l ACCELERATED D> TRIBUTION DEMONS TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9401250242 DOC.DATE: g+~ig4 NOTARIZED: NO DOCKET FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana M
05000315 AUTH.NAME AUTHOR AFFILIATION TURNER,D.G.
(formerly Indiana 6 Michigan Ele BLIND,A.A.
(formerly 1ndiana
& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operatin t for Dec 1993 for DC Cook Nuclear Plant, Unit 1.W 4010 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT ID CODE/NAME PD3-1 PD INTERNAL: AEOD/DOA NRRLDORS OEAB BEG LE Ol EXTERNAL EGGG BRYCE g J
~ H NSIC COPIES LTTR ENCL 1
1 I
1 1
1 1
1 1
1 1
1 1
RECIPIENT ID CODE/NAME HICKMAN,J AEOD/DSP/TPAB NRR/DRIL/RPEB RGN3 NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 11 ENCL 11
( I
Indiana Michigan~
Power Company ~
Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 R
IMQIANA MCNE6ÃlN PQWM January 7,
1994 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
Pursuant to the requirements of Donald C.
Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of December 1993 is submitted.
Respectfully,
/.a6 A.A. Blind Plant Manager Attachment c;
QQC@N@>~~A D.R.
Hahn R.C. Callen S.
Hamming J.G.
Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick R.L.
Simms W.G. Smith, Jr.
S.J.
Brewer D.W. Paul S.H. Steinhart J.L. Leichner J.A.
Isom D.G. Turner E.A. Smarrella J.C. Krieger B.A. Svensson D.F. Krause M.E. Russo 256008
'WOi250242 93123i
H
N.R.C OPERATING DATA REPORT DOCKET NO ~
50-315 DATE 03/Zan/94 COMPLETED BY DG TURNER TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D.
C.
Cook Unit 1
- 2. Reporting Period DEC 93
- 3. Licensed Thermal Power (MWt)
'3250 4.
Name Plate Rating (Gross MWe) 1152
- 5. Design Electrical Rating (Net MWe) 1020
- 6. Maximum Dependable Capacity (GROSS MWe) 1056
- 7. Maximum Dependable Capacity (Net MWe) 1000 notes
- 8. If Changes Occur in Capacity Ratings (Items no.
3 through
- 7) Since Last Report Give Reasons
- 9. Power Level To Which Restricted. If Any (Net MWe)'0.
Reasons For Restrictions. If Any:
- 11. Hours in Reporting Period
- 12. No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator. on Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Therm. Energy Gen.
(MWH)
- 17. Gross Elect. Energy Gen.
(MWH) 18.
Net. Elect.
Energy Gen.
(MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate 24.
Shutdowns Scheduled over Next. Six Refuelin Outa e to be in Februar 12 1994 for This Mo.
Yr. to Date 744.0 8760.0 744 '
8760 '
0 0
0 ~ 0 744.0 8760.0 0 '
0 '
2396807 28083452 779730 9079300 752912 8759433 100.0 100.0 100.0 100.0 101.2 100.0 99 '
98 '
0.0 0 '
Months (Type, Date,and an estimated duration of 70 da s
CUIH1~
166560.0 125654.4 463 '
123608.6 321. 0 363525775 118022660 113521798 75.2 75.2 67.9 66.1 6 '
Duration):
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
UNIT 03/Zan/94 DG TURNER TELEPHONE 50-3 15 ONE 03/Jan/94 DG TURNER 616-465-5901 DAY 12/01/93 "12/02/9 3 12/03/93 12/04/93 12/05/93 12/06/93 12/07/93 12/08/93 12/09/93 12/10/93 12/11/93 12/12/93 12/13/93 12/14/93 12/15/93 12/16/93 DEC 93 AVERAGE DAILY POWER LEVEL 1013 1015 1021 1021 1020 1026 1026" 1019 1022 1021 1020 1018 1021 1020 1021 1020 DEC 93 DAY 12/17/93 12/18/93 12/19/93 12/20/93 12/21/93 12/22/93 12/23/93 12/24/93 12/25/93 12/26/93 12/27/93 12/28/93 X2/29/93 12/30/93 12/31/93 AVERAGE DAILY POWER LEVEL 1017 1020 1017 1024 1017 1018 1017 1022 1021 1020 1023 1007 988 948 892
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: DECEMBER 1993 UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
Page 1 of 1 D.
C.
COOK UNIT Jan 9, 1994 R.
D. Reynnells (616) 465-5901 NO.
DATE TYPE'URATION HOURS METHOD OF SHUTTING DOWN REASON REACTOR LICENSEE EVENT REPORT NO.
SYSTEM CODEX'OMPONENT CAUSE AND CORRECTIVE ACTION CODES TO PREVENT RECURRENCE None There were no unit shutdown or
-significant power reductions from 100%
RTP this month.
1 F
S Forced Scheduled 2
Reason:
A:
Equipment Failure (Explain)
B:
Maintenance or Test C:
Refueling D:
Regulatory Restriction E:
Operator Training and License Examination F:
Administrative G:
Operational Error (Explain)
H:
Other (Explain) 3 Method:
1:
Manual 2:
Manual Scram 3:
Other (Explain) 4Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 1061) 5Exhibit I:
Same Source
DOCKE O.:
UNIT NAME:
COMPLETED BY:
TELEPHONE-DATE PAGE:
50-315 D.C.
Cook Unit 1 R.
D. Reynnells (616) 465-5901 Jan 9, 1994 Page 1 of 1 MONTHLY OPERATING ACTIVITIES DECEMBER 1993 HIGHLIGHTS The unit entered the reporting period in Mode 1 at 100% RTP.
The unit exited this reporting period in Mode 1 at 894 RTP.
The unit commenced reactor power reduction at 0700 December 28 in accordance with the end of core power coast down plan developed by the Reactor Engineering Section.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross Electrical generation for the month of December was 779730 MWH.
DETAILS 12-28-93 0700 Commenced reactor power coast down in accordance with the end of core power coast down plan.
V
~
~
0
~
DOCKET NO:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
DATE:
PAGE:
50-315 D.C.
Cook Unit 1 M. E. Russo (616) 465-5901 January 7,
1994 1 of 1
MAJOR SAFETY-RELATED MAINTENANCE December 1993 No major safety-related maintenance items are included for the month of December.