~ acorn,za.m oocvMzm orsr vnax svsTFM REGULAT~ INFORMATION-DISTRIBUTIO STEM (RIDS)

FACZL':50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana M

05000315 AUTH.NAME AUTHOR AFFILIATION TURNER,D.G.

Indiana Michigan Power Co. (formerly Indiana

& Michigan Ele'OSTELLO,G.J.

Indiana Michigan'ower Co. (formerly Indiana

& Michigan Ele BLIND,A.A.

Indiana Michigan Power Co. (formerly Indiana

& Michigan Ele '

RECIP.NAME RECIPIENT AFFILIATION I

SUBJECT:

Monthly operati re t for Feb 1993 for DC Cook Nuclear Plant Unit 1.W 930305 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR i ENCLl SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

'S RECIPIENT ID CODE/NAME PD3-1 LA DEANPW COPIES LTTR ENCL 3

3 1

1 RECIPIENT ID CODE/NAME PD3-1 PD COPIES LTTR ENCL 1

1 INTERNAL: AEOD/DOA NRR DORS/OEAB EG~FILE 01 1

1 1

1 1

1 AEOD/DSP/TPAB NRR/DRIL/RPEB RGN3 1

1

]

1 1

1 EXTERNAL EG&G BRYCE IJ

~ H NSIC 1

1 1

1 NRC PDR 1

1

  • , A NOTE TO ALL"RIDS" RECIPIENTS PLEASE HELP US TO REDUCE WASTE! COHTACI'IIEDOCUMENT CON'I'ROL D!dV, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DIS'I'RIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 14 ENCL 14

~ i i"~~~

g Pf fi J

lt

~

)

Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 March 5, 1993 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

Pursuant to the requirements of Donald C.

Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of February 1993 is submitted.

Respectfully, A.A. Blind Plant Manager Attachment c:

NRC Region III D.R.

Hahn R.C. Callen S.

Hamming J.G. Keppler INPO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick R.L.

Simms W.G. Smith, Jr.

S.J.

Brewer D.W. Paul S.H. Steinhart J.L. Leichner J.A.

Isom D.G. Turner E.A. Smarrella J.C. Krieger B.A. Svensson D.F. Krause E.C.

Schimmel 9303i20205 930228 PORE jADQCK 05000315 R"'

PDR

i

, lP'pp N. ~ QQ

N.R.C.

OPERATING.DATA REPORT DOCKET NO.

50-315 DATE 02-Mar-93 COMPLETED BY DG Turner TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.

C.

Cook Unit 1

2. Reporting Period February 93
3. Licensed Thermal Power (MWt) 3250 4.

Name Plate Rating (Gross MWe) 1152

5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity (GROSS MWe) 1056 notes 7.

Maximum Dependable Capacity (Net MWe) 1020

8. If Changes Occur in Capacity Ratings (Items no.

3 through 7) Since Last Report Give Reasons 9.

Power Level To Which Restricted. If Any (Net MWe) 10.

Reasons For Restrictions. If Any:

11. Hours in Reporting Period 12.

No. of Hrs. Reactor Was Critical

13. Reactor Reserve Shutdown Hours
14. Hours Generator on Line
15. Unit Reserve Shutdown Hours
16. Gross Therm.

Energy Gen.

(MWH)

17. Gross Elect.. Energy Gen.

(MWH)

18. Net Elect. Energy Gen.

(MWH)

19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate 24.

Shutdowns Scheduled over Next Six None This Mo.

Yr.

672.0 672.0 0.0 672.0 0.0 2030785 657620 633026 100.0 100.0 92.4 92.4 0.0 Months (Type, to Date 1416.0 1416.0 0.0 1416.0 0.0 4443169 1444310 1392514 100 '

100.0 96.4 96.4 0.0 Date,and Cumm.

159217.0 118310.4 463.0 116264.6 321. 0 339885492 110387670 106154879 74.0 74.0 66.3 64.6

6.4 Duration)

25. If Shut Down At End of Report Period, Estimated Date of Startup:

26., Units in Test Status (Prior to Commercial Operation):

Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

50-315 UNIT ONE DATE 02-Mar-93 COMPLETED BY DG Turner TELEPHONE 616-465-5901 MONTH February 93 DAY 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 AVERAGE DAILY POWER LEVEL 1022 1025 1023 1023 1023 1013

, 1019 1016 1015 1020 1020 902 533 530 519 532 DAY 17 18 19 20 21 22 23 24 25 26 27 28 AVERAGE DAILY POWER LEVEL 923 1025 1023 1021 1022 1020 1022 1025 1020 1020 998 1023

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: FEBRUARY 1993 UNIT NAME:

D. C.

COOK UNIT 1.

DATE:

March 8, 1993 COMPLETED BY:

G. J. Costello TELEPHONE:

(616) 465-5901 DURATION NO.

DATE TYPE HOURS METHOD OF SHUTTING DOWN REASON REACTOR LICENSEE EVENT REPORT NO.

SYSTEM CODE%

COMPONENT CAUSE AND CORRECTIVE ACTION CODE TO PREVENT RECURRENCE 305 930212 S

N/A N/A N/A N/A N/A The reactor power was reduced to 57%

RTP on 930212 to accommodate the removal of one main feed pum~

from service at a time for planned maintenance activities.

Reactor power was returned to 100%

RTP on 930217.

1 F:

S Forced Scheduled 2

Reason:

A:

Equipment Failure (Explain)

B:

Maintenance or Test C:

Refueling D:

Regulatory Restriction E:

Operator Training and License Examination F:

Administrative G:

Operational Error (Explain)

H:

Other (Explain) 3 Method:

1:

Manual 2:

Manual Scram 3:

Automatic Scram 4:

Other (Explain) 4Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 1061) 5Exhibit I:

Same Source

DOCKE O.:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

DATE'AGE:

50-315 D.C.

Cook Unit 1 G.J. Costello (616) 465-5901 March 8, 1993 Page 1 of 1

MONTHLY OPERATING ACTIVITIES FEBRUARY 1993 HIGHLIGHTS The unit entered the reporting period in Mode 1 at 1004 RTP.

On 02-12-93 reactor., power was reduced to 574 RTP to accommodate the removal of one main feed pump from service at a time for planned maintenance activities.

The Unit was returned to 100%

RTP 02-17-93.

The unit exited this reporting period in Mode 1 at 100~

RTP.

There were no challenges to the pressurizer safety valves or power, operated relief valves.

Gross Electrical generation for the month of February was 657620 MWH.

DETAILS 02-12-93 1500 Commenced reactor power decrease to remove the west main feed pump from service.

2210 Stabilized reactor power at 57% RTP.

02-14-93 1240 West main feed pump in service, east main feed pump removed from service.

02-16-93 1713 Placing east main feedpump in service.

1925 Commenced reactor power increase.

02-17-93 0445 Stopped reactor power increase at 86:

RTP due to a problem with a turbine auxiliary cooling water system valve.

1048 Commenced reactor power increase.

1445 Reactor power is at 1004 RTP.

02-26-93 2241 Commenced reactor power decrease to 90%

RTP for main turbine valve testing.

02-27-93 0032 Reactor power is at 904 RTP.

0342 Commenced reactor power increase.

0615 Reactor power is at 1004 RTP.

DOCKET NO:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

DATE:

PAGE 50-315 D.C.

Cook Unit 1 E.C.

Schimmel (616) 465-5901 March 5, 1993 1 of 1 MAJOR SAFETY-RELATED MAINTENANCE Februar 1993 There were no major safety-related maintenance items during the month of February.