ML17329A185
| ML17329A185 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 09/17/1991 |
| From: | Beverly Clayton NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Fitzpatrick E INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| Shared Package | |
| ML17329A186 | List: |
| References | |
| NUDOCS 9109240364 | |
| Download: ML17329A185 (5) | |
See also: IR 05000315/1991017
Text
Docket No. 50-315
No. 50-316
g 7.1991
Qc.bc 0 <8)
ki~~
4
Company
ATTN: Mr. E.
E. Fitzpatrick
Vice President
Nuclear Operations Division
1 Riverside
Plaza
Columbus,
OH
43216
Dear Mr. Fitzpatrick:
This refers to the routine safety inspection
conducted
by J. A. Isom,
D.
G. Passehl,
and Z. Falevits of this office from July 23 through September
3,
1991, of activities at the Donald C.
Cook Nuclear Plant, Units
1 and 2,
authorized
by
NRC Operating
Licenses
No.
and to the
discussion
of our findings with A. A. Blind and others of your staff at the
conclpsion of the inspection.
The enclosed
copy of our inspection report identifies areas
examined during
the inspection.
Within these
areas,
the inspection consisted
of a selective
examination of procedures
and representative
records,
observations,
and
interviews with personnel.
During this inspection,
certain of your activities .appeared
to be in violation
of NRC requirements,
as specified in the enclosed
Notice.
A written response
is required.
In accordance
with 10
CFR 2.790 of the Commission's
regulations,
a copy of
this letter,
the enclosures,
and your response
to this letter will be placed
in the
NRC Public Document
Room.
We will gladly discuss
any questions
you have concerning this inspection.
Enclosure:
2. Inspection
Reports
No. 50-315/91017(DRP);
No. 50-316/91017(DRP)
See Attached Distribution
Brent Clayton, Chief
Reactor
Projects
Branch
2
RIII
RIII
Schweibinz/da
Jo
ensen
>/I /~i
9109240364
910917
ADOCK 05000315
8
RIII
Gardner
(Para 5.a)
RIII
(Para.
6b)
'~ "1si
RIII
gt
C
Clayton
.zA7/fl'g
r
g 7 1991
Company
Distribution
cc w/enclosures:
A. A. Blind, Plant Manager
DCD/DCB (RIDS)
OC/LFDCB
Resident Inspector, 'RIII
James
R. Padgett,
Public Service
Commission
EIS Coordinator,
USEPA
Region
5 Office
Michigan Department of
Public Health
D.
C. Cook,
LPM,
~IIR660
tp0
Cy
n0
I
400
+p*y+
Docket No. 50-315
No. 50-316
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
799 ROOSEVELT ROAD
GLEN ELLYN, ILLINOIS 60I91
~~I
g 7 1991
Company
ATTN: Mr. E.
E. Fitzpatrick
Vice President
Nuclear Operations Division
1 Riverside
Plaza
Columbus,
OH
43216
Dear Nr. Fitzpatrick:
This refers to the routine safety inspection
conducted
by J.
A. Isom,
D.
G. Passehl,
and Z. Falevits of this office from July 23 through September
3,
1991, of activities at the Donald
C.
Cook Nuclear Plant, Units
1 and 2,
authorized
by
NRC Operating
Licenses
No.
and to the
discussion
of our findings with A. A. Blind and others of your staff at the
conclusion of the inspection.
The enclosed
copy of our inspection report identifies areas
examined during
the inspection.
Within these
areas,
the inspection consisted
of a selective
examination of procedures
and representative
records,
observations,
and
interviews with personnel.
During this inspection,
certain of your activities appeared
to be in violation
of NRC requirements,
as specified in the enclosed
Notice.
A written response
is required.
In accordance
with 10
CFR 2.790 of the Commission's
regulations,
a copy of
this letter,. the encl'osures,
and your response
to .this letter will be placed
in the
NRC Public Document
Room.
We will gladly discuss
any questions
you have concerning this inspection.
Brent Clay on, Chief
Reactor Projects
Branch
2
Enclosure:
2. Inspection
Reports
No. 50-315/91017(DRP);
No. 50-316/91017(DRP)
See Attached Distribution
y 7
1991
Company
Distribution
cc w/enclosures:
A. A. Blind, Plant Manager
DCD/OCB (RIDS)
OC/LFDCB
Resident Inspector, RIII
James
R. Padgett,
Public Service
Commission
EIS Coordinator,
USEPA
Region
5 Office
Michigan Department of-
Public Health
D.
C. Cook,
LPM,