Forwards Response to NRC 930319 Request for Addl Info Re Unresolved Issues Noted in Insp Repts 50-315/93-08 & 50-316/93-08 on 930223-0305.Corrective Actions:Testing of Centrifugal Charging Pumps Will Be Conducted at Fixed Flow
ML17331A318
Person / Time
Site: Cook  
Issue date: 05/21/1993
From: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Davis
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AEP:NRC:1184B, NUDOCS 9306010301
Download: ML17331A318 (6)


Text

ACCEI ERATED DOCUMENT 0 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9306010301 DOC.DATE: 93/05/21 NOTARIZED: YES DOCKET ¹ FACIL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana M

05000315 J

50-316 Donald C.

Cook Nuclear Power Plant, Unit 2, Indiana M

05000316 AUTH.NAME AUTHOR AFFILIATION FITZPATRICK,E.

Indiana Michigan Power Co. (formerly Indiana

& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION DAVIS Document Control Branch (Document Control Desk)

SUBJECT:

Forwards response to NRC 930319 request for addi info re unresolved issues noted in Insp Repts 50-315/93-08 50-316/93-08 on 930223-0305.Corrective actions:testing of centrifugal charging pumps will be conducted at fixed flow.

DISTRIBUTION CODE:

IE01D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:

RECIPIENT ID CODE/NAME PD3-1 PD INTERNAL: AEOD/DEIB AEOD/TTC NRR/DORS/OEAB NRR/DRIL/RPEB NRR/PMAS/ILPB1 NUDOCS-ABSTRACT OGC/HDS2-RES MORISSEAU,D EXTERNAL: EG&G/BRYCEgJ.H.

NSIC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME DEANiW AEOD/DSP/TPAB DEDRO NRR/DRCH/HHFB NRR/DRSS/PEPB NRR/PMAS/ILPB2 OE DIR

+R 02 GN3 FILE 01 NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 21 ENCL 21

Indiana Michigan Power Company P.D. Box 16631 Co!umbus, OH 43216 Z

lNDlANA MfCHlGAN laOWKR Donald C. Cook Nuclear Plant Units 1

& 2 Docket Nos. 50-315, 50-316 License Nos.

DPR-58, DPR-74 NRC INSPECTION REPORT NO. 50-315/93008 (DRS)g NO. 50-316/93008 (DRS)

REPLY TO REQUEST FOR RESPONSE U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Attn:

Document Control Desk May 21, 1993 AEP: NRC: 1184B

Dear Mr. Davis:

This letter is in response to your letter dated March 19,

1993, which forwarded a request for response.

The request resulted from an inspection conducted by Messrs.

A. Dunlop, G. Replogle, W. Pegg, and D. Roth on February 23 through March 5, 1993.

The request for response is associated with two unresolved issues that concern:

1)

Use of pump curves for IST without relief from ASME Section XI Code requirements, and 2)

Exclusion of the closed safety function for several safety in)ection and component cooling water check valves from the IST program.'ur reply to the request for response is provided in the attachment to this letter.

This letter is submitted pursuant to 10 CFR 50.54(f) and, as such, an oath statement is attached.

Sincerely, Vice President dr Attachment cc:

A. A. Blind Bridgman J.

R. Padgett G. Charnoff T. E. Murley NRC Resident Inspector - Bridgman NFEM Section Chief 27 t 'f3 9306010301 930521 PDR ADOCK 05000315 0

PDR

Mr. A. B. Davis AEP: NRC: 1184B bc:

S. J.

Brewer D. H. Malin/K. J. Toth M. L. Horvath Brldgman J. B.,Shinnock W. G. Smith,, Jr.

B. A. Wetzel, NRC Washington, DC AEP:NRC!1184B DC-N-6015.1

ST TE OF 0 IO COUNTY OF FRANKLIN E. E. Fitzpatrick, being duly sworn, deposes and says that he is the Vice President of licensee Indiana Michigan Power

Company, that he has read the forgoing response to NRC INSPECTION REPORT NO. 50-315/93008(DRS);

50-316/93008(DRS) and knows the contents thereof; and that said contents are true to the best of his knowledge and belief.

Subscribed and sworn to me before this day of 19 g~/

NOTARY PUBLIC Pl'T% P taOTi'7 FUiUC, SliGi OF O.ll0 r

ATTACHMENT TO AEP:NRC: 1184B REPLY TO REQUEST FOR RESPONSE

Attachment to AEP:NRC:1184B Page 1

Unresolved te 50-315 316-3008-0 DRS The Cook Nuclear Plant IST procedures for the centrifugal charging pumps used reference curves to define acceptance criteria for flow and differential pressure.

The use of pump reference curves may not be equivalent to the ASME Section XI Code requirement.

Resolve whether to perform pump testing in accordance with Code requirement or submit a

code relief request to allow use of reference curves.

es onse Testing of the centrifugal charging pumps at a fixed flow point will be performed in accordance with Section XI requirements.

Test procedures have been revised to eliminate the pump curves.

Testing at a fixed flow point has commenced as of 04/01/93.

2.

Unresolved Item 50-315 316-93008-Ola DRS Resolve exclusion of the closed safety function for several safety in)ection (SI) and Component Cooling Water (CCW) check valves from IST program.

~Res esse The closed safety function of check valves SI-110N, SI-llOSR CCW-224 1 thru 4, and CCW-225 1 thru 4 will be included with revision 4 of the IST program.

Revision 4 of the IST program is due for submittal at the end of May 1993.