Michigan Ele REYNNELLS,R.D.

Indiana Michigan Power Co.

(formerly Indiana 6 Michigan Ele +

BLIND,A.A.

Indiana Michigan Power Co.

(formerly Indiana

& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operatin t for Mar 1994 for DC Cook Nuclear Plant Unit 1.W/ 40 ltr.

DISTRIBUTXON CODE:

XE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

D RECIPIENT ID CODE/NAME PD3-1 PD INTERNAL: AEOD/DOA NR 4QORS/O AB EG FILE Ol EXTERNAL: EGGG BRYCE,J.H NSIC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 RECXPIENT ID CODE/NAME HICKMAN,J AEOD/DSP/TPAB NRR/DRXL/RPEB RGN3 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 D

D D

NOTE TO ALL"RIDS" RECIPIENTS:

D D

PLEASE HELP US TO REDUCE iVAFEE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR ll ENCL ll

indiana Mlchlgan Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 April 8, 1994 U.S. Nuclear Regulatory Commission ATTN:

Document. Control Desk Washington, D.C.

20555 Gentlemen:

Pursuant to the requirements of Donald C.

Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of March 1994 is submitted.

Respectfully, A.A. Blind Plant Manager Attachment ce NRC Region III D.R. Hahn R.C. Callen S.

Hamming J.G. Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick R.L.

Simms W.G. Smith, Jr.

S.J.

Brewer D.W. Paul S.H. Steinhart J.L. Leichner J.A.

Isom D.G. Turner E.A. Smarrella J.C. Krieger D.F. Krause M.E. Russo 9'404200297 940331

PDR, ADOCK 05000315 PDR

N.R.C.

OPERATING DATA REPORT DOCKET NO.

50-315 DATE 01/Apr/94 COMPLETED BY JD Janisse:

TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.

C.

Cook Unit 1

2. Reporting Period MAR 94
3. Licensed Thermal Power (MWt) 3250 4.

Name Plate Rating (Gross MWe) 1152 5.

Design Electrical Rating (Net,MWe) 1020 6.

Maximum Dependable Capacity (GROSS MWe) 1056 7.

Maximum Dependable Capacity (Net MWe) 1000 notes

8. If Changes Occur in Capacity Ratings (Items no.

3 through

7) Since Last Report Give Reasons 9.,Power Level To Which Restricted.

Xf Any (Net MWe) 10.

Reasons For Restrictions. If Any:

11. Hours in Reporting Period 12.

No. of Hrs. Reactor Was Critical

13. Reactor Reserve Shutdown Hours 14.

Hours Generator on Line

15. Unit Reserve Shutdown Hours 16.

Gross Therm.

Energy Gen.

{MWH) 17.

Gross Elect.

Energy Gen.

(MWH)

18. Net Elect.

Energy Gen.

(MWH)

19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate 24.

Shutdowns Scheduled over Next Six None This Mo.

Yr. to Date 744.0 2160 '

0.0 1013.1 0.0 0.0 0.0 1013.0 0.0 0.0 0 '226409 0

700060 0

666378 0.0 46.9 0.0 46.9 0.0

30. 9 0.0 30 '

0.0 0.0 Months {Type,Date,and Cumm.

168720.0 126667.5 463.0 124621.6 321 '

365752184 118722720 114 188 176 74 '

74 '

67.4 65.6 6 '

Duration):

25. If Shut Down At End of Report. Period, Estimated Date of Startup:

A rl1 26 1994

26. Units in Test Status (Prior to Commercial Operation):

Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved

AVERAGE DAILY POWER LEVEL (MWe-Net.)

DOCKET NO.

UNIT TELEPHONE MAR 94 50-315 ONE 11/Apr/94 JD Janisse 616-465-5901 DAY 94/03/01 94/03/02 94/03/03 94/03/04 94/03/05 94/03/06 94/03/07 94/03/08 94/03/09 94/03/10 94/03/11 94/03/12 94/03/13 94/03/14 94/03/15 94/03/16 AVERAGE DAILY POWER LEVEL 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 DAY 94/03/17 94/03/18 94/03/19 94/03/20 94/03/21 94/03/22 94/03/23 94/03/24 94/03/25 94/03/26 94/03/27 94/03/28 94/03/29 94/03/30 94/03/31 AVERAGE DAILY POWER LEVEL 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: MARCH 1994 UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

Page 1 of 1 D. C.

COOK UNIT I ~

April 2, 1994 R. D.

Re~el'616)465-5901 DURATION NO.

DATE TYPE'OURS METHOD OF SHUTTING LICENSEE DOWN 'VENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION REASON~

REACTOR~

REPORT NO.

CODEX'ODE~

TO PREVENT RECURRENCE 308 940212 S

744 B/C N/A N/A N/A The unit remained shutdown for the cycle 13 to 14 maintenance/refueling outage throughout this reporting period.

1 F:

S Forced Scheduled 2

Reason:

A:

Equipment Failure (Explain)

B:

Maintenance or Test C:

Refueling D:

Regulatory Restriction E:

Operator Training and License Examination F:

Administrative G:

Operational Error (Explain)

H:

Other (Explain) 3 Method:

1:

Manual 2:

Manual Scram 3:

Automatic Scram 4:

Other (Explain) 4Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 1061) 5Exhibit I:

Same Source

r

~

~

DOCKET UNIT NAME-'OMPLETED BY:

TELEPHONE:

DATE:

PAGE:

50-315 D.C.

Cook Unit 1 R.

D. Reynnells (616) 465-5901 April 2, 1994 Page 1 of 1

MONTHLY OPERATING ACTIVITIES MARCH 1994 HIGHLIGHTS The unit entered this reporting period in Mode 6, with the core off loaded.

The unit remained shutdown during this reporting period in support of the cycle 13 to 14 maintenance/refueling outage.

The unit exited this reporting period in Mode 6 at 04 RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross Electrical generation for the month of March was 0

MWH.

DETAILS None