Monthly Operating Rept for Nov 1993 for DC Cook Nuclear Plant Unit 1
ML17331B122
Person / Time
Site: Cook 
Issue date: 11/30/1993
From: Blind A, Reynnells R, Doreen Turner
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9312210047
Download: ML17331B122 (9)


Text

ACCELERATEDDISTRIBUTION DEMOlTPATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) ssgBgso DOCKET FACIL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana M

05000315 AUTH.NAME AUTHOR AFFILIATION TURNER,D.G.

Indiana Michigan Power Co.

(formerly Indiana 6 Michigan Ele REYNNELLS,R.D.

Indiana Michigan Power Co.

(formerly Indiana

& Michigan Ele BLIND,A.A.

Indiana Michigan Power Co.

(formerly Indiana 6 Michigan Ele RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operatin t for Nov 1993 for DC Cook Nuclear Plant Unit 1.W/ 3120 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

D RECIPIENT ID CODE/NAME PD3-1 LA HICKMAN,J INTERNAL: AEOD/DOA NR

/JUROR OEAB EG~FI LE 0 1 EXTERNAL EGGG BRYCE g J H

NSIC COPIES LTTR ENCL 3

3 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD3-1 PD AEOD/DSP/TPAB NRR/DRIL/RPEB RGN3 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 D

D D

NOTE TO ALL"RIDS" RECIPIENTS:

D D

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 14 ENCL 14

t

~

f r '

Indiana Mic Power Com Cook Nuclear ant One Cook Place Bridgman, Ml 49106 616 465 5901 IN!NEli8$l NSCNIGQN PQSFM December 3,

1993 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

Pursuant to the requirements of Donald C.

Cook Nuclear Plant

'nit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of,November 1993 is submitted.

A.A. Blind Plant Manager Attachment c!

NRC Region III D.R. Hahn R.C. Callen S.

Hamming J.G. Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick R.L.

Simms W.G. Smith, Jr.

S.J.

Brewer D.W. Paul S.H. Steinhart J.L. Leichner J.A. Isom D.G. Turner E.A. Smarrella J.C. Krieger B.A. Svensson D.F. Krause M.E. Russo 93122100474"',931130 PDR'

'ADOCK '05000315

'~ R......., '.PAR.

I(I

, ~

li A'

N.R.C.

OPERATING DATA REPORT DOCKET NO.

50-315 DATE 02/Dec/93 COMPLETED BY DG TURNER TELEPHONE 616-465-5901 OPERATING STATUS

l. Unit Name D.

C.

Cook Unit 1

2. Reporting Period NOV 93
3. Licensed Thermal Power (MWt) 3250 4.

Name Plate Rating (Gross MWe) 1152

5. Design Electrical Rating (Net MWe) 1020 6.

Maximum Dependable Capacity (GROSS MWe) 1056 7.

Maximum Dependable Capacity (Net MWe) 1000 notes

8. If Changes Occur in Capacity Ratings (Items no.

3 through 7) Since Last Report Give Reasons

9. Power Level To Which Restricted. If Any (Net MWe) 10.

Reasons For Restrictions. If Any:

This Mo.

Yr. to Date Cumm.

11. Hours in Reporting Period 720.0 8016.0 165816 '

12.

No. of Hrs. Reactor Was Critical 720.0 8016. 0 124910

~ 4

13. Reactor Reserve Shutdown Hours 0.0 0.0 463

~ 0

14. Hours Generator on Line 720.0 8016. 0 122864

~ 6

15. Unit Reserve Shutdown Hours 0 '

0.0 321 0

16. Gross Therm. Energy Gen.

(MWH) 2329064 25686645 361128968

17. Gross Elect.

Energy Gen.

(MWH) 755360 8299570 117242930

18. Net Elect.

Energy Gen.

(MWH) 729175

~ 8006521 112768886

19. Unit Service Factor 100.0 100.0 75 '
20. Unit. Availability Factor 100.0 100.0 75.1
21. Unit Capacity Factor (MDC Net) 101.3 99 '

67.8

22. Unit Capacity Factor (DER Net) 99.3 97 '

66 '

23. Unit Forced Outage Rate 0.0 0 ~ 0 6 ~ 1 24.

Shutdowns Scheduled over Next Six Months (Type, Date,and Duration):

to be in Februar 5

1994 for an estimated

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

~ 50-315 UNIT ONE 02/Dec/93 02/Dec/93 DG TURNER DG TURNER TELEPHONE 616-465-5901 DAY 11/Ol/93 11/02/93 11/03/93 11/04/93 11/05/93 11/06/93 11/07/93 11/08/93 11/09/93 11/10/93 11/11/93 11/12/93 11/13/93 11/14/93 11/15/93 11/16/93 NOV 93 AVERAGE DAILY POWER LEVEL 1012 1016 1010 1011 1014 1019 1017 1020 1018 1023 1020 1019 1020 1020 1019 1014 NOV 93 DAY 11/17/93 11/18/93 11/19/93 11/2O/93 11/21/93 11/22/93 11/23/93 11/24/93 11/25/93 11/26/93 11/27/93 11/28/93 11/29/93 11/30/93 AVERAGE DAILY POWER LEVEL 1021 1011 1019 1020 1007 946 951 1019

'020 1020 1019 1020 1018 1020 0

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: NOVEMBER 1993 UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

Page 1 of 1 D.

C.

COOK UNIT 1 Dec 1, 1993 R.

D. Reynnells (616) 465-5901 DURATION NO.

DATE TYPE HOURS METHOD OF SHUTTING DOWN REASON2 REACTOR~

LICENSEE EVENT REPORT NO.

SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION CODE4 CODE TO PREVENT RECURRENCE None There wer no unit shutdown or significant power reductions from 100%

RTP this month.

1 F

S:

Forced Scheduled 2

Reason:

A:

Equipment Failure (Explain)

B:

Maintenance or Test C:

Refueling D:

Regulatory Restriction E:

Operator Training and License Examination F:

Administrative G:

Operational Error (Explain)

H:

Other (Explain) 3 Method:

1:

Manual 2:

Manual Scram 3:

Automatic Scram 4:

Other (Explain) 4Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 1061) 5Exhibit I:

Same Source

DO(.

T NO.:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

DATE PAGE:

50-'3 15 D.C. Cook Unit 1 R.

D. Reynnells (616) 465-5901 Dec 1, 1993 Page 1 of 1 MONTHLY OPERATING ACTIVITIES NOVEMBER 1993 The unit entered the reporting period in Mode 1 at 1004 RTP.

The unit exited this reporting period in Mode 1 at 100% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross Electrical generation for the month of November was 755360 MWH.

DETAILS 11-21-93 11-22-93 11-24-93 1945 2145 0015 02'4 0 0230 0355 Commenced reactor power decrease to 904 RTP to remove. MSR's from service.

Reactor power is at 904.

Commenced reactor power increase to 954 RTP.

Reactor power is at 95%.

Commenced reactor power increase to 1004 RTP.

Reactor power is at 1004 RTP.

DOCKET NO:

UNIT NAME COMPLETED BY:

TELEPHONE:

DATE PAGE 50-315 D.C.

Cook Unit 1 M. E. Russo (616) 465-5901 December 3,

1993 1 of 1

MAJOR SAFETY-RELATED MAINTENANCE November 1993 No major safety-related maintenance items are included for the month of November.