Forwards Insp Rept 50-315/93-08 & 50-316/93-08 on 930222-0305.Violations Noted But Not Cited.Two Unresolved Issues Identified
ML17331A115
Person / Time
Site: Cook  
Issue date: 03/19/1993
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
Shared Package
ML17331A116 List:
References
NUDOCS 9303290133
Download: ML17331A115 (4)


See also: IR 05000315/1993008

Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9303290133

DOC.DATE: 93/03/19

NOTARIZED: NO

DOCKET ¹

I'IL:50-315 Donald C.

Cook Nuclear

Power Plant, Unit 1, Indiana

M

05000315

50-316

Donald C.

Cook Nuclear

Power Plant, Unit 2, Indiana

M

05000316

AUTH.NAME

AUTHOR AFFILIATION

WRIGHT,G.C.

Region

3 (Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

FITZPATRICK,E.

Indiana Michigan Power

Co. (formerly Indiana

6 Michigan Ele

. SUBJECT:

Forwards insp rept 50-315/93-08

6 50-316/93-08

on

930222-0305.Violations

noted but not cited.Two unresolved

issues identified.

DISTRIBUTION CODE:

IE01D

COPIES

RECEIVED:LTR

ENCL

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation

esponse

NOTES:

INTERNAL:

RECIPIENT

ID CODE/NAME

PD3-1

PD

AEOD/DEIB

AEOD/TTC

NRR/DORS/OEAB

NRR/DRIL/RPEB

NRR/PMAS/ILPBl

NUDOCS-ABSTRACT

OGC/HDS2

RES MORISSEAU,D

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

DEANFW

AEOD/DSP/TPAB

DEDRO

NRR/DRCH/HHFBPT

NRR/DRSS/PEPB

NRR/PMAS/ILPB2

OE

D

02

RGN3

FILE

01

COPIES

LTTR ENCL

1

1

1"

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

EXTERNAL

EGSrG/BRYCE F J

H ~

NSIC

1

1

1

1

NRC PDR

1

1

NOTE TO ALL RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE %'ASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOh1

P 1-37 (EXT. 504-2065) TO ELlh11NATE YOUR NAME FROM DISTRIBUTION

LISTS FOR DOCUh1ENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

21

ENCL

21

6p,R R6O(

~

PO

Cy

A.

I

0O

I

cA

Op

V/+~

~O

+R.**4

UNITED STATES

NUCLEAR

REGULATOR Y COMMISSION

REG ION III

799 ROOSEVELT ROAO

GLEN ELLYN. ILLINOIS 60137

tIIAR 18

'993

Docket No. 50-315

Docket No. 50-316

Indiana Michigan Power

Company

ATTN:

Hr.

E.

E. Fitzpatrick

Vice President

Nuclear Operations Division

1 Riverside Plaza

Columbus,,

OH

43216

Dear Hr. Fitzpatrick:

This refers to the inspection

conducted

by Messrs.

A. Dunlop,

G. Replogle,

W. Pegg,

and

D. Roth of this office on February

23 through March 5,

1993.

The

inspection

included

a review of activities for your D.

C.

Cook Nuclear

Power

Plant, Units

1

and 2.

At the conclusion of the inspection,

the findings were

discussed

with those

members of your staff identified in the enclosed

report.

The areas

examined during the inspection

are identified in the report.

These

areas

consisted

primarily of a review of the

D.

C.

Cook program for inservice

testing

( IST) of pumps

and valves

and of the effectiveness

of the program

regarding the performance of check valves.

Within these

areas,

the inspection

consisted

of a selective

examination of procedures

and representative

records,

observations,

and interviews with personnel.

During this inspection,

certain of your activities appeared

to be in violation

of NRC requirements.

However,

as described

in the enclosed

inspection report,

you identified this violation.

Therefore,

the violation will not be subject

to enforcement

action because

your efforts in identifying and correcting the

violation meet the criteria specified

in Section VII.B of the

"General

Statement of Policy and Procedures

for NRC Enforcement Actions," (Enforcement

Policy,

10 CFR Part 2, Appendix C).

In addition,

two unresolved

issues

are identified in the report.

These

issues

concern your use of the

pump curves for IST without relief from ASME Section

XI Code requirement

and your exclusion of the closed safety function for

several

safety injection and component cooling water check valves from the

IST

program.

You are requested

to respond to these

issues within 60 days of your

receipt of this report.

Your response

should include your evaluation of these

issues

and, if applicable,

your intended corrective actions.

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy of

this letter, the enclosure,

and your responses

to this letter will be placed

in the

NRC Public Document

Room.

9303290i33 9303i9

PDR

ADOCK 050003i5

8

PDR

q

I

Indiana Michigan Power

Company

MAR IB 1993

The responses

directed

by this letter are not subject to the clearance

procedures

of the Office of Management

and Budget

as required

by the Paperwork

Reduction Act of 1980,

PL 96-511.

We will gladly discuss

any questions

you have concerning this inspection.

Sincerely,

Enclosure:

Inspection

Reports

No. 50-315/93008(DRS);

No. 50-316/93008(DRS)

cc w/enclosure:

A. A. Blind, Plant Manager

OC/LFDCB

Resident

Inspector,

RIII

James

R. Padgett,

Michigan

Public Service

Commission

EIS Coordinator,

USEPA,

Region

V Office

Michigan Department of

Public Health

D.

C.

Cook

LPM,

NRR

J. Norberg,

NRR/EHEB

T. Kobetz,

TSS,

DRP

G.

C. Wright, Chief

Engineering

Branch