yl
/+
December 3,
1 3
Docket Nos.
50-315 and 50-316
Dear Hr. Fitzpatrick:
DISTRIBUTION Pocket=-Fi-l.e NRC 5 LPDRs J.
Roe J. Zwolinski J.
Hickman C. Jamerson Hr.
E.
E. Fitzpatrick, Vice President Indiana Michigan Power Company c/o American Electric Power Service Corporation 1 Riverside Plaza
Jorgensen, RIII A. R. Blough
SUBJECT:
DONALD C.
COOK NUCLEAR PLANT, UNIT NOS.
1 AND 2
RESPONSE
TO NRC BULLETIN 93-02, "DEBRIS PLUGGING. OF EMERGENCY CORE COOLING SUCTION STRAINERS" (TAC NO. M86550)
This letter acknowledges receipt of your responses dated June ll, 1993, and August 6, 1993, to NRC Bulletin 93-02 (Bulletin).
The Qulletin was issued Hay ll, 1993, to all nuclear power reactor licensees.
It requested licensees to identify fibrous material in the primary containment, take any necessary compensatory
- measures, and remove any such material.
Your response stated that fibrous filter material, such as described in the Bulletin, was identified as being used in your containment, that the material as configured would remain confined in the event of a LOCA; however, the material has been removed from Unit 2 and will be removed from Unit 1 during the next outage of sufficient duration.
Based on the above response, we consider your actions and commitments to be acceptable.
Please retain any records of your actions in response to this Bulletin, as subsequent inspection activities may be conducted in regards to this issue.
Should you have any questions, please contact me at (301) 504-3017.
Sincerely, Original Signed By:
John B. Hickman, Project Manager Project Directorate III-1 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation cc:
see next a
e LA:PD31 P '
A D:PD3 CJamerson J
ckman:jkd ARBlou h 12 3
93 12 P 93 12 0 93 OFFICIAL RECORD COPY FILENAME: G:iWPDOCSiDCCOOKiC086550.LTR 93121302?3 931203 PDR ADOCK 05000315 9
PaR
~C IRIILK~~ ~V
l
'j$
0 I
II t
u r
'~8 Relay 0
Op
- 0 C
O
+~
~O
++*++
UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 December 3,
1993 Docket Nos.
50-315 and 50-316 Mr. E.
E. Fitzpatrick, Vice President Indiana Michigan Power Company c/o American Electric Power Service Corporation 1 Riverside Plaza
- Columbus, Ohio 43215
Dear Hr. Fitzpatrick:
SUBJECT:
DONALD C.
COOK NUCLEAR PLANT, UNIT NOS.
1 AND 2
RESPONSE
TO NRC BULLETIN 93-02, "DEBRIS PLUGGING OF EMERGENCY CORE COOLING SUCTION STRAINERS" (TAC NO. H86550)
This letter acknowledges receipt of your responses dated June 11,
- 1993, and August 6, 1993, to NRC Bulletin 93-02 (Bulletin).
The Bulletin was issued May 11, 1993, to all nuclear power reactor licensees.
It requested licensees to identify fibrous material in the primary containment, take any necessary compensatory
- measures, and remove any such material.
Your response stated that fibrous filter material, such as described in the Bulletin, was identified as being used in your containment, that 'the material as configured would remain confined in the event of a LOCA; however, the material has been removed from Unit 2 and will be removed from Unit 1 during the next outage of sufficient duration.
Based on the above response, we consider your actions and commitments to be acceptable.
Please retain any records of your actions in response to this Bulletin, as subsequent inspection activities may be conducted in regards to this issue.
Should you have any questions, please contact me at (301) 504-3017.
Sincerely, John B. Hickman, Project Manager Project Directorate III-1 Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation cc:
see next page
Mr. E.
E. Fitzpatrick Indiana Michigan Power Company CC:
Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attorney General Department of Attorney General 525 West Ottawa Street
- Lansing, Michigan 48913 Township Supervisor Lake Township Hall Post Office Box 818 Bridgman, Michigan 49106 Al Blind, Plant Manager Donald C.
Cook Nuclear Plant Post Office Box 458 Bridgman, Michigan 49106 U.S. Nuclear Regulatory Commission Resident Inspector Office 7700 Red Arrow Highway Stevensville, Michigan 49127 Gerald Charnoff, Esquire
- Shaw, Pittman, Potts arid Trowbridge 2300 N Street, N.
W.
Washington, DC 20037 Mayor, City of Bridgman Post Office Box 366 Bridgman, Michigan 49106 Special Assistant to the Governor Room 1 State Capitol
- Lansing, Michigan 48909 Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health Department of Public Health 3423 N. Logan Street P. 0.
Box 30195
- Lansing, Michigan 48909 Donald C.
Cook Nuclear Plant Mr. S.
Brewer American Electric Power Service Corporation 1 Riverside Plaza
- Columbus, Ohio 43215