Forwards Two Revised Pages Correcting Administrative Errors in 810108 Submittal (AEP:NRC:00398)
ML17331A585
Person / Time
Site: Cook  
Issue date: 01/16/1981
From: Hunter R
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Harold Denton
Office of Nuclear Reactor Regulation
References
AEP:NRC:00398B, AEP:NRC:398B, NUDOCS 8101230529
Download: ML17331A585 (11)


Text

REGULATOR) ilFORMATION DISTRIBUTION S EM (RIDS)

ACCESSION NBR;8101230529 DOC ~ DATE: 81/01/16 NOTARIZED:

NO FACIL:50 315 Donald C ~

Cook Nuclear Power Plant~

Unit i~ Indiana 50003 50-316 Donald CD Cook Nuclear Power Plantr Unit 2r Indiana 8

0 0

16 AUTH'AME AUTHOR AFFILIATION HUNTERgR,ST Indiana 8 Michigan Electric Co,

'N RECIP ~ NAME RECIPIENT AFFILIATION DENTONgH ~ Ro Office of Nuclear Reactor Regulationr Director

SUBJECT:

Forwards two revised pages cor recting administrative err ors in 810108 submittal (AEP:NRC:00398),

DISTRIBUTION CODE:

A001S COPIES RECEIVED:LTR

~

ENCL

~

SIZEo TITLE: General Distribution for af ter Issuance of Operating License NOTES: ILE:3 copies all material.

Send 3 copies of all material to IEE, 05000315 05000316 RE C IPIENT ID CODE/NAME ACTION:

VARGA,S, Oq INTERNAL: D/DIRrHUM FACO8 IE,E 06 11-G FILE 01 COPIES LTTR ENCL 13 1

1 2

2 1

0 1

1 RECIPIENT ID CODE/NAME DIRg DIY OF LIC NRC -PDR 02 OR ASSESS BR 10 COPIES LTTR ENCL 1

1 1

1 0

EXTERNAL: ACRS NSIC 09 05 16

'16 1

1 LPDR 03 1

1 po TOTAL NUMBER OF COPIES REQUIRED'TTR

~'

-~

INDIANA L MICHIGAN ELECTRIC COMPANY nI'crc laJ

&rn

  • CD C/)

C

-P. O.

BOX 18

'BOWLING GREEN STATION

-NEW YORK, N. Y. 10004 January 16, 1981 AEP:NRC:00398B Donald C.

Cook Nuclear Plant Unit Nos.

1 and 2

Docket Nos.

50-315 and 50-316 License Nos.

DPR-58 and DPR-74 Post TMI Requirements (NUREG-0737)

Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Denton:

The purpose of this letter is to transmit two (2) revised pages which correct errors of an administrative nature in A'ttachment 1 of our submittal dated January 8,

1981 (AEP:NRC:00398).

The revisions are indi-cated by bars in the right hand margin and should be inserted into Attachment 1

to our AEP:NRC:00398 submittal, replacing its corresponding page which is to be discarded.

The correction on page 3 is due to the fact that the review of plant surveillance testing data is conducted by the supervision for the department responsible for conducting the surveillance test.

The performance of plant surveillance testing and review of the data is not limited to the Operations Department as the original wording in Attachment 1 might have implied.

On page 13 we inadvertently omitted the proposed implementation date for the silver zeolite cartridge purge unit to be installed in the basement area (Item b of our response) by January 31, 1981.

The actual installation of this equipment took place on January 13, 1981.

We hope that these revisions will not cause any inconvenience during your review effort.

cc:

attached Very truly yours, unter Vice President PDOi S

I/(

P'

~

~

\\

I

~,

e'

Mr. Harold R. Denton AEP:NRC:00398B cc:

R.

C. Callen G. Charnoi'f John E. Dolan - Columbus R.

W. Jurgensen D. V. Shaller - Bridgman Region III Resident Inspector at Cook Plant - Bridgman

ATTACHt1ENT TO AEP:NRC:00398B

q Ol I

l

~

I

4l

~

~

A formal new procedure which meets the requirements stated in Itc~ I.C 6 has been implemented at the Plant-for ttie handling of non-, NRC Notices, such as NSSS Vendor Notices,

'and INPO Notices.

Consistent with ifie requirements for an 'Operatin'g Exp'erience Assess-ment'roup as outlined in iir. Denton's October 30, 1979 letter to all operating nuclear plan'ts, procedures for handlin'g NRC, vendor and industry-related notices will be modified to directly involve the.'STA in office duty'n an immediate safety assessment function.

If it is found that the notice

.contains information of signil'icant importance <hat should not wait'for

.emphasis through the usual routing, this group wi-11 act promptly to take appropriate action.

All NRC, vendors, industry and internal Cook Plant Notices will be reviewed by the

'STA in office duty,'or 'trend analysis.

RESPON'SE TO I.<Es~l I.C.6 VERIFY CORPECT PERFORMANCE OF OPERATING.ACTIVITI'ES:

This, requ"iremrent, fo'rmally. issue8 by NUREG-0737, has been reviewed for

, its.'impact 'on Cook Plani'o'p'eiating activiti~., -Lip currently,,have in place an effective system of ver'.fying the correct, performance of operating activities, the -essential elements of which are described

below, Conducting surveillance on the Reactor Protection and Engineered Sdre-guar s System during plant operation requires Shift Supervisor or Opera~:-'"",po,',;.'>q Fngineer approval prior to start.

Plant surveillance testing is in accordance with approved schedules and procedures.

Oata are reviewed by the responsible department's supervision performing the survei.llance.

The dai ly master schedule for completion of equi red surveillance is reviewed by 'the Operating 'Engineer or Shift'perating Eng'ineer to determine current status.

Clearance Permits to remove essential equipment fromservice are prepared by an Operating Engineer or by the Shift Operating Engineers.

To insure that the ControlRoom is aware of equipment status, the permits are sent to the Unit Supervisor who directs their implementation.

Return to service is in the reverse order of the above with the final acceptance for system operation being made by the Operating Engineer or Shift Operating Engineer.

System lineup of the safety-related system requires independent verification of valve lineup after it has been out of service for maintenance or following surveillance testing.

4

~

In addition, there are available for. use throughout the';plant ten Eberline RAS-1 regulated air samplers, which accept either TEDA impregnated charcoal or SIlver Zeolite cartridges.

In addi'tion to the equipment normally available in We regular radio-

'.chemistry counting'acility, the'.following analysis equipnent is available or analysis o-the Silver Zeojite cartr'idges that might M used in an emergency:

a.

A 4" x 4" NaI crystal connected:to a Packard 1024 channel i~)CA is located in the 1'ow background counting facility.

b.

In the basement assembly area there will, by 1/d3I/81, be a cartridge purge

'ni,t consisting of a T-size bottle of 'dry nitrogen, regulator,, cartridge

holder, and associated piping to permit purging ~f Silver Zeo'iite or;charcoal cartridges with dry nitrogen.

c.

Located in the basement assembly area is an Eben,ne NS-,2 single channel

analyzer, calibrated to 365 Ke~l, connected'o a 2" x 2" NaI crystal: in a 2' lead shield.'designed 'for counting in TEDA-charcoal or Silver Zeolite cartridges.

RESPONSE

TO ITB'1 'III'D.3. 0 CONTROL ROOD'I MB-ITABILITY:

The NRC posi'tion to assure that cont'rol r'o'om ope'rotors: will be adequat'ely protected against~acedental release 'of toxic'a'~es and;radii,ation to operat and/or shut down 'the plant under design,basi's

'accident conlftions is resently under review.

Our present schedule ts to cor,,piete the review and eva/uation and make the required submittaI of information by February 2,1981.

Thus, we are requesting relief of the submittal deadline of January ll, 1981 to February 2,

1981 which will allow us sufsicient time to complete our review efforts.