ML17331B168
| ML17331B168 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 12/22/1993 |
| From: | Carteaux P INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | Phillips M NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9401060184 | |
| Download: ML17331B168 (9) | |
Text
ACCELERATED ISTIGBUTION DEMONSTRATION SYSTEM I
~I i
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION.NBR:9401060184 DOC.DATE: 93/12/22 NOTARIZED: NO DOCKET FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana M
05000315 50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana M
05000316 AUTH.NAME AUTHOR AFFILIATION CARTEAUX,P.F.
Indiana Michigan Power Co. (formerly Indiana 6 Michigan Ele RECIP.NAME RECIPIENT AFFILIATION R
PHILLIPS, M. P.
Document Control Branch (Document Control Desk)
SUBJECT:
Submits approved matls for use in developing 6 administering upcoming NRC SRO simulator exam. Brief summary of contents of boxes provided in Attachment A for convenience.
DISTRIBUTION CODE M003D COPIES RECEIVED LTR ENCL SIZE TITLE: Operator Requalification Program NOTES:
D RECIPIENT ID CODE/NAME PD3-1 PD INTERNAL: AEOD/DOA NRR/DRCH/HOLB RGN3 EXTERNAL: NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME HICKMAN,J
~/
CH/HHFBPT G FI=L 01 NSIC COPIES LTTR ENCL 1
1 1
1 1
1 D
D D
NOTE TO ALL"RIDS" RECIPIENTS:
D D
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 9
ENCL 9
Cook Nuclea~r" nt Training Cei~
P.O. Box 458 Bridginan, Ml 49106 616 465 5901 December 22, 1993 Donald C. Cook Nuclear Plant Units 1 8 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74
SUBJECT:
SRO INITIALLICENSE EXAMINATION Reference Materials U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Attention:
M. P. Phillips
Dear Mr. Phillips:
This letter transmits one set of approved (where appropriate) Cook Plant reference materials for use in developing and administering our upcoming NRC SRO Simulator examination.
The set of materials includes all of the items requested by Doug
- Shepard, NRC Region III, during a telephone conversation with Russell Scott, Replacement Training Program Administrator for Cook. Accompanying this letter are four (4) boxes containing these materials.
For your convenience a brief summary of the contents of these boxes is provided in Attachment A.
The Cook Plant Simulator has undergone signiTicant changes since the last NRC examination.
One of these changes involves the replacement of Foxboro Controls with Taylor Controllers.
These new controllers perform the same function as the Foxboro unit they replaced.
However, Controller Malfunctions may not function as described in the Malfunction Cause and Effects document.
Please contact Tim Garrison (616) 466-3300 extension 3004 if you have specific questions about these Malfunctions.
OHDOO3 9401060184 931222
.PDR ADOCK 05000315 V
I 1,
p II I~,
'E 4 t
II P
V C
1 I'I Jl
If you'have any questions regarding this submittal or require additional materials, please contact Mr. Russell Scott at (616) 466-3300 extension 3109.
Additionally per the request of Mr. Clyde Osterholtz, we have included a copy of the governing procedure for the Licensed Operator RequaliTication TAM 3.03. 'uestions relating to the Requalification Program should be directed to Mr. Bill Davidson at (616) 466-3300 extension 3110.
Sincerely,
. F. Carteaux Training Superintendent
/gh Enclosure A. A. Blind T. E. Murley J. A. Stubblefield R. T. Scott J. Isom, Senior NRC Resident Inspector, Cook Nuclear Plant
1 H
CV lit I
'I lk II
>h PAP I, '. f,W5 1
ll
~')$
~ <
I h
I ~
ae,
~
=r
~
s
ATTACHMENTA
SUMMARY
OF CONTENTS
~
Cook Plant Reference Materials in Support of January 28, 1994 USNRC Examination Complete Procedure Index e
One book is provided with all procedure indexes.
2.
Integrated Plant Procedures (unit 2 only)
Operations Head Procedures (OHPs)
Normal OHP 4021 Series 3.
Emergency and Abnormal Procedures (unit 2 only)
Operations Head Procedures (OHPs)
Abnormal OHP 4022 Series Emergency OHP 4023 Series 4.
Annunciator/Alarm Procedures (unit 2 only)
Annunciator - OHP 4024 Series 5.,
Emergency Plan Implementing Procedure e
Plant Manager Procedure PMP 2080.EPP Series.
6.
Technical Specifications Unit 2 Technical Specifications and Clarifications Page 1 of 2
~
P h
~)
ATTACHMENTA 7.
Piping and Instrument Diagrams e
This includes electrical one-line diagrams for 4160, 600, and 120 Volt AC and 250 Volt DC.
All flow PID Diagrams (5100 Series Drawings).
Electrical One Line Diagrams (12000 including 4160, 600, and 120V AC and 250 V DC Series.)
e Logic/Functional Diagrams covering all major instrument and control systems (98500 Series Drawings.)
8.
Technical Data Book The enclosed Technical Data Book does not have a controlled set of precautions, limitations, and setpoints.
This information is contained in individual plant and systems operating procedures as necessary.
9.
Simulator References Listing of pre-programmed initial conditions.
Malfunction cause and effect which includes an explanation of the ability to vary the severity of a particular malfunction.
Description of local operations and failure capability of instruments and components.
Differences between the simulator and Unit P2 control room.
10.
Additional Materials Required by Examinee e
TAM 3.03, Licensed Operator Requalification Program Page 2 of 2
~
~
r
~
~
saw
~ ~a u P
L
~ '
~ <
~
~