AUG 18 K92
Docket No. 50-315
No. 50-316
Company
ATTN: Mr. E.
E. fitzpatrick
Vice President
Nuclear Operations Division
1 Riverside Plaza
Columbus,
OH
43216
Dear Mr. Fitzpatrick:
This refers to the routine safety inspection
conducted
by J.
A. Isom,
D. J.
Hartland,
E.
R. Schweibinz,
and
W. D.
Pegg of this office on July 1,
1992,
through August 4,
1992, of activities at the Donald C.
Cook Nuclear Plant,
Units
1 and 2, authorized
by
NRC Operating
Licenses
No.
and DPR-74,
and
to the discussion of our findings with A. A. Blind and others of your staff at
the conclusion of the inspection.
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
No violations of NRC requirements
were identified during the course of this
inspection.
One Unresolved
Item was identified regarding the failure of
pressurizer
safety valves to liftwithin the required tolerance
range.
In accordance
with 10 CFR 2.790 of the Commission's regulations,
a copy of
this letter
(and the enclosed
Inspection
Report) will be placed in the
NRC
Public Document
Room.
We will gladly discuss
any questions
you have concerning this inspection.
Sincerely',
Enclosure:
1. Inspection
Reports
No. 50-315/92014(DRP);
No. 50-316/92014 (DRP)
See Attached Distr ibution
W.
D.
hafer, Chief
Reacto
Projects
Branch
2
RIII
R
MSh fear
a. r(sz-
RII
Schweibinz
F-IL-V>
Jor
e sen
9208260lOS
920818
p5oi
ADQCK 05000315
gpss/
Il~
6P.S RICIj,
(i+ 'LIp
~4
p
~v
n
I
0
n
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
799 ROOSEVELT ROAD
GLEN ELLYN, ILLINOIS 60I 37
Docket" No. 50-315
No. 50-316
Indiana Hichigan
Power
Company
ATTN: Hr.
E.
E. Fitzpatrick
Vice President
Nuclear Operations Division
1 Riverside Plaza
Columbus,
OH
43216
Dear Hr. Fitzpatrick:
This refers to the routine safety inspection
conducted
by J.
A. Isom,
D. J.
Hartland,
E.
R. Schweibinz,
and
W.
D.
Pegg of this office on July 1,
1992,
throu'gh August 4,
1992, of activities at the Donald
C.
Cook Nuclear Plant,
Units
1 and 2, authorized
by
NRC Operating
Licenses
No.
and DPR-74,
and
to the discussion of our findings with A. A. Blind and others of your staff at
the conclusion of the inspection.
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
No violations of NRC requirements
were identified during the course of this
inspection.
'One Unresolved
Item was identified regarding the failure of
pressurizer
safety valves to liftwithin the required tolerance
range.
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy of
this letter (and the enclosed
Inspection
Report) will be placed in the
NRC
Public Document
Room.
We will gladly discuss
any questions
you have concerning this inspection.
Sincerely,
Enclosure:
1. Inspection
Reports
No. 50-315/92014(DRP);
No. 50-316/92014 (DRP)
See Attached Distribution
~ W.
hafer, Chief
Reactor Projects
Branch
2
Distribution
cc w/enclosures:
A. A. Blind, Plant Hanager
DCD/DCB (RIDS)
OC/LFDCB
Resident
Inspector,
RIII
James
R. Padgett,
Hichigan
Public Service
Commission
EIS Coordinator,
USEPA
Region
5 Office
Hichigan Department of
Public Health
D.
C. Cook,
LPH,