ML17331B140

From kanterella
Jump to navigation Jump to search
Forwards Analysis for TS Change to Allow Unit 1 SG Tube Interim Plugging Criteria of 1.0 Volt for Cycle 14,per NRC Request That Portions of Draft NUREG-1477 Be Incorporated in 930310 Lar.Affected TS Pages & Westinghouse Rept Also Encl
Date released: 05/31/2018 Download: ML17331B140


Forwards Analysis for TS Change to Allow Unit 1 SG Tube Interim Plugging Criteria of 1.0 Volt for Cycle 14,per NRC Request That Portions of Draft NUREG-1477 Be Incorporated in 930310 Lar.Affected TS Pages & Westinghouse Rept Also Encl
ML17334B496
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/15/1993
From: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: MURLEY T E
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-1477
Download: ML17334B496 (122)
Suppl Info for DC Cook Unit 1 Ipc.
ML17331B141
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/09/1993
From: Pitterle T
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To:
References
Download: ML17331B141 (4)
Proposed Tech Specs to Allow Unit 1 SG Tube Interim Plugging Criteria of 1.0 Volt for Cycle 14
ML17331B139
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/15/1993
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
References
Download: ML17331B139 (7)