Monthly Operating Rept for Mar 1990 for DC Cook,Unit 2
ML17328A887
Person / Time
Site: Cook 
Issue date: 03/31/1990
From: Blind A, Gillett W
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9102080100
Download: ML17328A887 (9)


Text

IF'OHX) 2 REGULa)RY INFORMATION DISTRZBUTl SYSTEM (RIDE)

I

. CCRSSION NBR:9102080100 DOC.DATE: 90/04/04 NOTARIZED: NO DOCKET rACIL:50-316 Donald C.

Cook Nuclear Power Plant, Unit 2, Indiana S

05000316 AUTH.NAME AUTHOR AFFILIATION GILLETT,W.T.

Indiana Michigan Power Co. (formerly Indiana

& Michigan Ele BLIND,A.A.

Indiana Michigan Power Co. (formerly Indiana

& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Mar 1990 for Donald C Cook, Unit 2.W/900404 ltr.

DISTRIBUTION CODE:

DFOZD COFZES RECEIVED:LTR L ENCL C SIZE:

TITLE: Direct Flow Distribution:

50 Docket (PDR Avail)

NOTES:

RECIPIENT ID CODE/NAME INTERNAL: NUDOCS-ABSTRACT EXTERNAL: NRC PDR COPIES LTTR ENCL 1

1 1

1 R

F LE 01 NSIC RECIPIENT ID CODE/NAME COPIES LTTR ENCL 1

1 1

1 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 4

ENCL 4

0 J.

C J

~I I

indiana ihiioh

~ower t:orno

~oo}< Nuclear i.;.nt

'."- Cook P~ece r<darnan.,,l> -'3 r.'-"

-"",6 "o5 a0

.-'ACMNA

,"AICMGslà MME'.S.

Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 April 4, 1990 Gentlemen:

Pursuant to the requirements of Donald C.

Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of March 1990 is submitted.

Respectfully, 0A.~

A.A. Blind Plant Manager c:

B.A. Svensson NRC Region III D.R.

Hahn EPRI Nuclear Safety Analysis Center R.C. Callen S.L. Hall INPO Records Center ANI Nuclear Engineering Department D.H. Williams, Jr.

M.P. Alexich J.F.

Kurgan J.J.

Markowsky D.A. Timberlake D.W. Paul T.O. Argenta S.H. Steinhart B.L. Jorgensen W.T. Gillett E.A. Smarrella J.

Krieger E.C.

Schimmel 9102080100 900404 PDR ADDCK 0500031b R

PDR

0 4

11 l

y('.<)(:g<]

N.R.C.

OPERATING DATA REPORT DOCKET NO.

50-316 DATE 04-Apr-90

.COMPLETED BY WT Gillett TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.

C.

Cook Unit 2

2. Reporting Period MARCH 90 notes
3. Licensed Thermal Power (MWt) 3411 4.

Name Plate Rating (Gross MWe) 1133

5. Design Electrical Rating (Net MWe) 1100 6.

Maximum Dependable Capacity (GROSS MWe) 1100 7.

Maximum Dependable Capacity (Net MWe) 1060

8. If Changes Occur in Capacity Ratings (Items no.

3 through

7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe) 10.

Reasons For Restrictions. If Any:

11.

Hours in Reporting Period 12.

No. of Hrs. Reactor Was Critical

13. Reactor Reserve Shutdown Hours
14. Hours Generator on Line
15. Unit Reserve Shutdown Hours 16.

Gross Therm.

Energy Gen.

(MWH)

17. Gross Elect.

Energy Gen.

(MWH)

18. Net Elect.

Energy Gen.

(MWH)

19. Unit Service Factor
20. Unit Availability Factor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate 24.

Shutdowns Scheduled over Next Six Refuelin outa e to be in on June duration of 77 da s.

This Mo.

Yr.

744.0 744.0 0.0 744.0 0.0 2534067 843300 816057 100.0 100.0 103.5 99.7 0.0 Months (Type, 23, 1990, for to Date Cumm.

8040.0 104472.0 5860.9 69456.0 0.0 0.0 5799.5 68009.5 0.0 0.0 19035456 208601833 6154900 68051120 5942584 65527248 72.1

66. 6 72 ~,1
66. 6 69.7 60.5 67.2 59.0 6.9 13.9 Date,and Duration):

an estimated

25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved

AVERAGE DAILY POWER LEVEL (MWe-Net)

DOCKET NO.

50-316 UNIT TWO DATE 04-Apr-90 COMPLETED BY WT Gillett TELEPHONE 616-465-5901 DAY MONTH AVERAGE DAILY POWER LEVEL MARCH 90 DAY AVERAGE DAILY POWER LEVEL 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 1091 1093 1097 1099 1096 1100 1099 1099 1097 1097 1101 1100 1097 1098 1097 1096 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1097 1098 1096 1096 1097 1098 1097 1090 1100 1100 1095 1097 1094 1098 1094

UNIT SHVKONNS AND PQKR REDUCTIONS REPORT IKNTH:

March 1990 DOCKET NO:

UNIT NAME:

DATE:

CG5IPU"PED BY:

TEXZXSONE:

50-316 D.C.

COOK UNIT 2 April 4, 1990 E.C. Schimmel (616) 465-5901 MEPHOD OF SHUXTING LICENSEE DURATION IX%K EVENT SYSTEM COMPONENT CAUSE AND CORRECPIVE ACZION 'IO NO.

DATE TYPE HOURS REASON REACIOR REPORT NO.

CODE CODE PREVENT RKXjRMQICE None

'Ihere were no unit shutdowns or significant poorer reductions from the aaxioman poorer level of 1004 during the month.

1 F:

S:

2 Forced Reason:

Scheduled A:

Equipment Failure (Explain)

B:

Maintenance or Test C:

Refueling D:

Regulatory Restriction E:

Operator Training and License Examination F:

Administrative G:

Operatonal Error (Explain)

H:

Other (Explain) 3 Method:

1:

Manual 2:

Manual Scram 3:

Automatic Scram 4:

Other (Explain) 4 5

Exhibit G Instructions Exhibit I:

Same S

for preparation of data entry sheets for Licensee Event Report (IZR) File (NUB13G 0161)

DOCKET UNIT NAME:

COMPLETED BY:

TELEPHONE:

DATE'AGE'0-316 D.C.

Cook Unit 2 E.C.

Schimmel (616) 465-5901 April 4, 1990 1 of 1 MONTHLY OPERATING ACTIVITIES March 1990 HIGHLIGHTS The unit entered the reporting period at 100% Rated Thermal Power and exited the reporting period at 100< Rated Thermal Power, with no significant load changes.

Gross electrical generation for the month of March was 843300 MWH.

DETAILS There were no significant operational events during the month of March.

DOCKE 0:

50-3 16 UNIT NAME:

D.C.

Cook Unit 2 COMPLETED BY:

E.C.

Schimmel TELEPHONE:

(616) 465-5901 DATE:

April 4, 1990 PAGE' of 1 MAZOR SAFETY-RELATED MAINTENANCE MARCH 1990 Replaced defective power supply in power range drawer N-41.

Replaced the CD Diesel Generator starting air compressor.