ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM i"'REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9404200240 DOC.DATE: 94/04/13 NOTARIZED: NO DOCKET FACIL:50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana M
05000316 AUTH.NAME AUTHOR AFFILIATION FITZPATRICK,E.
Indiana Michigan Power Co. (formerly Indiana
& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION RUSSELL,W.T.
Document Control Branch (Document Control Desk)
SUBJECT:
Submits addi info re specific duration of 10CFR50,App J exemption for Unit 2,Cycle 9,in response to NRC 940405 telcon request.
DISTRIBUTION CODE:
A017D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: OR Submittal:
Append J Containment Leak Rate Testing NOTES D
'S RECIPIENT ID CODE/NAME PD3-1 LA HICKMAN,J INTERNAL: OC ~~F4 gG FI-LE, 01 S/DSIR/S IB EXTERNAL: NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD3-1 PD OGC/HDS2 RES/DE/SEB NSIC COPIES LTTR ENCL D
D S
D NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED'TTR 11 ENCL D
D
Indiana Michigan~
Power Company ~
P.O. Box 16631 Columbus, OH 43216 8
AEP'NRC'1204A Donald C.
Cook Nuclear Plant Unit 2 Docket No. 50-316 License No. DPR-74 REQUEST FOR ADDITIONALINFORMATION CONCERNING SPECIFIC DURATION OF 10 CFR 50, APPENDIX J EXEMPTION FOR UNIT 2 CYCLE 9 U.
S. Nuclear Regulatory Commission Document Control Desk Washington, D. C.
20555 Attn:
W. T. Russell April 13, 1994
Dear Mr. Russell:
In a telephone conference with your staff on April 5, 1994, we were requested to provide a specific duration for our 10 CFR 50, Appendix J exemption
- request, which was submitted under letter AEP:NRC:1204 on March 9, 1994.
That letter contained a request for a one-time schedular exemption from 10 CFR 50, Appendix J, Sections III.D.2(a) and III.D.3 (Type B and C leak rate tests).
Based on an estimated shutdown date of September 3,
- 1994, the duration of the exemption is 150 days.
The exemption will be effective from May 29,
- 1994, through October 26, 1994.
The significant hazards consideration per 10 CFR 50.92(c) and the justification for the regulation exemption per 10 CFR 50.12 provided in letter AEP:NRC:1204 are still applicable.
- Sincer, y,
E.
. Fitzpatric Vice President dr cc:
A. A. Blind G. Charnoff J
~ B. Martin - Region III NFEM Section Chief NRC Resident Inspector J.
R. Padgett l8007g l
~'9404200240 9404i3 PDR
,ADOCK 05000316 P. ',,PDR