ML17329A005
| ML17329A005 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 04/17/1991 |
| From: | Ring M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Fitzpatrick E INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| Shared Package | |
| ML17329A006 | List: |
| References | |
| NUDOCS 9104230084 | |
| Download: ML17329A005 (3) | |
See also: IR 05000315/1991009
Text
Docket No. 50-315
Docket No. 50-316
Company
ATTN:
Hr.
E.
E. Fitzpatrick
Vice President
Nuclear Operations Division
1'iverside
Plaza
Columbus,
OH
43216
Gentlemen:
This refers to the routine safety inspection
conducted
by Messrs.
H.
P.
Huber
and J.
F. Smith of this office on March 18-28,
1991, of activities at the
D.
C,
Cook Nuclear Plant, Units
1 and 2, authorized
by
NRC Operating
Licenses
No.
and
No.
DPR-.74
and to the discussion of our findings with
Hr. A, Blind and others of your staff at the conclusion of the inspection.
The enclosed
copy of our inspection report identifies areas
examined during
the inspection.
Within these
areas,
the inspection consisted of a selective
examination of procedures
and re'presentative
records,
observations,
and
interviews with personnel.
These
areas
consisted
of a review of the
D.
C.
Cook Hotor-Operated
Valve Program established
in response
"Safety-Related
Motor-Operated
Valve Testing
and Surveillance."
No violations of NRC requirements
were identified during the course of this
inspection.
In accordance
with 10 CFR 2.790 of the Commission's
regulations,
a copy of
this letter
and the enclosed
inspection report will be placed in the
NRC
Public Document
Room.
We will gladly discuss
any questions
you have concerning this inspection.
Sincerely,
.0",X '1.nal
S'C."aiQ . '!:"=~'r S.. Bi-';",
H. A. Ring, Chief
Engineering
Branch
Enclosure:
Inspection
Reports
No. 50-315/91009(DRS);
No. 50-316/91009(DRS),
See Attached Distribution
Vcf
VEy
RIII
RIII
RII
ubCr/cs/lc
iUi
angelson
/li/91
4/l7 /91
4/)
lr/91
9104230084
910417
ADOCK 05000315
G
)
...:. ~,I/ )f,)
~RI
Jor ensen
4/t /91
4/q /91
Indiana Hichigan
Power
Company
cc w/enclosure:
A. A. Blind, Plant Hanager
DCD/DCB (RIDS)
OC/LFDCB
Resident
Inspector,
RIII
James
R. Padgett,
Hichigan Public
Service
Commission
EIS Coordinator,
USEPA
Region
5 Office
Hichigan Department of
Public Health
D.
C.
Cook,
LPH,
T. Scarbrough,
TABLE OF
CONTENTS
~Pa
e
ersons Contacted.......................................
P
Inspection of Response
to "Generic Letter 89-10..........
a
Background........................................
b.
Generic Letter 89-10 Program Review...............
( 1)
Scope.......................................
(2)
Design Basis Reviews........................
(3)
HOV Switch Settings.................
(4)
Design Basis Differential Pressure
and Flow
(5)
Periodic Verification of HOV Capability.....
(6)
HOV Failures,
Corrective Actions,
and Trendi
( 7)
Schedule....
e ~ ~ ~ ~ ~ ~ i ~ ~ ~ ~ eoo ~ ~ ~ ~ o ~ ~ ~ ~ ~
~
~
~ o
c.
Associated
Programmatic Reviews...................
(1)
Administration of HOV Activities............
(2)
HOV Setpoint Control.......,................
(3)
In'service Testing.........................,.
( 4)
Haintenance.................................
(
o
5)
Training...........
(6)
Follow-up and Trending of HOV Haintenance
an
Problems..................................
(7)
Industry Experience
and Vendor Information,.
(8)
HOV Hodifications
and Design Changes........
( 9)
Procurement.................................
(10) Diagnostics.................................
(ll)
Control of Open Haintenance Items...........
Licensee
Documents Reviewed.........:...................
Conclusions..............,..............................
Unresolved Items........................................
E
'it Heetl ng
~
~
~
o
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
~
o
~
~
~
sting.
Te
Ilg ~
~
~
~
~
~
~
~
~
~
~
~
~
~
d
~
~
~ 3
~
~ 3
~
~
~ 3
~
~
~ 4
~
~
~ 4
~
~
~ 4
~
~
~ 7
~
~
~ 8
~
o
~ 9
..11
..11
..12
..12
..13
..13
..14
..15
..16
..17
..17
17
..18
..19
..19
..21
..21
..21