ML17331A901
| ML17331A901 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 06/30/1993 |
| From: | Blind A, Janisse J, Doreen Turner INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9307190115 | |
| Download: ML17331A901 (8) | |
Text
.ACCELERATE DOCUMENT DISTRIBUTIONSYSTEM REGULAT INFORMATION DISTRIBUTIONtSTEM (RIDE)
ACCESSION gBR: 9307190115 DOC. DATE: S~N~N NOTARIZED: NO DOCKET FACIL.:50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana M
05000316 AUTH.NAME AUTHOR AFFILIATION TURNER,D.G.
Indiana Michigan Power Co. (formerly Indiana a Michigan Ele JANISSE,J.D.
Indiana Michigan Power Co. (formerly Indiana a Michigan Ele ~
BLIND,A.A.
Indiana Michigan Power Co. (formerly Indiana
& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operati e t for June 1993 for DC Cook Nuclear Plant, Unit 2.W 930706 ltr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
D RECIPIENT ID CODE/NAME PD3-1 LA DEAN,W COPIES LTTR ENCL 3
3 1
1 RECIPIENT ID CODE/NAME PD3-1 PD COPIES LTTR ENCL 1
1 INTERNAL: AEOD/DOA NRRJ3ORS/OEAB EG FIL 01 1
1 1
1 1
1 AEOD/DSP/TPAB NRR/DRIL/RPEB RGN3
'1 1
1 1
1 1
EXTERNAL: EGSG BRYCEFJ.H NSIC 1
1 1
1 NRC PDR
.1, 1
R D
NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'7 NEED!
D TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL 14
t
}
'0 h
t
~
indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49t06 616 465 5901 IiNBMANSl NliCMGQH PQWM July 6, 1993 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
Pursuant to the requirements of Donald C.
Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of June 1993 is submitted.
Respectfully, A.A. Blind Plant Manager Attachment c
NRC Region III D.R.
Hahn R.C. Callen S.
Hamming J.G. Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick R.L.
Simms W.G. Smith, Jr.
S.J.
Brewer D.W. Paul S.H. Steinhart J.L. Leichner J.A.
Isom D.G. Turner E.A. Smarrella J.C. Krieger B.A. Svensson D.F. Krause M.E. Russo 9307k%'0215 9'30630 PDR"'"ADOCK 050003ih R
N.R.C.
OPERATING DATA REPORT DOCKET NO.
50-316 DATE 02-Jul-93 COMPLETED BYDG Turner and JD Janisse TELEPHONE 616-465-5901 D.
C.
Cook Unit June OPERATING STATUS
- 1. Unit Name
- 2. Reporting Period
- 3. Licensed Thermal Power (MWt) 4.
Name Plate Rating (Gross MWe)
- 5. Design Electrical Rating (Net MWe) 6.
Maximum Dependable Capacity (GROSS MWe) 7.
Maximum Dependable Capacity (Net MWe) 2 93 3411 1133 1090 notes
- 8. If Changes Occur in Capacity Ratings (Items no.
3 through 7). Since Last Report Give Reasons:
- Unit thermal power reduced to 704 RTP for fuel conservation.
MDC Gross changed from 1100 to 730 MWe MDC Net changed from 1060 to 692 MWe.
Power reduction of 06/11/93 is prorated into MDC Net Unit Capacity Factors.
9.
Power Level To Which Restricted. If Any (Net MWe) 692 MWe 10.
Reasons For Restrictions. If Any: See line 8 for explanation 11.
Hours in Reporting Period 12.
No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 14.
Hours Generator on Line
- 15. Unit Reserve Shutdown Hours 16.
Gross Therm.
Energy Gen.
(MWH) 17.
Gross Elect.
Energy Gen.
(MWH)
- 18. Net Elect.
Energy Gen.
(MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
- 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate 24.
Shutdowns Scheduled over Next Six NONE This Mo.
Yr. to Date 720.0 4343.0 720.0 4343.0 0.0 0.0 720.0 4343.0 0.0 0.0 1969509 14123070 620770 4624280 594960 4471480 100.0 100.0 100.0 100.0 99.9 Zeo.8 75.8 94.5 0.0 0.0 Months (Type, Date, and Cumm.
135839.0 90700.5 0.0 87659.4 0.0 271710842 88378310 85143652 65.7 65.7 60.2 58.5 15.7 Duration):
- 25. If Shut Down At End of Report Period, Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
50-316 UNIT TWO DATE 02-Jul-93 COMPLETED BYDG Turner and JD Janisse TELEPHONE 616-465-5901 DAY MONTH AVERAGE DAILY POWER LEVEL June 93 DAY AVERAGE DAILY POWER LEVEL 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 1073 1071 1072 1064 1062 1057 1055 1054 1064 1061 847 719 719 716 708 708 17 18 19 20 21 22 23 24 25 26 27 28 29 30 706 705 698 698 695 694 689 693 693 691 691 691 690 706
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: JUNE 1993 UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
D. C.
COOK (JNIT 2 July 8, 1993 R. D. Reynnells (616) 465-5901 DURATION NO.
DATE TYPE HOURS METHOD OF SHUTTING DOWN REASON REACTOR LICENSEE EVENT REPORT NO SYSTEM CODE%
COMPONENT CODE~
CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 228 930611 S
N/A N/A N/A N/A N/A The reactor power was reduced to 70%
RTP on 930611 to extend the time interval between Unit 1 and ~
Unit 2 1994 refueling outages.
The Unit remained at the 70%
power level for the rest of the month.
1 F:
S Forced Scheduled 2
Reason:
A:
Equipment Failure (Explain)
B:
Maintenance or Test C:
Refueling D:
Regulatory Restriction E:
Operator Training and License Examination F:
Administrative G:
Operational Error (Explain)
H:
Other (Explain) 3 Method:
1:
Manual 2:
Manual Scram 3:
Other (Explain) 4Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 1061) 5Exhibit I:
Same Source
( ~
I Ii DOCKET UNIT NAME:
COMPLETED BY:
TELEPHONE:
DATE'AGE:
50-316 D.C.
Cook Unit 2 R.
D. Reynnells (616) 465-5901 July 8, 1993 Page 1 of 1 MONTHLY OPERATING ACTIVITIES June 1993 HIGHLIGHTS The unit entered the reporting period in Mode 1 at 1004 RTP.
The reactor power was reduced to 70% RTP on 930611 to extend the time interval between Unit 1 and Unit 2 1994 outages.
The unit exited this reporting period in Mode 1 at 70% RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross Electrical generation for the month of June was 620720 MWH.
DETAILS 6-11-93 0810 1245 Commenced reactor power decrease to 70%
RTP to extend the time period between Unit 1 and Unit 2 1994 refueling outages.
Reactor power is at 704 RTP.
DOCKET NO UNIT NAME:
COMPLETED BY:
TELEPHONE:
DATE PAGE 50-316 D.C.
Cook Unit 2 M. E. Russo (616) 465-5901 July 6, 1993 1 of 1 MAJOR SAFETY-RELATED MAINTENANCE June 1993 No major safety-related maintenance items are included for the month of June.