Monthly Operating Rept for Dec 1992 for Donald C Cook Nuclear Plant,Unit 2.W/930108 Ltr
ML17329A751
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/31/1992
From: Blind C, Doreen Turner
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9301220179
Download: ML17329A751 (8)


Text

ACCELE~RATg) iD~OCVMENT~DiISTV~T~ION SYSTEM ACCESSION NBR:9301220179 DOC.DATE: &Qy-R4~ NOTARIZED: NO DOCKET FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH. NAME AUTHOR AFFILIATION TURNERED.G. Indiana Michigan Power Co. (formerly Indiana & Michigan Ele BLIND,C.E. Indiana Michigan Power Co. (formerly Indiana 6 Michigan Ele RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Dec 1992 for Donald C Cook Nuclear Plant, unit 2.N/~30108 ltr. D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR /

TITLE: Monthly Operating Report (per Tech Specs)

ENCL 2 SIZE:

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL A PD3-1 LA 3 3 PD3-1 PD 1 1 DEANPW 1 1 AEOD/DSP/TPAB INTERNAL: AEOD/DOA

'1 1 1 1 1 D

NRR/DLPQ LPEB10 1 1 NRR/DOEA/OEAB 1 1 G""'F 1 1 RGN3 1 1 EXTERNAL: EGGG BRYCEPJ.H 1 1 NRC PDR 1 1 NSIC 1 1 D

D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P1-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14

Indiana Michigan Power Company Cook Nuclear Plant One Cook Place Bridgman, Ml 49106 616 465 5901 INQMNA MICNIGQM January 8, 1993 POMME'.S.

Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of December 1992 is submitted.

Respectfully, A.A. Blind Plant Manager Attachment c'RC Region III D.R. Hahn R.C. Callen S. Hamming J.G. Keppler INPO Records Center ANI Nuclear Engineering Department D.H. Williams, Jr.

E.E. Fitzpatrick R.L. Simms W.G. Smith, Jr.

D.A. Georgantis D.W. Paul S.H. Steinhart J.L. Leichner J.A. Isom D.G. Turner E.A. Smarrella J.C. Krieger B.A. Svensson D.F. Krause E.C. Schimmel 930i220i?9 92i231 "PDR ADOCK 05000316 PDR

N.R.C. OPERATING DATA REPORT DOCKET NO. 50-316 DATE 08-Jan-93 COMPLETED BY DG Turner .

TELEPHONE 616-465-5901 OPERATING STATUS

l. Unit Name D. C. Cook Unit 2
2. Reporting Period December 92 notes
3. Licensed Thermal Power (MWt) 3411
4. Name Plate Rating (Gross MWe) ~ 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity (GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1090
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted.
10. Reasons For Restrictions. If If Any (Net, MWe)

Any:

This Mo. Yr. to Date Cumm.

11. Hours in Reporting Period 744.0 8785.0 131497.0
12. No. of Hrs. Reactor Was Crit'ical 744.0 3169.4 86357.5
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator on Line 300.7 1716.3 83316.4
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Therm. Energy Gen. (MWH) 862331 4893139 257587772
17. Gross Elect. Energy Gen. (MWH) 256060 1485880 83754030
18. Net Elect. Energy Gen. (MWH) 245846 1427300 80672172
19. Unit Service Factor 40.4 19.5 64.5
20. Unit Availability Factor 40.4 - 19.5 64.5
21. Unit Capacity Factor (MDC Net) 30.3 14.9 58.8
22. Unit Capacity Factor (DER Net) 30.3 15.0 57.3
23. Unit Forced Outage Rate 59.6 69.7 16.4
24. Shutdowns, Scheduled over Next Six Months (Type, Date,and Duration):
25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO. 50-316 UNIT TWO DATE 08-Jan-93 COMPLETED BY DG Turner TELEPHONE 616-465-5901 MONTH December 92 AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 1 0 17 0 2 0 18 0 3 ' 0 19 3 0 20 217 5 0 21 409 6 0 22 426 7 0 23 677 8 0 24 949 9 0 25 1062 10 0 26 1068 11 0 27 1080 12 0 28 1106 13 0 29 1079 14 0 30 1083 15 0 31 1084 16 0

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME: D. C. COOK UNIT 2 DATE: January 5, 1993 REPORT MONTH: DECEMBER 1992 COMPLETED BY: G. J. Costello TELEPHONE: (616) 465-5901 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE HOURS REASON REACTOR REPORT NO. CODE% CODE TO PREVENT RECURRENCE 225 920908 F 29.5 N/A N/A N/A Following the installation of the Cont'd main generator rotor, unit 2 entered this reporting period with the reactor at 8% RTP in support of turbine roll and main turbine generator vibration testing.

226 921202 F 413.8 N/A N/A N/A Following the parallel of the main generator to the grid on 921202 at 0527, the generator was removed from the grid at 0910 due to high turbine generator vibration. Following generator bearing clearance adjustments and generator hydrogen seal modifications, the generator was paralleled to the grid on 921219 at 1500 and reactor power was increased to 100% RTP per the power ascension testing program.

2 3 4 5 F: Forced Reason: Method: Exhibit G Instructions Exhibit I: Same S Scheduled A: Equipment Failure (Explain) 1: Manual for preparation of data Source B: Maintenance or Test 2: Manual Scram entry sheets for Licensee C: Refueling 3: Automatic Scram Event Report (LER) File D: Regulatory Restriction 4: Other (Explain) (NUREG 1061)

E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)

DOCKE1 NO.: 50-316 UNIT NAME: D.C. Cook Unit 2 COMPLETED BY: G. J. Costello TELEPHONE: (616) 465-5901 DATE: January 5, 1993 PAGE: Page 1 of 2 MONTHLY OPERATING ACTIVITIES DECEMBER 1992 HIGHLIGHTS The unit entered the reporting period in Mode 1 with the reactor at 8%

RTP conducting turbine generator vibration testing. The turbine generator was paralleled to the grid on December 2, 1992 at 0527 followed by the removal of the turbine generator from the grid at, 0910 due to high vibrations.

Following generator bearing clearance adjustments and generator hydrogen seal modifications, the turbine generator was paralleled to the grid on December 19, 1992 at 1500 followed by reactor power increase to 100% per the power ascension testing program. The reactor was at 100% RTP on December 26( 1992 at 2054.

The unit exited this reporting period in Mode 1 at 100% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross Electrical generation for the month of December was 256060 MWH.

DETAILS 12-2-92 0527 Turbine Generator paralleled to the grid.

12'-2-92 0910 Turbine Generator removed from the grid.

12-6-92 1300 Commenced reactor power decrease.

1342 The reactor is in Mode 2.

12-8-92 1532 Commence reactor power increase.

1545 The reactor is in Mode 1.

Between December 8'" and 19'" the reactor was maneuvered between Mode 1 and Mode 2 to support main turbine vibration evaluation and balancing efforts.

y ~

o DOCKE O.: 50-316 UNIT NAME: D.C. Cook Unit 2 COMPLETED BY: G. J. Costello TELEPHONE: (616) 465-5901 DATE January 5, 1993 PAGE: Page 2 of 2 MONTHLY OPERATING ACTIVITIES DECEMBER 1992 12-19-92 0212 Stabilized reactor power at 8~o RTP.

1500 Turbine generator paralleled to the grid.

2112 Commenced reactor power increase.

12-20-92 0920 Stabilized reactor power at 284 RTP.

1341 Commenced reactor power increase.

12-21-92 0743 Stabilized reactor power at 48% RTP for flux mapping.

12-22-92 1930 Commenced reactor power increase.

12-23-92 0445 Stabilized reactor power at 62% RTP to place the reheaters in service.

0630 Commenced reactor power increase.

12-24-92 0035 Stabilized reactor power at 88: RTP.

1205 Commenced reactor power increase.

1559 Stabilized reactor power at 90~ RTP for flux mapping.

I 2029 Commenced reactor power increase to 97% RTP.

2344 Stabilized reactor power at 97% RTP.

12-26-92 2015 Commenced reactor power increase.

2054 Reactor power at 100% RTP.

DOCKET NO: 50-316 UNIT D.C. Cook Unit 2 NAME'OMPLETED BY: E.C. Schimmel TELEPHONE: (616) 465-5901 January 8, 1992 DATE'AGE:

1 of 1 ~

MAJOR SAFETY-RELATED MAINTENANCE December 1992 There were no major safety-related maintenance items during the month of December.