ML17331A177

From kanterella
Jump to navigation Jump to search
Forwards LER 80-022/03L-0 & Updated LER 79-041/03L-1
Date released: 05/31/2018 Download: ML17331A177


Updated LER 79-041/03L-1:on 791101,hydrogen Recombiner 1 Failed to Increase Temp to 1,200 F within 5-h.Caused by Incorrect Electrical Connection of One Heater Element.Wiring Corrected & Controller Gain & Bias Adjusted
ML17331A180
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 06/02/1980
From: Wizner D
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17331A180 (2)
LER 80-022/03L-0:on 800503,radiation Monitor R-11 Alarmed During Normal Operation.Sample Pump for R-11 & R-12 Would Not Remain Running.Caused by Wear of Pump.Pump Replaced & Air Sampler Tested.Entire Sys Will Be Replaced
ML17331A179
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 06/02/1980
From: Wizner D
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17331A179 (2)
Forwards LER 80-022/03L-0 & Updated LER 79-041/03L-1
ML17331A176
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 06/02/1980
From: Shaller D
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML17331A176 (2)