ML17329A249
| ML17329A249 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 10/01/1991 |
| From: | Marsh L Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML17329A250 | List: |
| References | |
| NUDOCS 9111180313 | |
| Download: ML17329A249 (9) | |
Text
~PR REGIj (4
~o A.nO
/~
gO
+a*++
UNITED STATES NUCLEAR REGULATORY CONlMISSION WASHINGTON, D. C. 20555 INDIANA MICHIGAN POWER COMPANY DOCKET NO. 50-315 DONALD C.
COOK NUCLEAR PLANT UNIT NO.
1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
157 License No.
DPR-58 l.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Indiana Michigan Power Company (the licensee) dated December 27, 1989, as revised April 4, 1990, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, paragraph 3 of Facility Operating License No.
DPR-58 is hereby amended to read as follows:
9iiii803i3 9ii00i PDR ADQCN 050003i5 P
"2-3.
This license is effective as of the date of issuance and shall expire at midnight October 25, 2014.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION L. B. Marsh, Director Project Directorate III-1 Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation
Attachment:
Page 5a of license Date of Issuance:
October 1, 1991
ATTACHMENT TO LICENSE AMENDMENT NO. 157 FACILITY OPERATING LICENSE NO.
DPR-58 DOCKET NO. 50-315 Replace the following page of the Facility Operating License DPR-58 with the enclosed page.
The revised page is identified by amendment number and contains a vertical line indicating the area of change.
Remove Pa e
5a Insert Pa e
5a
-5a-2.J Renumbered per Amdt. 870 2-22-83 Iodine Nonitorin The licensee shall implement a program which will ensure.:
the capability to accurately determine the airborne iodine concentration in vital areas under accident conditions.
1.
Training of personnel, 2.
Procedures for monitoring, and 3.
Provisions for maintenance of sampling and analysis equipment.
Added per Amdt. 449 8-25-81 3.
This license
$ s effective as of the date of Issuance and shall Added pen expire at midnight October 25, 2014.
Amdt. f>S7 FOR THE NUCLEAR REGULATORY CONMISSION See D.L.
Order, 11-18-77
Enclosure:
Appendix A - Technical Specification Date of Issuance:
t/arch 30, 1976 Original Signed by Roger S. Boyd Roger S. Boyd, Director Division of Project Management Office of Nuclear Reactor Regulation D.C.
COOK UNIT 1
UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 INDIANA MICHIGAN POWER COMPANY DOCKET NO. 50-316
'ONALD C.
COOK NUCLEAR PLANT UNIT NO.
2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 141 License No.
DPR-74 The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Indiana Michigan Power Company (the licensee) dated December 27, 1989, as revised April 4, 1990, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
Accordingly, paragraph 3 of Facility Operating License No.
DPR-74 is hereby amended to read as follows:
3.
This license is effective as of the date of issuance and shall expire at midnight December 23, 2017.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
page lla of License Date of Issuance:
October 1, 1991 L.
B. Marsh, Director Project Directorate III-1 Division of Reactor Projects III/IV/V Office of Nuclear Reactor Regulation
ATTACHMENT TO LICENSE AMENDMENT NO.
141 FACILITY OPERATING LICENSE NO.
DPR"74 DOCKET NO.
50-316 Replace the following page of the Facility Operating License DPR-74 with the enclosed page.
The revised page is identified by amendment number and contains a vertical line indicating the area of change.
Remove Pa e
lla Insert Pa e
lla
2.I STEAM GENERATOR REPAIR PROGRAM (1)
The licensee is authorized to repair Unit 2 steam generators by replacement of major components.
Repairs shall be conducted in accordance with the licensee's commitments identified in the Commission approved Ronald C.
Cook Nuclear Plant Unit No. 2 Steam Generator Repair Report dated November 7, 1986, as revised through Revision 6, and additional comaitments identified in the staff's related Safety Evaluation dated (2)
The Technical Specifications identified in Table 3.2-2 of the Steam Generator Repair Report dated November 7,
- 1986, as revised through Revision 6 dated February 18, 1988, will not be applicable during the repair program.
For purposes of Technical Speci fication applicability, the Steam Generator Repair Project will begin when the last fuel assembly from the Unit 2 core is placed in the spent fuel pool and will end when the first fuel assembly is removed from the spent fuel pool to refuel the Unit 2 co re ~
dded erdt. f100 3-8-88 Or> g) nal Ss gned by Roger S.
Boyd Roger S. Boyd, Director Division of Project Management Office of Nuclear Reactor Regulation Renumbe red per Amdt. 834 8-25-81 3..
This license is effective as of the date of issuance and shall Renumbered expire at midnight December 23, 2017.
per Amdt. 829 4-13-81 dded per dt.
- g14I, Attachments 1.
Preoperational
- Tests, Startup Tests and Other Items Which Must Be Completed Pf'.ior to Proceeding to Succeeding Operational Modes 2.
Appendix A - Technical Specifications Date of Issuance:
December 23,(i1977 D.C.
COOK UNIT 2
Pf 1
I