Monthly Operating Rept for Mar 1993 for DC Cook Nuclear Plant,Unit 2.W/930405 Ltr
ML17331A277
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 03/31/1993
From: Blind A, Doreen Turner
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9304190177
Download: ML17331A277 (7)


Text

ACCELERATFD DOCUMENT DISTR BUTION SYSTEM REGULATO INFORMATION DISTRIBUTION TEM (RIDS)

ACCESSION NBR:9304190177 DOC.DATE: 93/03/31 NOTARIZED: NO DOCKET FACIL:50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH. NAME AUTHOR AFFILIATION TURNER,D.G. Indiana Michigan Power Co. (formerly Indiana a Michigan Ele BLINDgA.A. Indiana Michigan Power Co. (formerly Indiana s Michigan Ele RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operatin re t for Mar 1993 for DC Cook Nuclear Plant, unit 2.W 30405 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Spec )

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-1 LA 3 3 PD3-1 PD 1 1 DEANgW 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR DORS OEAB 1 1 NRR/DRIL/RPEB 1 1 G FIL 01 1 1 RGN3 1 1 EXTERNAL EGGG BRYCE g J ~ H 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CON1'ACI'I IE DOCUMEN'I'ON'I'ROL D!:SK.

ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMEN1'S YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14

Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 April 5, 1993 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of March 1993 is submitted.

Respectfully, A.A. Blind Plant Manager Attachment c: NRC Region D.R. Hahn III R.C. Callen S. Hamming J.G. Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick R.L. Simms M.G. Smith, Jr.

S.J. Brewer D.W. Paul S.H. Steinhart J. L. Leichner J.A. Isom D.G. Turner E.A. Smarrella J.C. Krieger B.A. Svensson D.F. Krause M.E. Russo 9304i90i77 PDR~~

R 930331

'ADOCK OSOOO316 PDR

/+v'

N.R.C. OPERATING DATA REPORT DOCKET NO. '0-316 DATE 02-Apr-93 COMPLETED BY DG Turner TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit 2
2. Reporting Period March 93 notes
3. Licensed Thermal Power (MWt) 3411
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity (GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1090
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted.
10. Reasons For Restrictions. If Any:

If Any (Net MWe)

This Mo. Yr. to Date Cumm.

11. Hours in Reporting Period 744.0 2160.0 133657.0
12. No. of Hrs. Reactor Was Critical 744.0 2160.0 88517.5
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator on Line 744.0 2160.0 '5476'. 4
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Therm. Energy Gen. (MWH) 2532127 7343176 264930948
17. Gross Elect. Energy Gen. (MWH) 836050 2428010 86182040
18. Net Elect. Energy Gen. (MWH) 810475 2353913 83026085
19. Unit Service Factor 100.0 100.0 65.1
20. Unit Availability Factor 100.0 100.0 65.1
21. Unit Capacity Factor (MDC Net) 99.9 100.0 59.5
22. Unit Capacity Factor (DER Net) 99.9 100.0 58.0
23. Unit Forced Outage Rate 0.0 0.0 16.0
24. Shutdowns Scheduled over Next Six Months (Type, Date,and Duration):

None

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test'. Status (Prior to Commercial Operation):

Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO. 50-316 UNIT TWO DATE 02-Apr-93 COMPLETED BY DG Turner TELEPHONE 616-465-5901 MONTH March 93 AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 1 1094 17 1089 2 1094 18 1094 3 1090 19 1083 4 1092 20 1090 5 1092 21 1091 6 1091 22 1093 7 1094 23 1086 8 1094 24 1088 9 1086 25 1088 10 1089 26 1088 ll 12 1090 1089 27 28'9 1086 1084 13 1088 1083 14 1091 30 1085 15 1091 31 1086 16 1092

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME: D C. COOK UNIT 2 DATE: April 6, 1993 ~

REPORT MONTH: MARCH 1993 COMPLETED BY: R. D. Reynnells TELEPHONE: (616) 465-5901 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM - COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE HOURS REASON REACTOR REPORT NO. CODE% CODE TO PREVENT RECURRENCE None There were no unit shutdown or significant power reductions from 100% RTP this month.

1 2 3 4 5 F Forced Reason: Method: Exhibit G Instructions Exhibit I: Same S Scheduled A: Equipment Failure (Explain) 1: Manual for preparation of data Source B: Maintenance or Test 2: Manual Scram entry sheets for Licensee C: Refueling 3: Automatic Scram Event Report (LER) File D: Regulatory Restriction 4: Other (Explain) (NUREG 1061)

E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)

DOCKET O.: 50-316 UNIT NAME: D.C. Cook Unit 2 COMPLETED BY: R. D. Reynnells TELEPHONE: (616) 465-5901 DATE April 6, 1993 PAGE Page 1 of 1 MONTHLY OPERATING ACTIVITIES MARCH 1993 HIGHLIGHTS The unit entered the reporting period in Mode 1 at 100% RTP.

The unit exited this reporting period in Mode 1 at 100% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross Electrical generation for the month of March was 836050 MHH.

DETAILS 03-29-93 1104 Unusual Event declared due to a failure in the rod control system.

03-29-93 1253 Exited Unusual Event, faulty fuse replaced in the rod control system.

r

DOCKET NO: 50-316 UNIT NAME: D.C. Cook Unit 2 COMPLETED BY: M. E. Russo TELEPHONE: (616) 465-5901 DATE: April 5, 1992 PAGE 1 of 1 MAJOR SAFETY-RELATED MAINTENANCE March 1993 There were no major safety-related maintenance items during the month of March.