ML17331A643

From kanterella
Jump to navigation Jump to search
Summary of 810114 Meeting W/Vendor in Bethesda,Md,Re Plan for Reload ECCS Analysis.Implementation of Icecon Code to Compute LOCA Containment Pressure During Reflood & Reflex Code to Computer Reflood Transient Approved
ML17331A643
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 01/27/1981
From: Audette R
Office of Nuclear Reactor Regulation
To: Speis T
Office of Nuclear Reactor Regulation
Shared Package
ML17319A770 List:
References
NUDOCS 8102230759
Download: ML17331A643 (5)


Text

r Distribution~

Central File JAN S 7

~~ j@

RSB Reading File R. Audette MEMORANDUM FOR:

T. P. Speis, Chief, Reactor Systems

Branch, D

>gS FROM:

R.

F. Audette. Section C, Reactor Systems Bran DQ,N~~111A>>'"

SUBJECT:

D. C.

COOK - UNIT 1 RELOAD ECCS ANALYSIS

'4 The purpose of this meeting held on January 14, 1981 in Bethesda was to describe Exxon's plans for the forthcoming relodd ECCS analysis to the staff. A list of meeting attendess is shown on the attachment.

The analysis for Cycle 6 will use all of Exxon's latest approved models, and will Offer in several respects from their previous analytical process.

As a result Exxon expects to show an allowable increase in Fqi from 1.95 to over 2.0 while satisfying all requir-ements of Appendix K.

The principal changes in this analysis relative to previous will consist of the following:

1.

The use of Exxon's ICECON code to compute the LOCA containment pressure during reflood instead of the NSSS supplier's analysis as in previous reload analyees.

2.

The use of Exxon's REFLEX,code to compute the LOCA reflood tr ansient instead of the RELAP 4-EM/FLOOD code.

3.

A revised TOODEE-2 fuel heatup model.

The two new codes and the TOODEE-2 revision have been previously reviewed and approved for licensing analysis by the staff, so that the proposed analytical pi ocess present no new codes or procedures to be reviewed for the D.C. Cook 81 application.

The staffkreview will consist of a review of the plant specific analysis only.

Exxon glans to submit the analysis near the end of February 1981 including a new FqT curve to be used in the Technical SpeAficationsse Plant startup is scheduled for July, so that staff review and acceptance would be allowed over a 3 to 4 month span.

It was indicated to the Exxon staff that this would allow adequate time for the RSB staff to review the plant analysis.

Enclosure:

As Stated 8 l 0223Q jfgP cc:

P.g Check G. Mazetis R. F. Audette Reactor Systems Branch Division of Systems Integration OFFICEtA SURNAME)

S. ya

<>D. Fie r

~

~

~ e ~

~ ~ ~ ~ ~ ~ ~ s

~

s t II

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ops

~

e a.

J, lgatt o

B.Sheron

"""V"Par@.i W.Johnso

,.RSB "G

zetis

"'Ol')jet'/Hl'"

~

~ ~ ~ ~

0 ~

DSI: RS FAu'det'te bdg" a0'f/27/'N"""

NRC FORM 318 (lo/80) ARCM 0240 OFFICIAL RECORD COPY o USGP0: 1980-329 824

~'

q gg $ ~1 1

3K" 1

~it RE0tr c<

P0 UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 3'7 1981 MEMORANDUM FOR:

T.

P. Speis, Chief, Reactor

-Systems

Branch, DSI FROM:

SUBJECT:

R.

F. Audette, Section C, Reactor Systems

Branch, DSI D. C.

COOK UNIT 1

RELOAD ECCS ANALYSIS The purpose of this meeting held on January 14, 1981 in Bethesda was to describe Exxon's plans for the forthcoming reload ECCS analysis to the staff.

A list of meeting attendess is shown on the attachment.

The analysis for Cycle 6 will use all of Exxon's latest approved

models, and will differ in several respects from their previous analytical process.

As a result Exxon expects to show an allowable increase in Fq'rom 1.95 to over 2.0 while satisfying all requir-ements of Appendix K.

The principal changes in this analysis relative to previous will consist of the following:

1.

The use of Exxon's ICECON code to compute the LOCA containment pressure during reflood instead of the NSSS supplier's analysis as in previous reload analyses.

2.

The use of Exxon's REFLEX code to compute the LOCA reflood transient instead of the RELAP 4-EM/FLOOD code.

3.

A revised TOODEE-2 fuel heatup model.

The two new codes and the TOODEE-2 revision have been previously reviewed and approved for licensing analysis by the staff, so that the proposed analytical process present no new codes or procedures to be reviewed for the D.C.

Cook Pl application.

The staff review will consist of a review of the plant specific analysis only.

Exxon glans to submit the analysis near the end of February 1981 including a new Fq'urve to be used in the Technical Specifications.

Plant startup is scheduled for July, so that staff review and acceptance would be allowed over a 3 to 4 month span.

It was indicated to the Exxon staff that this would a1low adequate time for the NRt staff to y ant analysis.

fr e

R.

F ~ Audette Reactor Systems Branch Division 'of Systems, Integration

Enclosure:

As Stated cc:

P.

Check T. Novak S.

Varga D. Fieno G. Mazetis S. Miner J. Watt

\\

B. Sheron V. Panciera W. Johnson

D. C.

Cook - Unit 1

Rel oad ECCS Analysis January 14, 1981 Meetin Attendess I

Exxon G. Owsley J.

Morgan R. Collingham G. Jensen NRC S. Miner G. Mazetis J. Watt R. Audette AEP V. Mann

g 0

la