ML17329A677

From kanterella
Jump to navigation Jump to search
Forwards Revised Safety Insp Repts 50-315/92-15 & 50-316/92-15 on 920831-1009.Improvements in Communication Between Corporate Design Engineering & Plant Engineering Observed
ML17329A677
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 11/16/1992
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
Shared Package
ML17329A676 List:
References
NUDOCS 9211230098
Download: ML17329A677 (2)


See also: IR 05000315/1992015

Text

November

16,

1992

Docket No. 50-315

Docket No. 50-316

Indiana Michigan Power

Company

ATTN:

Mr. E.

E. Fitzpatrick

Vice President

Nuclear Operations Division

1 Riverside Plaza

Columbus,

OH

43216

SUBJECT:

NRC INSPECTION REPORTS

NO. 50-315/92015(DRS)I

NO. 50-316/92015(DRS)

Dear Mr. Fitzpatrick:

This refers to the routine safety inspection conducted

by

R. A. Langstaff,

G.

M. Nejfelt, and P.

R. Rescheske

from this

office on August 31 through October 9,

1992.

The inspection

included

a review of activities authorized

by NRC Operating

Licenses

No. DpR-58 and No. DpR-74 for the D.C.

Cook Nuclear

power plant, Units

1 and 2.

A discussion of our findings was

held with you and members of your staff at the conclusion of the

inspection.

The purpose of this inspection

was to assess

the, quality and

effectiveness

of engineering

involvement in plant activities.

The enclosed

copy of our inspection report identifies'reas

examined during the inspection.

Within these

areas,

the

inspection consisted of a selective

examination of procedures

and representative

records,

observations,

and interviews with

personnel.

No violations of NRC requirements

were identified during the

course of this inspection.

Improvements in communication

between

corporate design engineering

and plant engineering

was recognized

as compared to previous inspections.

This improvement

was

evident during the post-modification testing phase of the design

change process.

According to 10 CFR 2.790 of the Commission's regulations,

a copy

of this letter and the enclosed

inspection report will be placed

in the

NRC Public Document

Room.

9211230098

9211'16

PDR

ADOCK 05000315

9

PDR

Indiana Michigan Power

Company

~

~

~

November l6, )992

We will gladly discuss

any questions

you have concerning this

inspection.

Sincerely,

Original signed

by Geoffrey C. Wright

Geoffrey C. Wright, Chief

Operations

Branch

Enclosure:

Inspection Reports

No. 50-315/92015(DRS)1

No. 50-316/92015(DRS)

cc w/enclosure:

A. A. Blind, Plant Manager

DCD/DCB (RIDS)

OC/LFDCB

Resident Inspector, RIII

James

R. Padgett,

Michigan Public

Service

Commission

EIS Coordinator,

USEPA

Region

5 Office

Michigan Department of,

Public Health

J.

F. Stang, Jr.,

LPM,

NRR

RI

R

L

g taff/cg

gf lt

11/ I ( /92

11/I

/92

RI

R

eske

11)/ /92

RI ~I

B.>.

gess

11/ /P/92

RI

Jo

e sen

11/ Ig/92

Wright

11// Q/92