ML17331A331

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for May 1993 for DC Cook Nuclear Plant Unit 1 & Revised Rept for Apr 1993,correcting 1 H Error in Cumulative Column for Line Item 11 Re Hours in Reporting Period
ML17331A331
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 06/04/1993
From: Blind A
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17331A332 List:
References
NUDOCS 9306170052
Download: ML17331A331 (2)


Text

ACCEI ERAT DOCUMENT DIST UTION SYSTEM REGULAT INFORMATION DISTRIBUTIO STEM (RIDS)

~

T'CCESSION NBR:9306170052 DOC.DATE: 93/06/04 NOTARIZED:

NO DOCKET FACIL;.'50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana M

05000315 AUTH.NAME AUTHOR AFFILIATION BLINDgA.A.

Indiana Michigan Power Co. (formerly Indiana

& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Forwards monthly operating rept for May Nuclear Plant Unit 1

& revised rept for 1 h error in cumulative column for Line reporting period.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (pei Tech Specs)

NOTES 1993 for DC Cook Apr 1993,correcting Item ll re hours in ENcz f sxzE: +

D RECIPIENT ID CODE/NAME PD3-1 LA DEANiW INTERNAL: AEOD/DOA

$3)QIL/RPEB REG 01 EXTERNAL: EG&G BRYCEgJ.H NSIC COPIES LTTR ENCL 3

3 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD3-1 PD AEOD/DSP/TPAB NRR/DRPW/OEAB RGN3 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 D

D D

D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTETH CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

D TOTAL NUMBER OF COPIES REQUIRED:

LTTR 14 ENCL 14

Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 June 4,

1993 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

Pursuant to the requirements of Donald C.

Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of May 1993 is submitted.

Also, attached please find Revision 1 of the April, 1993 Operating Data Report which has been changed to correct a one-hour error in the "Cumulative" column for Line Item 11, "Hours in Reporting Period,"

and an error in the computation of the "Gross Thermal Energy Generated,"

Line Item 16, all three columns.

We apologize for any inconvenience these errors may cause.

Respectfully, A.A. Blind Plant Manager Attachment cr NRC Region III D.R. Hahn R.C. Callen S.

Hamming J.G. Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick R.L.

Simms W.G. Smith, Jr.

S.J.

Brewer D.W. Paul S.H. Steinhart J.L. Leichner J.A.

Isom D.G.'Turner

>60012

"=qg<>g)70052 +>~~~+

PDR FDR ADOCX OSOOOS1S t,