ML17331A483
| ML17331A483 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 10/07/1980 |
| From: | Hunter R INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| References | |
| AEP:NRC:00476, AEP:NRC:476, NUDOCS 8010150412 | |
| Download: ML17331A483 (4) | |
Text
+st+M TS ACCESS IOi4 NUR FAC IL:50 315 50 316 50 327 AU1H INANE HUNTERIR,Se RFCIP ~ f4AfwE OEN TUI4, f4, R.
REGULATORY Il4FORYiATION OISTRIBUTIOil SYSTE'I (R IOS)
- 8010150<112 OOC ~ DATE: 80/10/07 NOT ARIZEO:
YES Oonald CD Cook iNuclear Power Plantr Unit ii Indiana Oonald CD Cook Nuclear Power Plantr Unit 2P Indiana 8
Seauoyah
'nuclear Plants Unit 1P Tennessee Valley Auth AU f HOR AFFILIATION Indi ana 8
'4i chi gan Electric Co.
RECIPIENT AFF IL I AT ION Office of Nuclear Reactor Regulationi Oirecto~
OOCKET 1;
50003 0
032r
SUBJECT:
Responds to NRC 800922 1 tr re hydrogen control measur es 8
setting uo schedules for NRC review of interim 8 longer term measures'escribes research orogram re ice condenser containmentspstructural analysis 8 conceotual design study.
DiSTRIBUTION CODE:
ADO IS COPIES RECEIVED:LTR ~ENCL IsrE SIZE:~
TITLE: General Distriputicn fpr after Issuance of Operating License NOTES:I8E:3 comics al 1 material.
l4 Cunningham all amends to FSAR 8
changes to Tech Specs.
0500031"'500031>>
0500032 RECIP IEI4T I O COOE/14A ME ACTION:
VARGA,S, 0O COPIES LTTR ENCL 13 1
RECIPIENT IO CODE/ANA'4E SCHT4ENCERRA ~
04 COPIES LTTR El4 L
13 1
INTERNAL: O/OIRR HUH FAC08 NRC POR 02 OR ASSESS BR 10 IEE 0
EG FI 06 11 01 EXTERNAL: ACRS i4S I C 09 16 05 1
LPOR 03 00T 17 1980 TOTAL NU:ABER OF COP I ES REQUIRED:
L T TH ~
E'4CL I
INDIANA L MICHIGAN ELECTRIC COMPANY P. O.
BOX 18 BOWLING GR E EN STATION NEW YORK, N. Y. 10004 October 7, 1980 AEP:NRC:00476 Donald C.
Cook Nuclear Plant Unit Nos.
1 and 2
Docket Nos.
50-315 and 50-316 License Nos.
DPR-58 and OPR-74 HYDROGEN CONTROL MEASURES Mr. Harold R. Oenton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.
C.
20555
Dear Mr. Denton:
This is in reply to Mr. O.
G. Eisenhut's letter of September 22, 1980 to our Mr. John E. Dolan, regarding hydrogen control measures at the D. C.
Cook Nuclear Plant and setting out the schedules for NRC review of interim and longer term measures of the recently licensed Sequoyah Unit No. l.
As your letter indicates, the hydrogen control measures already installed at the Cook Plant fully comply with current Commission regula-tions regarding hydrogen control (10 CFR 50.44).
These measures were provided at the outset of plant operation.
We have, of course, followed closely the evaluations of the Three Mile Island Unit 2 (TMI-2) accident and the lessons learned there-from.
We have implemented the short term lessons
- learned, and we are implementing the longer -term lessons learned on a best effort basis to conform to the NRC schedules.
These actions materially reduce the risk of a TMI-2 type accident at the Cook Plant, if indeed such a risk existed at all.
Thus, while it appears that a metal-water reaction occurred at TMI-2 in excess of the amounts specified in 10 CFR 50.46 of the Commission's regulations, the likelihood of such an event at the Cook Plant is vanishingly small.
8010 Z0 04/2-
Mr. Harold R.
Denton AEP:NRC:00476 Nevertheless, as a result of our reviews of the TMI-2 event, we joined the Tennessee Valley Authority and Duke Power Company in a research and development program to investigate additional hydrogen control measures that might be considered for ice condenser containments.
In this program we have initiated studies inquiring into: (a) the feasibility of using HALON 1301 to prevent hydrogen combustion, (b) the use of an igniter system, such as that installed in the Sequoyah
- Plant, in a reactor accident environment, and (c) the state-of-the-art of hydrogen control systems.
These studies are expected to extend into
- 1981, and they may be enlarged as appropriate.
Beyond these joint studies, we have initiated a structural analysis of the ultimate strength of the Cook Plant containments.
These contain-ment structures, unlike those at Sequoyah, are reinforced concrete structures.
This analysis should'e completed by December 31, 1980.
This analysis will provide useful information with which to evaluate the need for additional hydrogen control measures at the Cook Units.
As a further interim measure, we have started a conceptual design study of a distributed ignition system in the-Cook Plant containments.
This will facilitate installation of such a system if it is determined that additional measures are required and that it would be the optimal alternative hydrogen control measure.',
This conceptual design study should be completed by March, 1981.
We shall be pleased to submit to the NRC quarterly reports on the above described research
- program, the containment structural analysis, and the conceptual design study.
This program is consistent, we believe, with the recommendation of the ACRS that "studies to demonstrate the effectiveness, reliability, and absence of significant adverse effects of candidate measures should be pursued actively".
In light of the foregoing, we believe that there is no need now to incorporate conditions in the Cook Plant licenses similar to those included in the Sequoyah license.
Ver t ly yours, unter Vice President cc:
John E. Dolan G. Charnoff R.
C. Callen R.
W. Jurgensen D. V. Shaller - Bridgman Region III Resident Site Inspector
STATE OF NEW YORK )
COUNTY OF NEW YORK)
R.
S. Hunter, being duly sworn, deposes and says that he is the Vice President of Indiana 8 Michigan Electric Company; that he has read the foregoing statements and knows the contents thereof; and that said contents are true to the best of his knowledge and belief.
Subscribed and sworn to before me this ~~ day of October, 1980.