Submits Addl Info Re Specific Duration of 10CFR50,App J Exemption for Unit 2,Cycle 9,in Response to NRC 940405 Telcon Request
ML17331B348
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 04/13/1994
From: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Russell W
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AEP:NRC:1204A, NUDOCS 9404200240
Download: ML17331B348 (2)


Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM i"'REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9404200240 DOC.DATE: 94/04/13 NOTARIZED: NO DOCKET FACIL:50-316 Donald C.

Cook Nuclear Power Plant, Unit 2, Indiana M

05000316 AUTH.NAME AUTHOR AFFILIATION FITZPATRICK,E.

Indiana Michigan Power Co. (formerly Indiana

& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION RUSSELL,W.T.

Document Control Branch (Document Control Desk)

SUBJECT:

Submits addi info re specific duration of 10CFR50,App J exemption for Unit 2,Cycle 9,in response to NRC 940405 telcon request.

DISTRIBUTION CODE:

A017D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal:

Append J Containment Leak Rate Testing NOTES D

'S RECIPIENT ID CODE/NAME PD3-1 LA HICKMAN,J INTERNAL: OC ~~F4 gG FI-LE, 01 S/DSIR/S IB EXTERNAL: NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD3-1 PD OGC/HDS2 RES/DE/SEB NSIC COPIES LTTR ENCL D

D S

D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED'TTR 11 ENCL D

D

Indiana Michigan~

Power Company ~

P.O. Box 16631 Columbus, OH 43216 8

AEP'NRC'1204A Donald C.

Cook Nuclear Plant Unit 2 Docket No. 50-316 License No. DPR-74 REQUEST FOR ADDITIONALINFORMATION CONCERNING SPECIFIC DURATION OF 10 CFR 50, APPENDIX J EXEMPTION FOR UNIT 2 CYCLE 9 U.

S. Nuclear Regulatory Commission Document Control Desk Washington, D. C.

20555 Attn:

W. T. Russell April 13, 1994

Dear Mr. Russell:

In a telephone conference with your staff on April 5, 1994, we were requested to provide a specific duration for our 10 CFR 50, Appendix J exemption

request, which was submitted under letter AEP:NRC:1204 on March 9, 1994.

That letter contained a request for a one-time schedular exemption from 10 CFR 50, Appendix J, Sections III.D.2(a) and III.D.3 (Type B and C leak rate tests).

Based on an estimated shutdown date of September 3,

1994, the duration of the exemption is 150 days.

The exemption will be effective from May 29,

1994, through October 26, 1994.

The significant hazards consideration per 10 CFR 50.92(c) and the justification for the regulation exemption per 10 CFR 50.12 provided in letter AEP:NRC:1204 are still applicable.

Sincer, y,

E.

. Fitzpatric Vice President dr cc:

A. A. Blind G. Charnoff J

~ B. Martin - Region III NFEM Section Chief NRC Resident Inspector J.

R. Padgett l8007g l

~'9404200240 9404i3 PDR

,ADOCK 05000316 P. ',,PDR