ML17329A649
| ML17329A649 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 10/23/1992 |
| From: | Carteaux P INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9211030121 | |
| Download: ML17329A649 (10) | |
Text
,
~CCZI,rZ~VZO OiS~ru~urrOX OZVrO~~m~XION SVSrZX REGULBT INFORMBTION DZSTRIBUTIO STEM (RIDE)
ACCESSION NBR:9211030121 DOC.DATE: 92/10/23 NOTARIZED: NO DOCKET FACIL:$0-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana M
05000315 50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana M
05000316 AUTH.NAME AUTHOR AFFILIATION CARTEAUX,P.F.
Indiana Michigan Power Co. (formerly Indiana 6 Michigan Ele RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards summary of contents of reference matls for use in developing 6 administering upcoming NRC initial written 6
annual requalification examinations a
15 boxes containing matls.W/o boxes.
DISTRIBUTION CODE:
M003D COPIES RECEIVED:LTR 2 ENCL L SIZE:
TITLE: Operator Requalification Program NOTES:
RECIPIENT ID CODE/NAME PD3-1 LA STANGFJ INTERNAL: AEOD/DOA NRR/DLPQ/LOLB10 RGN3 EXTERNAL:.NRC PDR COPIES LTTR ENCL 1
0 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD3-1 PD P
NRR DLPQ/LHFB11 REG FILE 01 NSIC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 eP
~ I NOTE TO ALL RIDS RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
//
TOTRL NUMBER OF COPIES REQUIRED:
LTTR LiV'NCL
Cj
V 1
r r
r Cook Nuclear Plan Training Center P.O. Box 458 Bridgman, Ml 49106 616 465 5901 October 23, 1992 Donald C. Cook Nuclear Plant Units 1 2 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74
SUBJECT:
RO/SRO INITIAL/REQUALLICENSE EXAMINATION Reference Materials U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
'ttention:
Mr. M. P. Phillips REFERENCE; (a)
USNRC Letter Dated 9/16/92 from Mr. Geoffrey C. Wright to Mr. E. E. Fitzpatrick (90-day Notification Letter)
Dear Mr. Phillips:
As required by reference (a), this letter transmits one complete set of approved (where appropriate) D.C. Cook Plant reference materials for use in developing and administering our upcoming NRC initialwritten and annual requalification examinations.
Accompanying this letter are fifteen (15) boxes containing these materials. A complete replication of these materials except as noted on Attachment 1 has been sent to Sonalysts Incorporated.
For your convenience a brief summary of the contents of these boxes is provided as Attachment 1,
The requalification examination banks referenced in Enclosure 1 of reference (a) willbe sent at a later date.
Ifyou have any questions regarding this submittal or require additional materials, please contact Mr. John Stubblefield at (616) 465-5901, extension 3109.
Sincerely, P. F. Carteaux Tra:."'r.
Superintendent 2i 92a023 c
cy211030<2~
0500031'5 pDR ADOCK pDR V
t A
RO/SRO INITIALLICENSE EXAMINATION October 23, 1992 Enclosure CC!
A. A. Blind J. A. Stubblefield W. A. Nichols Sonalysts, Inc.
T. E. Murley J. Isom, Senior NRC Resident Inspector, Cook Nuclear Plant
ATTACHMENT1
SUMMARY
OF CONTENTS D.C. Cook Plant Reference Materials in Support of January 25, 1993 USNRC Examination 1.
TRAININGREFERENCES Lesson Plans - Reactor operator and senior reactor operator lesson plans which include learning objectives. Per telephone conversation between Keith Parkinson and J. StubbleGeld, the fundamentals lesson plans have not been included.
Plant System Descriptions - These are not operating procedures but rather training references for system operation.
Comprehensive Theory Materials - This seven volume reference document was used during our Fundamentals training course, Not sent to Sonalysts.
Job Performance Measures (JPMs)
- These include tasks covering local operations and tasks within the control room complex.
2.
COMPLETE PROCEDURE INDEX Combined Reference Book Index.
This index book contains all required references except the System Description and Prints.
The index for those documents are attached to the specific reference.
3.
ADMINISTRATIVEPROCEDURES Plant Manager Procedures (PMPs)
Plant Manager Instructions (PMIs)
Operations Head Instructions (OHIs) 4.
INTEGRATED PLANT PROCEDURES Operations Head Procedures (OHPs)
Normal OHP 4021 Series Page 1 of 3 10/23/92
ATlACHMENT1 5.
EMERGENCY AND ABNORMALPROCEDURES Operations Head Procedures (OHPs)
Abnormal OHP 4022 Series Emergency OHP 4023 Series 6.
STANDING ORDERS Plant Manager's Standing Orders (PMSOs)
Operations Standing Orders (OSOs) 7.
SURVEILLANCEPROCEDURES Not sent to Sonal sts.
Surveillance - OHP 4030 Series 8.
FUEL HANDLINGAND CORE LOADINGPROCEDURES Fuel Handling - OHP 4050 Series 1
9.
ANMJNCIATOR ALARMPROCEDURES Not sent to Sonal sts.
Annunciator - OHP 4024 Series 10.
RADIATIONPROTECTION MANUAL This is incorporated within the PMP 6010.RPP Series.
11.
EMERGENCY PLAN IMPLEMENTINGPROCEDURE This is incorporated within the PMP 2080.EPP Series.
12.
TECHNICALSPECIFICATIONS Unit 1 and 2 Technical Specifications and Clarifications Additional information may be found in PMI-1040 Attachment P3.
Page 2 of 3 10/23/92
ATTACHMENT1
"-13.
SYSTEM OPERATING'PROCEDURE Refer to Item @4 above.
14.
PIPING AND INSTRUMENT DIAGRAMS This includes electrical one-line diagrams for 4160, 600, and 120 Volt AC and 250 Volt DC.
Allflow PID Diagrams (5100 Series Drawings.)
Electrical Single Line Diagrams (12000 including 4160, 600, and 120V AC and 250 V DC Series.)
Logic/Functional diagrams covering all major instrument and control system (98500 Series drawings.)
15.
TECHNICALDATABOOK The enclosed Technical Data Book does not ha:
a coat."c!!"d set of precautions, limitations, and setpoints.
This information is contained in individual plant and systems operating procedures as necessary.
16.
FACILITYEXAMBANK Sent to Sonalysts only upon request.
17.
SIMULATORREFERENCES Listing of pre-programmed initial conditions.
Malfunction cause and effect which includes an explanation of the ability to vary the severity of a particular malfunction.
Description of local operations and failure capability of instruments and components.
Differences between the simulator and Unit 82 control room.
RO/SRO program simulator training scenarios (lesson plans.)
Page 3 of 3 10/23/92
r 0
4