ML17329A427

From kanterella
Jump to navigation Jump to search
Advises That Emergency Response Data Sys Implementation Plan,Acceptable
ML17329A427
Person / Time
Site: Cook  
Issue date: 03/13/1992
From: Stang J
Office of Nuclear Reactor Regulation
To: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
References
NUDOCS 9204010303
Download: ML17329A427 (3)


Text

Docket Nos.

50-315 50-316 Hr.

E.

E. Fitzpatrick Vice President Indiana Hichigan Power Company Post Office Box 16631

Columbus, OH 43216

Dear Hr. Fitzpatrick:

March 13, 1992 The U.S. Nuclear Regulatory Commission (NRC) has reviewed the Emergency

Response

Data System (ERDS) implementation plan which you submitted in a letter dated October 28, 1991.

Based upon this review, the NRC has found that your implementation plan provides the basis for an acceptable implementation of ERDS at your facility.

Be advised that the testing phase of ERDS implementation involves all licensees testing with the NRC contractor, Halliburton NUS Environmental Corporation.

Since the contractor does not have unlimited resources for testing multiple ERDS links simultaneously, close coordination with the Halliburton NUS personnel in scheduling your EROS testing will be a key element.in the successful completion of EROS implementation.

The project manager at Halliburton NUS is Hr. Tony LaRosa, and he may be reached at (208) 524-9227.

If you have any questions or problems in implementing the ERDS program, please contact Hr. John Jolicoeur, the NRC ERDS project manager, at (301) 492-4155 or myself at (301) 504-1345.

Sincerely, Original signed by Tim Colburn FOR cc:

See next page John F. Stang, Sr. Project Hanager Project Directorate III-1 Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation DISTRIBUTION:

ELJordan, AEOD JRJolicoeur, AEOD
HTaylor, OEDO Local PDR
DFRoss, AEOD
RFPriebe, AEOD DCSP~

DOA R/F

THarsh, NRR IRB R/F
GGrant, OEDO NRC PDR
JFoster, RIII
JFStang, NRR
  • IRB:DOA JJolicoeur:pw 2/11/92
  • SEE PREVIOUS CONCURRENCES
  • IRB:DOA
  • IRB:OOA
  • D:DOA PN:PDSI D:PDSI RFPriebe EWWeiss RLSpessard JStang LHarsh 2/13/92 2/13/92 2/14/92 3/13/92 3/13/92

'0(')9

'2040i

~ pgpapgi5 03 9~oSiS pgp

  • DOC p

F

'l li"",gljO~>'l

c I

4 I

~

~

E i

P.'17i'.

E.

E. Fitzpatrick Indiana Michigan Power Company Donald C.

Cook Nuclear Plant CC:

Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Zllyn, Illinois 60137 Attorney General Department of Attorney General 525 West Ottawa Street

Lansing, Michigan 48913 Township Supervisor Lake Township Hall Post Office Box 818 Bridgman, Michigan 49106 Al Blind, Plant Manager Donald C.

Cook Nuclear Plant Post Office Box 458 Bridgman, Hichigan 49106 U.S. Nuclear Regulatory Commission Resident Inspectors Office 7700 Red Arrow Highway Stevensville, Michigan 49127 Gerald Charnoff, Esquire

Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W.

Washington, DC 20037 Mayor, City of Bridgman Post Office Box 366 Bridgman, Michigan 49106 Special Assistant to the Governor Room 1 - State Capitol

Lansing, Michigan 48909 Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health Department of Public Health 3423 N.

Logan Street Post Office Box 30195

Lansing, Michigan 48909 Hr. S.

Brewer American Electric Power Service Corporation 1 Riverside Plaza

Columbus, Ohio 43216