Forwards Safety Insp Repts 50-315/91-06 & 50-316/91-06 on 910304-14 & Notice of Violation
ML17328A985
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/29/1991
From: Phillips M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Alexich M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
Shared Package
ML17328A986 List:
References
NUDOCS 9104040274
Download: ML17328A985 (2)


See also: IR 05000315/1991006

Text

Ig ~

Cp

r I

= ".~-'~L~J .-

UNITCO STATES

NUCLEAR REGULATORY COMtillSSIOiU

IICGION III

799 ROOSCVCI T AOAO

CI CN CCI YN. ICI.INOIS

COL 37

Docket No.

50-315

Docket No. 50-316

Indiana Michigan Power

Company

ATTN:

Hr. Hilton P. Alexich

Vice President

Nuclear Operations

Division

1 Riverside

Plaza

Columbus,

OH

43216

Gentlemen:

This refers to the routine safety inspection

conducted

by Mr. I. T. Yin of

this office on March

4 through

14,

1991, of activities at D. C.

Cook, Units

1

and 2, authorized

by

NRC Operating

Licenses

No.

DPR-59

and

No.

DPR-74

and to

the discussion of our findings with you and your staff at the conclusion of

the inspection.

The inspection

focused

on the modifications

and design

changes.

The enclosed

copy of our inspection report identifies areas

examined during the inspection.

Within these

areas,

the inspection

consisted of a selective

examination of

procedures

and representative

records,

observations,

and interviews with

personnel.

l

During this inspection,

certain of your activities appeared

to be in violation

of NRC requirements,

as specified in the enclosed

Notice.

A written response

is required.

One violation was identified for failure to provide design

control

and functional verification for some of the plant modifications.

The

cause of the violation can

be attributed to the lack of design interface

between your corporate

design engineers

and the site staff in the area of post

modification test

acceptance

criteria implementation,

system surveillance

criteria establishment,

and operational

procedure

changes.

In accordance

with 10 CFR 2.790 of the Commission's regulations,

a copy of

this letter,

the enclosures,

and your response

to this letter will be placed

in the

NRC Public Document Room..

The responses

directed

by this letter

and the accompanying

Notice are not

subject to the clearance

procedures

of the Office of Management

and Budget

as

required

by the Paperwork Reduction Act of 1980,

PL 96-511.

9104II40274

910329

PDR

ADOCK 05000315

9

PDR

Indiana Michigan Power

Company

We will gladly discuss

any questions

you have concerning this inspection.

Sincerely,

Enclosure:

1.

Notice of Violation

2.

Inspection

Report

No. 50-315/91006(DRS)

and 50-316/91006(DRS)

cc w/enclosure:

A. A. Blind, Plant Manager

DCD/DCB (RIDS)

OC/LFDCB

Resident

Inspector,

RIII

James

R. Padgett,

Michigan Public

Service

Commission

EIS Coordinator,

USEPA

Region

5 Office

Michigan Department of

Public Health

D.

C.

Cook,

LPM,

NRR

M. P. Phillips, Chief

Operations

Branch