ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM g

r ~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9205070183 DOC.DATE: 92/05/01 NOTARIZED:

NO FACIL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana M

50-316 Donald C.

Cook Nuclear Power Plant, Unit 2, Indiana M

AUTH.NAME AUTHOR AFFILIATION FITZPATRICK,E.

American Electric Power Co., Inc.

RECIP.NAME RECIPIENT AFFILIATION MURLEY,T.E.

Document Control Branch (Document Control Desk)

SUBJECT:

Requests staff's review 6 approval of a license amendment that will be submitted later to allow use of difital-based reactor protection sys.

DISTRIBUTION CODE:

A001D COPIES RECEIVED:LTR

(

ENCL 5

SIZE:

TITLE: OR Submittal:

General Distribution NOTES DOCKET 05000315 05000316 D

RECIPIENT ID CODE/NAME PD3-1 LA STANG,J INTERNAL: NRR/DET/ECMB 7D NRR/DOEA/OTSB11 NRR/DST/SELB 7E NRR/DST/SRXB SE OC/LFMj3 RE@ FILE 01 EXTERNAL: NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME PD3-1 PD NRR/DET/ESGB NRR/DST 8E2 NRR/DST/SICBSH7 NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR/EIB NSIC COPIES LTTR ENCL 1

1 1

D D

D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 18 ENCL Q

D f,

D S

4

American ElectricP~

Service Corporation~

1 Riverside Plaza Columbus, OH 4321 5 614 223 1000 AEP:NRC:

1159B Donald C.

Cook Nuclear Plant Units 1 and 2

Docket Nos.

50-315 and 50-316 License Nos.

DPR-58 and DPR-74 REACTOR PROTECTION SYSTEM MODIFICATION U.

S. Nuclear Regulatory Commission Document Control Desk Washington, D.

C.

20555 Attention:

T. E. Murley May 1, 1992

Dear Dr. Murley:

On April 21, 1992 a meeting was held among personnel from American Electric Power Service Corporation (AEPSC),, Foxboro, and, your staff to discuss the plans, schedules,,and in*terfaces for, an, upgrade to the 'reactor protect'ion sys'em',(RPS).foi3)onald,C.'oo/,Nuclear Plant

'Units" 1'rid'-2.

Consi'stent'i:th the meetin'g.cominitments',

this letter serves to foimally'.request youi staff's, review and ~approval of, a 1'i'cense amendm'ent that" will be 'submi,t'ted at'

'later, date,.to allow use of this digital-based reactor protection sys'em.

As noted.at the meeting, this modification is necessary due to the increased maintenance required on the existing analog protection system and the difficulty in obtaining qualified replacement parts.

The modification involves the installation of Foxboro's Spec 200 and Spec 200 microprocessor line of instrumentation.

We believe that this modification will enhance overall plant safety due to the reduced

drift, enhanced reliability, and greater flexibility provided by microprocessor-based hardware.

The Foxboro 'Spec 200 line of instrumentation has proven itself in both nuclear and non-nuclear applications.

A majority of the engineering documentation will be available by November 30, 1992.

As agreed to at the April 21 meeting, the engineering data and the'pecific license change request will, be submitted at that time for NRC review and approval.

The,remainder, including factory'cceptance test results, willb'e completed shortly, ther'eafter,'nd 'will'e availabl'e 'or..staff,ieview.... Zt was understood from the meeting*that'your staff will be, able to support a"revi'ew schedule that will allow, shipment of equipment in May 1993.,

We'ill provide whatever support your staff needs in order, to meet this'chedule.

6 VOQ."..c 9205070183 920501 PDR ADOCK 05000315 P

P.DR

0

~ ~

a

Dr. T.

E. Murley AEP:NRC:

1159B This document has been prepared following Corporate procedures that incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.

Sincerely, EF E. E. Fitzpa rick Vice President aln CC:

D. H. Williams, Jr.

A. A. Blind - Bridgman J.

R. Padgett G. Charnoff NFEM Section Chief A. B. Davis - Region III NRC Resident Inspector

- Bridgman

I

~

v s