Informs That Util 921005 Response to NRC Bulletin 92-01, Suppl 1, Failure of Thermo-Lag 330 Fire Barrier Sys, Acceptable
ML17331A022
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/21/1993
From: Bill Dean
Office of Nuclear Reactor Regulation
To: Fitzpatrick E
AMERICAN ELECTRIC POWER SERVICE CORP., INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
References
IEB-92-001, IEB-92-1, TAC-M83863, NUDOCS 9301290024
Download: ML17331A022 (3)


Text

Docket Nos.

50-315 and 50-316 January 21, 1993 Mr. E.

E. Fitzpatrick, Vice President Indiana Michigan Power Company c/o American Electric Power Service Corporation 1 Riverside Plaza

Columbus, Ohio 43216

Dear Hr. Fitzpatrick:

SUBJECT:

RESPONSE

TO NRC BULLETIN 92-01, SUPPLEMENT 1, "FAILURE OF THERMO-LAG 330 FIRE BARRIER SYSTEM" (TAC NOS.

H83863 AND M83864)

By letter dated October 5,

1992, you provided a response to NRC Bulletin 92-01 for Donald C.

Cook Nuclear Plant Units 1 and 2.

Your response stated that compensatory measures have been implemented consistent with the plant Technical Specifications for inoperable fire barriers, even though the fire barriers have not been declared inoperable.

You also provided a description of the long term corrective action to insure or restore operability, which is predicated on the results of an ongoing effort sponsored by the Nuclear Management and Resources Council (NUMARC).

We have reviewed your response and find it acceptable.

Please inform us when all corrective actions have been completed.

Further NRC review, if any, will be performed by inspection or audit.

Sincerely, CC:

See next page William H. Dean, Sr. Project Manager Project Directorate III-1 Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation DISTRIBUTION:

Docket File J.

Roe L. Harsh OGC A. Hasciantonio NRC 8 Local PDRs T. King H. Shuttleworth ACRS (10)

P.

Madden PDI II-1 Reading D.C.

Cook Plant File W.

Dean W. Shafer, R-III OFFICE NAME DATE PDIII-1:LA HShttle ort Ol 93 PDII

PH Wean vsb 01 93 SPLB Ca &RiZACK 44adden Ol 93 PD III-1: PD LHarsh r

Ol 2 I 93 DOCUMENT NAME: C083863.HEH 93012'F0024 930121 PDR ADQCK',05000315 8

PDR lp

~S REMI 0

Cy 0O Vl0 Cy

+

gO

%~*y+

Docket Nos.

50-315 and 50-316 UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 January 21, 1993 Hr.

E.

E. Fitzpatrick, Vice President Indiana Hichigan Power Company c/o American Electric Power Service Corporation 1 Riverside Plaza

Columbus, Ohio 43216

Dear Hr. Fitzpatrick:

SUBJECT'ESPONSE TO NRC BULLETIN 92-01, SUPPLEHENT 1, "FAILURE OF THERHO-LAG 330 FIRE BARRIER SYSTEH" (TAC NOS.

H83863 AND H83864)

By letter dated October 5,

1992, you provided a response to NRC Bulletin 92-01 for Donald C.

Cook Nuclear Plant Units 1 and 2.

Your response stated that compensatory measures have been implemented consistent with the plant Technical Specifications for inoperable fire barriers, even though the fire barriers have not been declared inoperable.

You also provided a description of the long term corrective action to insure or restore operability, which is predicated on the results of an ongoing effort sponsored by the Nuclear Hanagement and Resources Council (NUHARC).

We have reviewed your response and find it acceptable.

Please inform us when all corrective actions have been completed.

Further NRC review, if any, will be performed by inspection or audit.

Sincerely, William H. Dean, Sr. Project Hanager Project Directorate III-1 Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation CC:

See next page

~

~

v E.

E. Fitzpatrick Indiana Hichigan Power Company CC:

Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attorney General Department of Attorney General 525 West Ottawa Street Lansing, Hichigan 48913 Township Supervisor Lake Township Hall post Office Box 818 Bridgman, Hichigan 49106 Al Blind, Plant Hanager Donald C.

Cook Nuclear Plant Post Office Box 458 Bridgman, Hichigan 49106 U.S. Nuclear Regulatory Commission Resident Inspector Office 7700 Red Arrow Highway Stevensville, Hichigan 49127 Gerald Charnoff, Esquire

Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.

W.

Washington DC 20037 Hayor, City of Bridgman Post Office Box 366 Bridgman, Hichigan 49106 Special Assistant to the Governor Room 1 - State Capitol Lansing, Hichigan 48909 Nuclear Facilities and Environmental Honitoring Section Office Division of Radiological Health Department of Public Health 3423 N.

Logan Street P. 0.

Box 30195

Lansing, Hichigan 48909 Donald C.

Cook Nuclear Plant Hr. S.

Brewer American Electric Power Service Corporation 1 Riverside Plaza

Columbus, Ohio 43216