Forwards Insp Repts 50-315/92-09 & 50-316/92-09 on 920401-0519.No Violations Identifed.One Unresolved Item Re Main Steam Safety Valves Failing to Lift within Required Accuracy Range,Identified
ML17329A535
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 06/08/1992
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
Shared Package
ML17329A536 List:
References
NUDOCS 9206150157
Download: ML17329A535 (5)


See also: IR 05000315/1992009

Text

lf) ~

I

, ~ g

~

~

1

tl

f

JUN 08 tgeg

Docket No. 50-315

Docket No. 50-316

Indiana Michigan Power

Company

ATTN:

Mr. E.

E. Fitzpatrick

Vice President

Nuclear Operations Division

1 Riverside Plaza

Columbus,

OH

43216

Dear Hr. Fitzpatrick:

This refers to the routine safety inspection

conducted

by B. L. Jorgensen,

J.

A. Isom,

and

D.

G.

Passehl

of this office on April 1,

1992,

through

Hay 19,,

1992,

of activities

at

the

Donald

C.

Cook

Nuclear

Plant,

Units

1

and

2,

authorized

by NRC Operating Licenses

No. DPR-58 and DPR-74,

and to the discussion

of our findings with A. A. Blind and others of your staff at the conclusion of

the inspection.

This refers also to the letter from A. A. Blind to J.

A. Isom

dated

May 4,

1992,

concerning

Unresolved

Item 50-316/92006-01.

Areas examined during the inspection are identified in the report, including the

aforementioned

Unresolved Item.

Within these areas,

the inspection consisted of

selective examinations of procedures

and representative

records, interviews with

personnel,

and observation of activities in progress.

No violations of

NRC requirements

were identified during the

course

of this

inspection.

One

Unresolved

Item

was identified regarding

Hain

Steam

Safety

Valves failing to liftwithin the required

accuracy

range.

In accordance

with 10 CFR 2.790 of the Commission's regulations,

a copy of this

letter

and

the

enclosed

inspection

report will be

pglaced

in the

NRC Public

Document

Room.

This includes the A. A. Blind letter of Hay 4,

1992.

We will gladly discuss

any questions

you have concerning this inspection.

Sincerely,

Origi'na1 il~mc~ ~7. '7 ~ >

~ ~0-"+~~>

Edward

G. Greenman,

Director

Division of Reactor Projects

6/

/92

6/

/92

SEE

ATTACHED CONCURRENCE

Enclosures:

l.

Inspection

Report

No. 50-315/92009(DRP

No. 50-316/92009(DRP

2.

Letter dated

Hay 4,

19

2m frin

A. A. Blind, Plant Manager,

D.

C.

Cook Nuclear Plant,

to J. A. Isom,

SRI

RIII

RIII

Schweibinz

Jorgensen

Schumacher

Shafer

6/3 /92

6/$ /92

+ 6/p/92

920bi50157

920b08

PDR

ADOCK 05000315

9 *-,'DR.

Q t

OI

Docket No. 50-315

Docket No. 50-316

JUN OS tggg

Indiana Michigan Power

Company

ATTN: -Hr. E.

E. Fitzpatrick

Vice President

Nuclear Operations Division

1 Riverside

Plaza

Columbus,

OH

43216

Dear Hr. Fitzpatrick:

This refers to the routine safety inspection

conducted

by B. L. Jorgensen,

J.

A. Isom,

and

D.

G. Passehl

of this office on April 1,

1992,

through

Hay 19,

1992, of activities at the Donald

C.

Cook Nuclear Plant, Units

1

and 2,

authorized

by

NRC Operating

Licenses

No.

DPR-58

and

DPR-74,

and to the

discussion of our findings with A. A. Blind and others of your staff at the

conclusion of the inspection.

This refers also to the letter from A. A. Blind

to J.

A. Isom dated

May 4,

1992,

concerning

Unresolved

Item 50-316/92006-01.

Areas

examined during the inspection

are identified in the report, including

the aforementioned

Unresolved

Item.

Within these

areas,

the inspection

consisted of selective

examinations

of procedures

and representative

records,

interviews with personnel,

and observation of activities in progress.

No violations of NRC requirements

were identified during the course of this

inspection.

One Unresolved

Item was identified regarding

Hain Steam Safety

Valves failing to liftwithin the required

accuracy

range.

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy of

this letter and the enclosed

inspection report will be placed in the

NRC

Public Document

Room.

This includes the A. A. Blind letter of Hay 4,

1992.

We will gladly discuss

any questions

you have concerning this inspection.

Sincerely,

Edward

G.

Greenman,

Director

Division of Reactor Projects

RIII

RIII

5~~

Jo

ens

n t'~~ < Sh

er

~9+

~c

eibinz

Enclosures:

l.

Inspection

Report

No. 50-315/92009(DRP);

No. 50-316/92009(DRP)

2.

Letter dated

Hay 4,

1992,

from

A. A. Blind, Plant Manager,

D. C.

Cook Nuclear Plant,

to J.

A. Isom, Senior Resident

Inspector

RIII

RIII

Greenman

Indiana Michigan Power

Company

Distribution

cc w/enclosure:

A. A. Blind, Plant Manager

DCD/DCB (RIDS)

OC/LFDCB

Resident

Inspector,

RIII

James

R. Padgett,

Michigan Public

Service

Commission

EIS Coordinator,

USEPA

Region

5 Office

Michigan Department of

Public Health

D.

C.

Cook,

LPM,

NRR

Q

~