ML17331A968

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Aug 1993 for DC Cook Nuclear Power Plant,Unit 2 & Revised Repts for June & Jul 1993.Revised Repts Reflect Changes of Reported Max Dependable Capacity & Unit Capacity Factor
ML17331A968
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 09/06/1993
From: Blind A
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17331A969 List:
References
NUDOCS 9309220197
Download: ML17331A968 (2)


Text

ACCELERA"I'E DOCUMENT DISTRJ UTION SYS'I'EM REGULAT INFORMATION DISTRIBUTION STEM (RIDS) 1(

ACCESSION NBR:9309220197 DOC.DATE: 93/09/06

-NOTARIZED: NO DOCKET FACIL:50-316 Donald C.

Cook Nuclear Power Plant, Unit 2, Indiana M

05000316 AUTH.NAME ~

AUTHOR AFFILIATION BLINDS'A.A.

Indiana Michigan Power Co. (formerly Indiana 6 Michigan Ele RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards monthly operating rept for Aug 1993 for DC Cook Nuclear Power Plant, unit 2

6 revised repts for June 6 Jul 1993.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR

)

ENCLi SIZE: IO'IV TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

D RECIPIENT ID CODE/NAME PD3-1 LA WETZEL,B INTERNAL: AEOD/DOA NR BORS-AB EG Ol EXTERNAL: EGGG BRYCEiJ.H NSIC COPIES LTTR ENCL 3

3 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD3-1 PD AEOD/DSP/TPAB NRR/DRIL/RPEB RGN3 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 A

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE FIELP US TO REDUCE WASTE! CONTACI'lIE DOCUMI'N'I'ON'I'IU)l DLSK, ROOM Pl-37 (EXT. 504-204I5) TO ELIMINATEYOUR NAME FI<OM DIS'I'RIIII3'I'ION LISTS FOR DOCUMENTS YOU DON"I'EED!

. y)

D TOTAL NUMBER OF COPIES REQUIRED:

LTTR 14 ENCL 14

Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 September 6I 1993 INMNA NICNIGQN PQWM U.S. Nuclear Regulatory Commission ATTN:

Document, Control Desk Washington, D.C.

20555 Gentlemen:

Pursuant to the requirements of Donald C.

Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of August 1993 is submitted.

Also attached, please find revised copies of the Operating Data Reports for the months of June and July, 1993.

The revised reports reflect changes of the reported "Maximum Dependable Capacity (Net MWe)

Item 7" and the "Unit Capacity Factor (MDC Net)

Item 21".

Respectfully, A.A. Blind Plant Manager Attachment c'RC Region III D.R.

Hahn R.C. Callen S.

Hamming J.G. Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick R.L.

Simms W.G. Smith, Jr.

S.J.

Brewer D.W. Paul S.H. Steinhart J.L. Leichner J.A.

Isom D.G. Turner E.A. Smarrella J.C. Krieger B.A. Svensson D.F. Krause M.E. Russo 220

~."'309220197 930906 PDR ADOCK 05000316 R

", 'DR