Notification of 800527 Meeting W/Util in Bethesda,Md to Review Design of Proposed Technical Support Ctr & Emergency Operations Facility
ML17331A169
Person / Time
Site: Cook  
Issue date: 05/21/1980
From: Miner S
Office of Nuclear Reactor Regulation
To: Varga S
Office of Nuclear Reactor Regulation
References
NUDOCS 8006030091
Download: ML17331A169 (6)


Text

~P,g Rf'gI (4

0 Cy Cn C

O 0

iiO+ ~

Op I

+~

~0

+y*y0 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 MAY

> 1"'19%

Docket Nos.

50-315 6

MEMORANDUM FOR:

Steven A. Varga, Chief Operating Reactors Branch ¹1, DL FROM:

SUB JECT:

Date:

Time:

Place:

Purpose:

Sydney Miner, Project Manager Operating Reactors Branch ¹1, DL FORTHCOMING MEETING WITH AMERICAN ELECTRIC POWER ON D. C.

COOK UNIT NOS.

1 AND 2

Tuesday, May 27, 1980 10:00 am Room P-110 Phillips Building
Bethesda, Maryland Review the design of the proposed D.

C.

Cook Technical Support Center and Emergency Operations Facility

Participants:

NRC R. Mattson T. Novak S.

Hanauer L. Betracchi B. Grimes S.

Ramos J. Telford W. Minners S. Miner S.

Varga AEP B. Hunter S. Milioti A. Grimes G. Guricn cc:

See next page Sydney Miner, Project Manager Operating Reactors Branch

¹1

,Division of Licensing

jgjlg@l [5~ND'Lf.NN Meeting Notice for D.

C.

Cook l~nd-2 MAY 4 1 1980 cket Files&> ~~

NRC P

Local PDR NSIC TERA ORBl Reading NRR Reading H. Denton E.

Case

b. Eisenhut R. Purple T. Novak R. Tedesco G. Lainas G. Zech S. Varga T. Ippolito R. Clark R. Reid B. J.

Youngblood A. Schwencer J. Miller D. Crutchfield J.

Wetmore Project Manager OELD OSD (3)

S.

Showe, I8E C. Parrish R. Fraley, ACRS (16)

Receptionist, Bethesda Program Support Branch Principal Staff Participants

306s 23 75~

IIHImToWI.@I(I:T rIL( t,'O'I Docket 'Ho. 50-316 DISTRIBUTION D-ocket F-ile 50-316 ORBl R-eadin D. Wigginton S.

Varga TAC 12619 File Fee Form F-ile MEMORANDUM FOR:

Reba Diggs License Fee Management Branch

/

Steven A. Varga, Chief Operating Reactors Branch 81, DL N

LICENSE FEE FOR D. C.

COOK SUBMITTAL

SUBJECT:

On December 18, 1979, D. C.

Coog submitted additional information on Panel and Electrical Switchgear gualification Testing.

The mail control number is 7912200509 and the TAC number is 12619.

In our Amendment No.

6 to the Unit 2 license, we approved their systems for an interim period and required the licensee to submit the additional information, The licensee had paid

$4,000 for that review.

We had originally filed a fee determination form for the latest submittal of information and classified the fee as a Class III.

D. C.

Co'ok on March 28, 1980 objected to the additional fee on the basis that this is a continuation of the review from Amendment No. 6.

We did not perform the entire review necessary to close out the issue in Amendment No. 6.

We reviewed the information that was available and acted upon it at the time.

We requested the necessary additional information on the, same issue to close it out and D. C. Cook has supplied,-;

that, information.

We will perform a review, perhaps ask questions on the

~'aterial submitted, mr its an

SER, and delete the residual license condltionR on this subject.

We tirust this is sufficient information to allow the Liceese Fee Management Branch to clear up any questiops on appropriatness of fees for this review actiNty. If you need any further information, please let us know.

The question for you to deaide is, whether the original fee, which was paid, appropriately covers the requested action, part of which was acted upon when" we issued Amendment No.

6 and part of which will be acted upon under TAC Ho. 12619.

k

'Original sgggeg b~~

~

4 q

oh Steven A. Yarga,'hief orrice~

SIUIIIIAM4~

OATC~

DL:ORB1 DIcigginton:j

Ilfi.. ERR::::::.

Bl Va ga

/80 pera 1

g eac ors r nc IC PORM 518 (976) NRCM 0240 Q U 4 OOV4IINM4IIT~IIIIITIIIOOtrlcms I ~ T ~ see'ee

II $

A' l

>>,gc,g"gy

+='~iQ DLR KVg

- <<.),>iy

e S,~ iiEC(,

0 a) Q S%>

a.

rrrIP Docket I)o. 50-316 uNITED STATES NUCLEAR REGULATORY COWiVilSSION

\\VASHINGTON, D. C. 20655 Hay 6, 1980 "E"OP%'IDUN FOR:

Reba Diggs Licens'e Fee management Branch FROII:

SUBJECT:

Steven A. Varga, Chief Operating Reactors Branch;";-1, DL LICE)'SE FEE FOR D.

C.

COOK SUBI1ITTAL On December 18, 1979, D.

C.

Cook submitted additional information on Panel ard Electrical Switchgear qualification Testing.

The mail control number

's 7912200509 and the TAC number is 12619, In our Amendment Ho.

6 io the Unit 2 license,

>>e approved their sysl,ems for an interim period and required the licensee to submit the additional information.

The licensee had paid

$4,000 for that review.

He had originally filed a fee determination form for the latest submittal of information and classified the fee as a Class I'II.

D. C..Cook on iIarch 28, 1980 objected to the additional fee on the basis that ibis is a

continuation of the review from Amendmeni No, 6.

He did riot perform the entire review necessary to close out the issue in Amiendment No. 6.

Me reviewed the information that was available and acted upon it at the time,

>le requested the necessary additional information on the same issue to close it out and D, C.

Cook has supplied that information.

He will perform a review, perhaps ask questions on the miaterial submitted, write an'SER, and delete the residual license conditions or, this subject.-

Me trust this is sufficient information to allow the License Fee I'1anagement Branch io clear'p any questions on appropt'iatness of fees. for this review activi ty. If you need any further inf'o!"mation, please let us know.

The question for you to decide is whether the original fee, which was paid, appropriately'covers ihe requested action, part of which was acted upon when

<ve issued Amendment iso.

6 qnd part of which wilt be acted upon under TAC Ho.'2619, P.

Steven A. Yarga, Chi it, Ope! sting Reacto!"s anch 81, DL