MONTHYEARIR 05000335/20250102024-10-21021 October 2024 Notification of St. Lucie Plant Units 1 & 2 Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000335/2025010 and 05000389/2025010 IR 05000335/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000335/2024011 and 05000389/2024011 IR 05000335/20240052024-08-22022 August 2024 Updated Inspection Plan for St. Lucie, Units 1 & 2 - Report 05000335/2024005 and 05000389/2024005 IR 05000335/20240022024-08-13013 August 2024 Integrated Inspection Report 05000335-2024002 and 05000389-2024002 IR 05000335/20244012024-06-0303 June 2024 Security Baseline Inspection Report 05000335/2024401 and 05000389/2024401 IR 05000335/20240012024-05-10010 May 2024 Integrated Inspection Report 05000335/2024001 and 05000389/2024001 IR 05000335/20230062024-02-28028 February 2024 Annual Assessment Letter for St Lucie Units 1 & 2 - Report 05000335/2023006 and 05000389/2023006 IR 05000335/20230042024-01-24024 January 2024 – Integrated Inspection Report 05000335/2023004 and 05000389/2023004 IR 05000335/20230032023-11-0606 November 2023 – Integrated Inspection Report 05000335/2023003 and 05000389/2023003 IR 05000335/20233012023-09-20020 September 2023 NRC Operator License Examination Report 05000335/2023301 and 05000389/2023301 IR 05000335/20230022023-08-0707 August 2023 Integrated Inspection Report 05000335/2023002 and 05000389/2023002 IR 05000335/20230102023-06-30030 June 2023 Notification of St. Lucie Units 1 & 2 – Focused Engineering Inspection (FEI) 05000335/2023010 and 05000389/2023010 and Initial Information Request IR 05000335/20234032023-06-29029 June 2023 Security Inspection Report 05000335/2023403 and 05000389/2023403 IR 05000335/20234022023-06-20020 June 2023 – Security Baseline Inspection Report 05000335/2023402 and 05000389/2023402 IR 05000335/20234012023-05-16016 May 2023 – Cyber Security Inspection Report 05000335/2023401 and 05000389/2023401 (Cover Letter) IR 05000335/20230012023-05-0909 May 2023 – Integrated Inspection Report 05000335/2023001 and 05000389/2023001 IR 05000335/20234202023-03-21021 March 2023 Security Baseline Inspection Report 05000335/2023420 and 05000389/2023420 IR 05000335/20220062023-03-0101 March 2023 Annual Assessment Letter for St. Lucie Units 1 & 2 (Report 05000335/2022006 and 05000389/2022006) IR 05000335/20220042023-02-10010 February 2023 – Integrated Inspection Report 05000335/2022004 and 05000389/2022004 IR 05000335/20220112022-12-27027 December 2022 – Triennial Fire Protection Inspection Report 05000335/2022011 and 05000389/2022011 IR 05000335/20220032022-11-0404 November 2022 – Integrated Inspection Report 05000335/2022003 and 05000389/2022003 ML22208A1762022-08-0404 August 2022 Review of the Fall 2021 Steam Generator Tube Inspection Report IR 05000335/20220022022-08-0101 August 2022 Integrated Inspection Report 05000335/2022002 and 05000389/2022002 ML22210A0782022-07-22022 July 2022 Stl 2022003 Document Request IR 05000335/20220122022-06-29029 June 2022 Biennial Problem Identification and Resolution Inspection Report 05000335 2022012 and 05000389 2022012 IR 05000335/20224012022-05-20020 May 2022 Security Baseline Inspection Report 05000335/2022401 and 05000389/2022401 IR 05000335/20220012022-05-12012 May 2022 Integrated Inspection Report 05000335/2022001 and 05000389/2022001 IR 05000335/20220102022-04-27027 April 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000335/2022010 and 05000389/2022010 IR 05000335/20214022022-04-0404 April 2022 Material Control and Accounting Program Inspection Report 05000335/2021402 and 05000389/2021402 - Public IR 05000335/20210062022-03-0202 March 2022 Annual Assessment Letter for St. Lucie, Units 1 & 2 (Report No. 05000335/2021006 and 05000389/2021006) IR 05000335/20210042022-02-14014 February 2022 Integrated Inspection Report 05000335/2021004 and 05000389/2021004 IR 05000335/20214032021-12-14014 December 2021 Security Baseline Inspection Report 05000335/2021403 and 05000389/2021403 IR 05000335/20210102021-12-0707 December 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000335/2021010 and 05000389/2021010 IR 05000335/20210032021-11-0303 November 2021 Integrated Inspection Report 05000335/2021003 and 05000389/2021003 IR 05000335/20210052021-08-25025 August 2021 Updated Inspection Plan for St. Lucie Plant Units 1 & 2 (Report 05000335/2021005 and 05000389/2021005) IR 05000335/20210022021-08-10010 August 2021 Integrated Inspection Report 05000335/2021002 and 05000389/2021002 IR 05000335/20214012021-06-23023 June 2021 Security Baseline Inspection Report 05000335/2021401 and 05000389/2021401 IR 05000335/20213012021-06-21021 June 2021 NRC Examination Report 05000335/2021301 and 05000389/2021301 IR 05000335/20210012021-05-12012 May 2021 Integrated Inspection Report 05000335/2021001 and 05000389/2021001 IR 05000335/20200062021-03-0303 March 2021 Annual Assessment Letter for St. Lucie Nuclear Plant, Unit 1 and Unit 2 Report 05000335/2020006 and 05000389/2020006 IR 05000335/20203012021-02-16016 February 2021 NRC Operator License Examination Report 05000335/2020301 and 05000389/2020301 IR 05000335/20200042021-02-0808 February 2021 Integrated Inspection Report 05000335/2020004 and 05000389/2020004 and Independent Spent Fuel Storage Installation (ISFSI) Inspection 07200061/2020002 IR 05000335/20204012021-01-0505 January 2021 Security Baseline Inspection Report 05000335/2020401 and 05000389/2020401 IR 05000335/20200112020-12-16016 December 2020 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000335/2020011 and 05000389/2020011 IR 05000335/20200032020-10-30030 October 2020 Integrated Inspection Report 05000335/2020003 and 05000389/2020003 ML20296A3732020-10-22022 October 2020 Security Inspection Report IR 05000335/20200052020-08-24024 August 2020 Updated Inspection Plan for St. Lucie Plant, Unit 1 and 2 (Report 05000335/2020005 and 05000389/2020005) IR 05000335/20200022020-07-29029 July 2020 St.Lucie Units 1 & 2 Integrated Inspection Report 05000335/2020002, 05000389/2020002, and Independent Spent Fuel Storage Installation Inspection (Lsfsi) 07200061/2020001 IR 05000335/20200102020-07-16016 July 2020 Biennial Problem Identification and Resolution Inspection Report 05000335/2020010 and 05000389/2020010 IR 05000335/20200012020-05-0505 May 2020 Integrated Inspection Report 05000335/2020001 and 05000389/2020001 and Exercise of Enforcement Discretion 2024-09-18
[Table view] Category:Letter
MONTHYEARL-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums IR 05000335/20250102024-10-21021 October 2024 Notification of St. Lucie Plant Units 1 & 2 Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000335/2025010 and 05000389/2025010 ML24227A9702024-10-18018 October 2024 Letter to Kenneth Mack Dir, License and Reg Compliance, NextEra Energy, Inc Response to Request Re Engagement Re Sub License Renewal Environmental Review - St Lucie Nuclear Plant 1 and 2 L-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) ML24255A3092024-09-30030 September 2024 SLRA - Revised SE Letter L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes 05000335/LER-2024-001, Unplanned Reactor Scram2024-09-25025 September 2024 Unplanned Reactor Scram IR 05000335/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000335/2024011 and 05000389/2024011 L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 IR 05000335/20240052024-08-22022 August 2024 Updated Inspection Plan for St. Lucie, Units 1 & 2 - Report 05000335/2024005 and 05000389/2024005 L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis IR 05000335/20240022024-08-13013 August 2024 Integrated Inspection Report 05000335-2024002 and 05000389-2024002 L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review 05000389/LER-2024-003, Unplanned Reactor Scram2024-08-0505 August 2024 Unplanned Reactor Scram L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan 05000389/LER-2024-002-01, Safety Injection Tank Vent Through Wall Leakage2024-07-11011 July 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review ML24172A1562024-06-27027 June 2024 Relief Request - PSL2-I5-RR-01 Proposed Alternative to Amse Code XI Code Examination Requirements - System Leakage Test of Reactor Pressure Vessel Bottom Head and Class 1 and 2 Piping in Covered Trenches L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports IR 05000335/20244012024-06-0303 June 2024 Security Baseline Inspection Report 05000335/2024401 and 05000389/2024401 ML24135A0642024-05-17017 May 2024 Correction Letter - Amendment Nos. 253 and 208 Regarding Conversion to Improved Standard Technical Specifications L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation IR 05000335/20240012024-05-10010 May 2024 Integrated Inspection Report 05000335/2024001 and 05000389/2024001 ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report ML24108A0632024-04-18018 April 2024 – Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection L-2024-064, Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report2024-04-17017 April 2024 Florida Power & Light Company - 10 CFR 50.46 - Emergency Core Cooling System SBLOCA 30-Day Report L-2024-056, Annual Radiological Environmental Operating Report for Calendar Year 20232024-04-17017 April 2024 Annual Radiological Environmental Operating Report for Calendar Year 2023 L-2024-054, 2023 Annual Environmental Operating Report2024-04-0909 April 2024 2023 Annual Environmental Operating Report 2024-09-09
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Decemb~r21, 2017 Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division Florida Power & Light Co.
Mail Stop EX/JB 700 Universe Blvd.
Juno Beach, FL 33408
SUBJECT:
ST. LUCIE PLANT UNIT NO. 1 - REVIEW OF THE FALL 2016 STEAM GENERATOR TUBE INSERVICE INSPECTION REPORT FOR REFUELING OUTAGE 27 (CAC MF9659; EPID L-2017-LLL-0012)
Dear Mr. Nazar:
By letter dated April 27, 2017 (Agencywide Documents Access and Management System Accession No. ML17117A334), Florida Power & Light Company (the licensee) submitted information summarizing the results of the fall 2016 steam generator tube inspections at St. Lucie Plant Unit No. 1. These inspections were performed during Refueling Outage 27 in accordance with Technical Specification Section 6.8.4.1.
The Nuclear Regulatory Commission staff has completed its review of the information provided, concludes that the licensee provided the information required by their technical specifications, and that no followup is required at this time. The staff's review of the report is enclosed.
27//#.*
Perry H. Buckberg, Senior Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-335
Enclosure:
As stated cc: ListServ
REVIEW OF THE 2016 STEAM GENERATOR TUBE INSERVICE INSPECTION REPORT ST. LUCIE PLANT UNIT NO. 1 DOCKET NO. 50-335 CAC NO. MF9659; EPID L-2017-LLL-0012 By letter dated April 27, 2017 (Agencywide Documents Access and Management System Accession No. ML17117A334}, Florida Power & Light Company (the licensee) submitted information summarizing the results of the fall 2016 steam generator (SG) tube inspections at St. Lucie Plant Unit No. 1. These inspections were performed during Refueling Outage (RFO) 27.
St. Lucie Unit 1 has two replacement SGs designed and fabricated by Babcock and Wilcox International that were installed in 1997. Each SG has 8,523 thermally treated Alloy 690 tubes with a nominal outside diameter of 0.75 inches and a nominal wall thickness of 0.045 inches.
The tubes are arranged in a triangular pattern with a pitch of approximately 1.0 inch. During manufacturing, the tubes were hydraulically expanded at each end for the full depth of the tubesheet. The tubesheet is 21.5-inches thick; with the cladding, the tubesheet is 21.875-inches thick. The tubes are supported by lattice grid tube supports and fan bars; the lowest fan bar is also referred to as a collector bar since all other fan bars connect to it. All supports are constructed from Type 410 stainless steel. During manufacturing, the U-bend region of the tubes in rows 1 through 20 were stress relieved after bending. The smallest U-bend radius occurs in row 3 and is 3.905 inches. The row 1 U-bend radius measures 4.272 inches.
This was the sixth inservice inspection for the replacement SGs. At the end of RFO 27 in 2016, the replacement SGs had accumulated 198.18 effective full-power months of operation.
The licensee provided the scope, extent, methods, and results of their SG tube inspections in the April 27, 2017, inspection report in accordance with their technical specification (TS) requirements. In addition, the licensee described corrective actions, such as tube plugging, taken in response to the inspection findings.
Based on its review of the report submitted, the Nuclear Regulatory Commission staff has the following observation:
- No tube wear exceeded the TS plugging limit of 40-percent through-wall. Some tubes were plugged to support an operational assessment until the next planned primary-side inspection in RFO 30. No primary-side inspections are planned for RFO 28 or 29.
Based on a review of the information provided by the licensee, the staff concludes that the licensee provided the information required by their TSs. The SG tube inspections at St. Lucie Unit 1 appear to be consistent with the objective of detecting potential tube degradation and inspection results appear to be consistent with industry operating experience at similarly designed and operated units.
Enclosure
M. Nazar
SUBJECT:
ST. LUCIE PLANT UNIT NO. 1 - REVIEW OF THE FALL 2016 STEAM GENERATOR TUBE INSERVICE INSPECTION REPORT FOR REFUELING OUTAGE 27 (CAC MF9659; EPID L-2017-LLL-0012) DATED DECEMBER 21, 2017 DISTRIBUTION:
PUBLIC RidsACRS_MailCTR Resource AHuynh, NRR RidsNrrPMStLucie Resource RidsNrrDorlLpl2-2 Resource AJohnson, NRR RidsNrrLABClayton Resource RidsRgn2Mai1Center Resource PKlein, NRR RidsNrrDlmrMccb Resource LPL2-2 R/F ADAMS Access1on Num ber: ML17331A685 *b>Ye-ma,*1 OFFICE D0RL/LPL2-2/PM D0RL/LPL2-2/LA DLMR/MCCB/BC* D0RL/LPL2-2/BC D0RL/LPL2-2/PM NAME PBuckberg BClayton SBloom UShoop PBuckberg DATE 12/11/17 12/07/17 11/13/17 12/20/17 12/21/17 OFFICIAL RECORD COPY