Responds to 921223 SER on Util Response to Suppl 1 to Generic Ltr 87-02 & Provides Procedures & Criteria Used to Generate Licensing Basis in-structure Response Spectra for USI A-46 & Criteria for Cable Tray & Conduit Evaluations
ML17331A121
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 04/01/1993
From: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Murley
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
REF-GTECI-A-46, REF-GTECI-SC, TASK-A-46, TASK-OR AEP:NRC:1040B, GL-87-02, GL-87-2, NUDOCS 9304050268
Download: ML17331A121 (9)


Text

ACCEI ERAT DOCUMENT DIST UTION SYSTEM REGULAT INFORMATION DISTRIBUTIO STEM (RIDS)

ACCESSION NBR:9304050268 DOC.DATE: 93/04/01 NOTARIZED: NO DOCKET FACIL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana M

05000315

~

50-316 Donald C.

Cook Nuclear Power Plant, Unit 2, Indiana M

05000316 AUTH.NAME AUTHOR AFFILIATION FITZPATRICK,E.

Indiana Michigan Power Co. (formerly Indiana a Michigan Ele RECIP.NAME RECIPIENT AFFILIATION MURLEY Document Control Branch (Document Control Desk)

SUBJECT:

Responds to 921223 GL-87-02 a provides addi info for procedures a criteria to generate licenssing basis in-structure response spectra used for USI A-46 project.

DISTRIBUTION CODE: A025D COPIES RECEIVED:LTR ENCL 3 SIZE:

TITLE: Seismic Qualification of Equipment in OperatingWlants A-46 NOTES:

RECIPIENT ID CODE/NAME OGC/HDS2 PD3-1 PD INTERNAL: NRR/DE NRR/DE/EELB NRR/DRCH/HICB NRR/DSSA/SCSB NRR DSSA/SRXB

.~

EG F 01 EXTERNAL: NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME NRR/PD11-2 DEAN,W NRR/DE/ECGB NRR/DE/MEB NRR/DRPE/PD1-3 NRR/DSSA/SPLB NRR/PD1-3 COPIES LTTR ENCL 1

1 1

1 2

2 4

4 1

1 1

1 1

1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 20 ENCL 20

0 C

I

Indiana Michigan Power Company P.O. Box 16631 Columbus, OH 43216 8

AEP:NRC:1040B Donald C.

Cook Nuclear Plant Units 1 and 2

Docket Nos.

50-315 and 50-316 License Nos.

DPR-58 and DPR-74 GL-87-02 SUPPLEMENT No.l; REQUEST FOR ADDITIONALINFORMATION U.S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D.C.

20555 April 1, 1993

Dear Dr. Murley:

Reference:

(1)

NRC Safety Evaluation Report (SER) on our Response to Supplement No.

1 to Generic Letter 87-02 dated December 23, 1992 (2) Our letter AEP:NRC:1040A dated September 21, 1992 This letter and its attachment respond to the SER referenced above and provide additional information and clarification for the items noted in the SER regarding a) the procedures and criteria which were used to generate the licensing basis in-structure response spectra to be used for USI A-46 project and b) the criterion to be used for cable tray and conduit evaluation.

In 'summary, Indiana Michigan Power Company intends to fully implement the Seismic Qualification Utility Group (SQUG) commitments and implementation guidance in accordance with Part I, Section 1.3 of the Generic Implementation Procedure (GIP), Revision 2 (corrected February 14, 1992).

This revision was accepted by the NRC staff in its SSER No.2 on the GIP, dated May 22, 1992.

This includes complying with the requirements of Section 8 of the GIP for cable tray and conduit evaluation.

Sincerely, E.E. Fitzpa ick Vice President EEF/gmd Attachment 9'304050268~'730401

"'PDR

'ADOCK~05000315, P

'DR

Dr. T.

E. Murley AEP:NRC:1040B cc:

A. A. Blind - Bridgman J.

R. Padgett G. Charnoff NFEM Section Chief A. B. Davis

- Region III NRC Resident Inspector

- Bridgman

ATTACHMENT TO AEP'NRC:1040B ADDITIONALINFORMATION SUBMITTED IN RESPONSE TO NRC SER ON AEP:NRC:1040A,

RESPONSE

TO GENERIC LETTER 87-02, SUPPLEMENT N0.1

Attachment to AEP:NRC:1040B Page 1

The following are Indiana Michigan Power Company's responses to the request for additional information noted in NRC's SER dated December 23,

1992, as applicable to the Donald C.

Cook Nuclear Plant.

The subject NRC SER was issued on Indiana Michigan Power Company's response to three items noted in Supplement No.l to GL 87-02.

(1)

Clarification to the Res onse to Item No 1

Ins ection and Evaluation of Cable Tra Conduit Su orts The NRC SER noted that "the licensee should clearly state whether or not it intends to commit to use the entire SQUG methodology as delineated in GIP-2, Section 8, for inspecting and evaluating cable tray and conduit supports."

(a)

We plan to inspect the cable and conduit raceway systems in the plant on an area-by-area basis.

As required by Section 8 of GIP, this inspection will include checking the raceway system (i.e.,

conduits, cable
trays, and their support systems) against the Inclusion Rules, and Other Seismic Performance
Concerns, as well as selecting representative, worst-case samples of the raceway supports for further Limited Analytical Review.

We intend to inspect all raceways and their supports.

However, there are a few isolated areas in the plant (e.g.,

the Boric Acid Storage Tank

Room, the Control Room Cable Vault)
where, due to congestion, close inspection of some of the raceway supports may not be possible without physically removing some of the obstructing cable trays, pipes, or other components.

In such

cases, the Seismic Review Team will document the field condition, and inspect other similar supports in the area or use design/construction drawings to verify the seismic adequacy of the support involved.

We believe that this approach is consistent with the SQUG philosophy in developing a cost-effective means of verifying the seismic adequacy of raceway systems and their supports.

(b)

We have committed to use the entire SQUG methodology as delineated in GIP-2, Section 8,

for inspecting and evaluating cable tray and conduit supports.

We have no plan to deviate from the SQUG methodology.

The tests on certain rod hanger details were performed not as a means to establish a

new screening criteria different from those established in GIP-2, rather they were performed to ensure that we stay within the guidelines of GIP-2 (i. e.,

that certain connection details do not fail prematurely).

Attachment to AEP:NRC:1040B Page 2

(2)

Clarification to Res onse to Item No 2

Schedule for Im lementation The schedule for implementing the seismic verification of electrical and mechanical equipment was acceptable to the NRC; therefore, additional clarification is not required.

(3)

Clarification to Res onse to Item No 3

Additional Information on In-Structure Res onse S ectra Upon review of Attachment 1 to AEP:NRC:1040A, the NRC staff concluded that the licensee's response with respect to the in-structure response spectra is acceptable.

However, based on the information provided, the NRC staff disagrees with the licensee's conclusion that the licensing basis in-structure response spectra are considered to be "conservative, design" in-structure response spectra.

The NRC staff concluded that the spectra, should be classified as "median-centered" response spectra for the purpose of USI A-46 issue resolution.

The NRC staff believes that if additional information is provided regarding (a) the procedure followed in broadening the peak responses, (b) the structural damping values used in the structural dynamic

analyses, and (c) whether only one component of the horizontal earthquake motion or two orthogonal components were used as inputs to the structural
analysis, and if this additional information is found to be satisfactory by the staff, then the in-structure response spectra could be classified as "conservative, design".

Additional information regarding the in-structure response spectra (ISRS) generation is given below.

Information on items (a) and (c) was included in the original submittal and is now reformatted for easier readability.

Information on item (b) had been covered in a general way in the original submittal and is now specifically detailed.

Containment Buildin (a)

To allow for soil and structure property variations, the resonance response on the response spectra curve was used for frequencies in the interval of

+10% of the resonant frequency.

That is, the peak response acceleration was assumed to be occurring anywhere within

+108 of the apparent resonant frequency or, equivalently, the peak response acceleration of the ISRS was broadened

+10% on the frequency scale.

(b)

The structural damping values used in the structural dynamic analyses of the Containment Building were 2S for Operating Basis Earthquake (OBE) and 5$ for Design Basis Earthquake (DBE).

These damping.values were used as

Attachment. to AEP:NRC:1040B Page 3

modal damping for all modes.

The higher damping effect from the soil was conservatively

ignored, though soil-structure interaction was considered in the model.

(c)

The Containment Building was modeled as two vertical sticks with lumped

masses, one representing the containment shell (the concrete outer shell),

and the

other, the internal structure.

As the model was axisymmetrical about the vertical

axis, only one component of the horizontal earthquake motion was used as input in the structural dynamic analysis.
However, four different earthquake
records, one at a time, were used as input motions.

The final ISRS were obtained by enveloping the responses of the structure to the four earthquakes.

The resulting ISRS can be used for horizontal excitation in any direction.

Auxiliar Buildin (a)

The ISRS for the Auxiliary Building were obtained by the following steps:

(1) perform time-history dynamic analyses using four real earthquake records (one at a

time) as input motions in one horizontal direction; (2) derive the ISRS from the corresponding time history responses at the location where ISRS is desired, for each of the four earthquake input motions; (3) average the four ISRS obtained in step 2;

(4) repeat steps 1

through

. 3 for input motion in the other horizontal direction; (5) envelop the ISRS obtained from steps 3

and 4; (6) repeat steps 1 through 5 using a dynamic analysis model with the stiffness of the soil springs reduced to one third of their calculated values; (7) envelop the ISRS obtained from step 5 and step 6.

The resulting ISRS can be used for horizontal excitation in either direction.

As described

above, the broadening of the ISRS peaks was a result of the combination of ISRS from multiple time history analyses, from two orthogonal horizontal input
motions, and from two dynamic models with different soil spring constants.

(b)

Our analysis indicates that all significant response is associated with the first and second modes which consist almost entirely of "swaying" action within the soil.

Over 90% of the modal energy is in the soil springs.

This indicates that the modal damping should be almost as much as that in the soil alone, and the soil damping in swaying is very high.

A conservative damping value of 20$ of critical was used for the first and the second modes as recommended by

Attachment to AEP:NRC:1040B Page 4

Dr. John M. Biggs, professor of Civil Engineering at the Massachusetts Institute of Technology.

(c)

As explained in (a)

above, the effects of horizontal earthquake motion in both the N-S and E-W directions were reflected in the final ISRS.
However, the dynamic analysis was performed with only one horizontal input motion at a time.

Conservatism in the ISRS The ISRS to be used for USI A-46 for Cook Nuclear Plant are considered to be "conservative, design",

based on the following considerations:

(1) the ISRS were developed based on the licensing-basis ground response

spectrum, (2) multiple real earthquake records were used in the analyses for developing the ISRS, (3) the effect of soil-structure interaction was considered, (4) a time-history analysis approach was used in the
analyses, and (5) significant amplifications were reflected in the resulting ISRS.

(4)

Chan es to License Basis Originally, the seismic qualification of electrical and mechanical equipment at Cook Nuclear Plant was performed in accordance with IEEE-344-1971.

Since

1980, the seismic qualification of electrical and mechanical equipment for replacement is being performed under the requirements of IEEE-344-1975 unless otherwise noted.

We will evaluate the necessity to change the licensing basis methodology (UFSAR) to reflect a commitment to the USI-A-46 methodology after the receipt of the Staff's plant specific SER on the SQUG project.