Requests Extension of 2 Months to Respond to Requirements of NUREG-0612,Sections 2.2,2.3 & 2.4.Addl Time Required to Evaluate Combination of Potential Dropped Load Events
ML17331A808
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/22/1981
From: Maloney G
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Harold Denton
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0612, RTR-NUREG-612 AEP:NRC:00514B, AEP:NRC:514B, NUDOCS 8109290295
Download: ML17331A808 (4)


Text

1 I

t I 1

.I p~ c 4h'ltd $

INDIANA L MICHIGAN ELECTRIC COMPANY P. O.

BOX 18 80WLIN G GR E EN STATION HEW YORK, N. Y. I0004 September 22, 1981 AEP:NRC:005148 Donald C.

Cook Nuclear Plant Unit Nos.

1 and 2

Docket Nos.

50-315 and 50-316 License Nos.

DPR-58 and DPR-74 CONTROL OF HEAVY LOADS Qc Hr. Harold R. Denton, Director Office of Nuclear Reactor Regulation v

U.S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Hr. Denton:

Cz This letter requests an extension of two months to respond to the requirements set forth in NUREG-0612, "Control of Heavy Loads", Sections. 2.2, 2.3 and 2.4.

Our review is progressing in each of these sections, but more time is needed to evaluate the combination of potential dropped load events.

Additionally, our July 31, 1981 response to Section 2.1 (AEP:NRC:0514) coIITIIitted to complete by September 22, 1981 the painting of the load path on El.

650'n the Auxiliary Building.

This work has not yet been started for the following reasons.

A purchase order was placed with Carboline Company, Divi-sion of Sun Oil, on August 14, 1981 for 70 gallons of Carboline Protective Coating.

The promised delivery date was September 4, 1981.

We were notified by Carboline on September 10, 1981 that their plant was on strike.

On September 17, 1981, we were again notified that the strike was settled and delivery is now expected the week of September 21, 1981.

It is now anticipated that the load path painting in the Auxiliary Building will be complete on October 22, 1981.

Lastly, AEP drawing No. 12-5170 attached to our above 0=I1tioned letter of July 31, 1981 contained an administrative error in that 1t in: i'ted that Elevation 609'f the Auxiliary Building would be painted.

Please note that the correct intention is to only paint the sections marked on the drawing corresponding to Elevation 650'f the Auxiliary Building.

cc: John E. Dolan - Columbus R. C. Callen G. Charnoff R.

W. Jurgensen D. V. Shaller Joe Williams, Jr.

Resident Inspector at Cook Plant - Bridgman 8l09290295 810922 PDR ADOCK OS000315 P

PDR V

t uly rs, P

Mal e

V e Pre d

t go~1 S

1, ',l I

>5

{i.

l I

1 1!

"r j/

4 '

c "-

4 I

V l'

I, I

n r

September 4, 1985 R

I

'i i

5XMGUTI{}N rocket File o encl.

RBH-Rdg-.=w/omncl-.

~

~

~

~

~

~

CParrish w/o encl.

MSlosson w/o encl DOCKET NO(S).

50-315/316 N. John Dolan, Vice President Indiana and Michigan Electric. Company c/o American Electric Power Sergice Corporation 1 Riverside Plaza

Columbus, Ohio 43216

SUBJECT:

D.C.

COOK UNITS 1 AND.2 The following documents concerning our review of the subject facility are transmitted for your information.

D Notice of Receipt of Application, dated D Draft/Final Environmental Statment, dated D Notice of Availabilityof Draft/Final Environmental Statement, dated D Safety Evaluation Report, or Supplement No.

, dated D Notice of Hearing on Application for Construction Permit, dated D Notice of Consideration of Issuance of Facility Operating License, dated D Monthly Notice; Applications and Amendments to Operating Licenses Involving no Significant Hazards Considerations, dated D Application and Safety Analysis Report, Volume D Amendment No.

to Application/SAR dated D Construction Permit No. CPPR-D Facility Operating License No.

, Amendment No.

, Amendment No.

dated

, dated D Order Extending Construction Completion Date, dated XX Other (Specify)

Bi-weekl notice coverin eriod of August 28, 1985.

Expiration date for hearin re uests and comments September 27, 1985.

Enclosures:

As stated Division of Licensing ORB81 Office of Nuclear Reactor regulation CC:

oFFice~

suRNAMe&

DATe+

ORM1'OL...

CParri s h/d 9/

/85 NRC FORM 318 (1/84) NRCM 0240

f'-

~

Lra

<t pl.

('f q

I

~

~

~

~ >"

1 J

'I ll

~ 4'

~ '

I P

~

t. ~

C I

P" I

~ g

~ C

~e c'~~ S '~

P

) )

' t