Requests Exemption from Administering Operational Portion of Annual Operator Requalification Exam in Jan-Feb 1994,in Order to Prepare Licensed Operators for Successful Restart of Unit 1 Following Upcoming Refueling Outage Mods to CRs
ML17331A997
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/04/1993
From: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AEP:NRC:1195, NUDOCS 9310080047
Download: ML17331A997 (7)


Text

D A

NOTES:

ACCELERATED DOCUMENT DISTtuBUTION SYSTEM REGUOIORY YNFORMATYON DYSTRYBU+N SYSTEM (RYDS)

" ACCESSION NBR:9310080047 DOC.DATE: 93/10/04 NOTARIZED: YES DOCKET FACIL:50-33.5 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana M

05000315~

p0-316 Donald C.

Cook Nuclear Power Plant, Unit 2, Indiana M

05000316 AUTH.NAME AUTHOR AFFILIATION FITZPATRICK,E.

Indiana Michigan Power Co. (formerly Indiana 6 Michigan Ele I RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Requests exemption from administering operational portion of annual operator requalification exam in Jan-Feb 1994,in order to prepare licensed operators for successful restart of Unit 1 following upcoming refueling outage mods to CRs.

/

DISTRIBUTION CODE:

M003D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Operator Requalification Program RECIPIENT ID CODE/NAME PD3-1 PD INTERNAL: AEOD/DOA NRR/DRCH/HOLB RGN3 COPIES LTTR ENCL RECIPIENT ID CODE/NAME WETZELgB NRR/J3RCH/HHFBPT g~EG ~F5 01 COPIES LTTR ENCL D

EXTERNAL: NRC PDR NSIC NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065} TO ELIMINATEYOUR NAME FROM D!STRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

D D

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 9

ENCL G

p E

Indiana Michigan~

Power Compat~

P.O. Box 16631 Columbus, OH 43216 AEP NRC:1195 10 CFR 55.59(a)(2)

Donald C.

Cook Nuclear Plant Units 1 and 2

Docket Nos.

50-315 and 50-316 License Nos.

DPR-58 and DPR-74 10 CFR 55.11 EXEMPTION FROM OPERATIONAL EXAMINATION 10CFR55.59(a)(2)

REQUIREMENTS U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C.

20555 Attn:

T. E. Murley October 4, 1993

Dear Dr. Murley:

The purpose of this letter is to request an exemption from administering the operational portion of the annual operator requalification examination in January February, 1994.

We have discussed this testing change with the Region III Operator Licensing Staff and were advised to request this exemption.

We will administer the operational portion in the May June,

1994, time frame.

Upcoming refueling outage modifications to the Cook Nuclear Plant control rooms necessitate a change in our requalification program curriculum in order to prepare our licensed operators for a

successful restart of Unit 1 following these modifications.

In order to accomplish the necessary training related to these modifications, we propose to move the operational examination portion of the annual requalification examination to a period following start-up of Unit 1.

The written examination, including static and in-plant JPMs, will remain as previously scheduled during January February, with only the operational portion delayed until May June, 1994.

The operational examination will be administered on schedule in

January, 1995, which will be consistent with the annual examination requirement cited in 10 CFR 55.59(a)(2).

The modifications mentioned above include replacing all control room Foxboro controllers with Taylor model 30 controllers, which provide the same or similar controller functions and indications.

Further, the facility plans to initiate a control room redesign modification which will alter the control room arrangement and orientation.

The controller modification has been installed in our site specific simulator, and the control room redesign will be 3190 8 04009731 400 PDR ADOCK 05000315 U

PDR

C l

Dr. T. E. Murley AEP $ NRC: 1195 implemented in the latter part of

October, 1993.

These modifications will be implemented in Unit 1

during the next scheduled refueling outage (February April, 1994).

Movement of the operational examination willprovide more simulator training time prior to Unit 1 start-up.

This, in con)unction with our change in curriculum, will better prepare our operating staff for the start-up of Unit 1 and the administration of the annual operating examination.

This 55.11 exemption request is submitted pursuant to 10 CFR 55.9

and, as such, an oath statement is attached.

Sincerely, E. E. Fitz atrick Vice President dr Attachment cc:

A. A. Blind G. Charnoff J.

B. Martin NFEM Section Chief NRC Resident Inspector J.

R. Padgett

STATE OF OHIO)

COUNTY OF FRANKLIN)

E. E. Fitzpatrick, being duly sworn, deposes and says that he is the Vice President of licensee Indiana Michigan Power Company, that he has read the forgoing 10 CFR 55.11 EXEMPTION REQUEST FROM OPERATIONAL EXAMINATION and knows the contents thereof; and that said contents are true to the best of his knowledge and belief.

Subscribed and sworn to before me this ~N day of 19 ~3 NOT Y PUBLIC BITING D. HILL IIOTARY PUBLIC. STATE OF OIO MYCOMMISSION EXPIRESMMM