Text
Docket No. 50-315
Docket No. 50-316
NOV 04
1991
Company
ATTN:
Yir. E.
E. Fitzpatrick
.
Yice Pres'ident
Nuclear Operations
Division
1 Riverside Plaza
Columbus,
43216
Dear fir. Fitzpatrick:
This refers to the routine safety inspection
conducted
by J.
A. Isom,
D.
G. Passehl,
E.
R. Schweibinz,
and Jeffrey F. Harold of this office from
September
4 through October
15,
1991, of activities at the Don'aid
C.
Cook
Nuclear Plant,
Units
1 and 2, authorized
by
NRC Operating
Licenses
No.
and DPR-74,
and to the discussion
of our findings with A. A. Blind and others
of your staff at the conclusion of the inspection.
The enclosed
copy of our inspection report identifies areas
examined
during
the inspection.
Within these
areas,
the inspection
consisted
of a selective
examinatiori of procedures
and representative
records,
observations,
and
interviews with personnel.
During the inspection,
one
item
violation of HRC requirements.
taken to correct the identified
Consequent-ly,
we have exercised
Because
we
and correction of problems,
and
Part 2, Appendix C, Section
V.G
violation is not being cited.
was identified which appeared
to be in
The inspection
showed that actions
are being
violation and prevent recurrence.
the'discretion
provided for under the
NRC
want to encourage
prompt self-identification
because
the criteria specified
in 10
CFR
of the Enforcement Policy were satisfied,
the
In accordance
wish
10 CFR 2.790 of the Commission's
regulations,
a copy 'of
this letter
and the enclosure will be placed in the
NRC Public Document
Room'.
We will gladly discuss
any questions
you have concerning this inspection.
Sincerely,
9>>>>iov23 9>>i0 l
ADOCK 050003i5
6
Brent
C 1 ay ton,
Chi ef
Reactor Projects
Branch
2
Enclosure:
1. Inspection
Reports
No. 50-315/91022(DRP);
No. 50-316/91022(DRP)
See Attached Distribution
~Sc
bibicz/dP
(. VOC.:
"
Jo
ensen
/
RIII
C 1 ay ton
Company
Distribution
cc w/enclosure:
A. A. Blind, Plant Manager
DCD/DCB (RIDS)
OC/LFDCB
Resident
Inspector, RIII
James
R. Padgett,
michigan Public
Service
Commission
'IS Coordinator,
USEPA
'egion
5 Office
Michigan Department of
Pub 1 i c Health
D.
C.
Cook,
LPM,
gp II R<CII
(4
P0
Cy
nO
Vl
c
E,
0
4y
Y/
+a*++
Docket No. 50-315
Docket No. 50-316
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
799 ROOSEVELT ROAD
GLEN ELLYN, ILLINOIS 60137
t".QI
U
-
Indiana Hichigan
Power
Company
ATTN:
Hr. E.
E. Fitzpatrick
Yice President
Nuclear Operations Division
1 Riverside Plaza
Columbus,
OH
43216
Dear YIr. Fi tzpa tri c k:
This refers to the routine safety
inspection
conducted
by J.
A. Isom,
D.
G. Passehl,
E.
R. Schweibinz,
and Jeffrey F. Harold of this office from
September
4 through October
15,
1991, of activities at the Donald
C.
Cook
Nuclear Plant, Units
1 and 2, authorized
by
NRC Operating
Licenses
No.
and DPR-74,
and to the discussion
of our findings with A. A. Blind and others
of your staff at the conclusion of the inspection.
The enclosed
copy of our inspection report identifies areas
examined
during
the inspection.
Within these
areas,
the inspection
consisted
of a selective
examination of procedures
and representative
records,
observations,
and
interviews with personnel.
During the inspection,
one item was identified which appeared
to be in
violation of NRC requirements.
The inspection
showed that actions
are being
taken to correct the identified violation and prevent recurrence.
Consequently,
we have exercised
the discretion provided for under the
NRC
Because
we want to encourage
prompt self-identification
and correction of problems,
and because
the criteria specified
in 10 CFR Part 2, Appendix C, Section
Y.G of the Enforcement Policy were satisfied,
the
violation is not being- cited.
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy of
this letter and the enclosure will be placed in the
NRC Public Document
Room.
We will gladly discuss
any questions
you have concerning this inspection.
Sincere ly,
Enclosure:
1. Inspection
Reports
No. 50-315/91022(DRP);
No. 50-316/91022(DRP)
Brent Clay on, Chief
Reactor Projects
Branch
2
See Attached Distribution
4e
Power Company
Distribution
cc w/enclosure:
A. A. Blind, Plant t1anager
DCD/DCB (RIDS)
OC/LFDCB
Resident
Inspector, RIII
James
R. Padgett,
Michigan Public
Service
Commission
EIS Coordinator,
USEPA
Region
5 Office
Michigan Department of
Public Health
D. C. Cook,
LPN,