REGUORY INFORMATION DISTRZBU'l1 SYSTEM (RIDE) yl A'CCESSION NBR:9102080009 DOC.DATE: F6/01/04 NOTARIZED:
NO DOCKET FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana 6
05000315 AUTH.NAME AUTHOR AFFILIATION BLIND,A.A.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Submits monthly operating rept for month of Dec 1990.
DISTRIBUTION CODE:
DFOZD COPIES RECEIVED:LTR 2 ENCL
(
SIZE:
TITLE: Direct Flow Distribution:
50 Docket (PDR Avail)
NOTES:
RECIPIENT ID CODE/NAME INTERNAL: NUDOCS-ABSTRACT EXTERNAL: NRC PDR COPIES LTTR ENCL 1
1 1
1 RECIPIENT 1D CODE/NAME REG FILE 01 NSIC COPIES LTTR ENCL
, 1 1
1 1
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 4
ENCL 4
Indiana Mich Power Comp'ook Nuclear I'nt One Cook Place Bridgman, Ml 49I06 616 465 590I January 4,
1990 lNQldhNSl MCNESSlà POWM U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
Pursuant to the requirements of Donald C.
Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of December 1990 is submitted.
Respectfully, A.A. Blind Plant Manager Attachment c
~
NRC Region III D.R.
Hahn EPRI Nuclear Safety Analysis Center R.C. Callen S.L. Hall J.G.
Keppler INPO Records Center
- ANI Nuclear Engineering Department D.H. Williams, Jr.
M.P. Alexich J.F.
Kurgan J.J.
Markowsky D.A. Timberlake D.W. Paul T.O. Argenta S.H. Steinhart J.A.
Isom W.T. Gillett E.A. Smarrella J.C. Krieger B.A. Svensson E.C.
Schimmel 9>oaOSOQOV vOo>04 pDR ADOCIr 0500031>
p PDR 670005
N.R.C.
OPERATING DATA REPORT DOCKET NO.
50-315 DATE 03-Jan-91 COMPLETED BY WT GILLETT TELEPHONE 616-465-5901 OPERATING STATUS
- 1. Unit Name D.
C.
Cook Unit 1
- 2. Reporting Period DEC,90
- 3. Licensed Thermal Power (MWt) 3250 4.
Name Plate Rating (Gross MWe) 1152
- 5. Design Electrical Rating (Net MWe) 1030 6.
Maximum Dependable Capacity (GROSS MWe) 1056 7.
Maximum Dependable Capacity (Net MWe) 1020 notes
- 8. If Changes Occur in Capacity Ratings (Items no.
3 through
- 7) Since Last Report Give Reasons 9.
Power Level To Which Restricted. If Any (Net MWe) 10.
Reasons For Restrictions. If Any:
This Mo.
744.0 0.0 0.0 0.0 0.0 0
0 0
0.0 0.0 0.0 0.0 11.
Hours in Reporting Period 12.
No. of Hrs. Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 14.
Hours Generator on Line
- 15. Unit Reserve Shutdown Hours 16.
Gross Therm.
Energy Gen.
(MWH) 17.
Gross Elect.
Energy Gen.
(MWH)
- 18. Net Elect.
Energy Gen.
(MWH)
- 19. Unit Service Factor
- 20. Unit Availability Factor
. 21. Unit Capacity Factor (MDC Net)
- 22. Unit Capacity Factor (DER Net)
- 23. Unit Forced Outage Rate ERR 24.
Shutdowns Scheduled over Next Six Months (Ty Yr. to Date 8760.0 6944.8 0.0 6939.8 0.0 20541629 6559000 6301645 79.2 79.2 70.5 69.8 0.0 pe,Date,and Cumm.
140256.0 103387.0 463.0 101628.8 321.0 295429648 96131230 92433473 73.5 73.5 65.6 63.7
7.1 Duration)
- 25. If Shut Down At End of Report Period, Estimated Dat.e of Startup:
Januar 14 1990
- 26. Units zn Test Status (Prior to Commerc1al Operation):
Forcast INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION Achieved
AVERAGE DAILY POWER LEVEL (MWe-Net)
DOCKET NO.
50-315 UNIT ONE DATE 02-Jan-91 COMPLETED BY WT GILLETT TELEPHONE 616-465-5901 DAY 1
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 MONTH AVERAGE DAILY POWER LEVEL 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 DEC, 90 DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 AVERAGE DAILY POWER LEVEL 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
UNIT SHVZDONNS AND HNER REIXJCZIONS REPORT MOTH:
December 1990 DOCKlH'O:
UNIT NAME IRTE:
CONPIZHK) BY:
TEIZBK5E:
50-315 D.C.
COOK UNIT 1 January 4, 1990 E.C. Schimmel (616) 465-5901 HEROD OF SHVHPING LICENSEE IX3RATION DC!IN EV'N SYSTEM QMK52Ã2 CAUSE AND CGHKCZIVE ACTION TO NO.
DATE TYPE HOURS REASQN2 REACIGR REPORF NO.
CODE CODE5 RKVlMZKXXJRRENCE 290 10/20/90 S
744.0 (cont.)
N/A ZZ ZZZZZZ
'Ihe unit was removed fmm service at 0031 hours3.587963e-4 days <br />0.00861 hours <br />5.125661e-5 weeks <br />1.17955e-5 months <br /> on 901020 for the cycle 11-12 refueling outage.
We reactor core reloading has been completed and the unit was in mode 5 at the end of the reporting period.
1 2
F:
Forced Reason:
S:
Scheduled A:
Ecpignent Failure (Explain)
B:
Maintenance or Test C:
Refueling D:
Regulatory Restriction E:
Operator Training and Li~Examination F:
Administrative G:
Operational Error (Explain)
H:
Other (Explain) 3 Method:
1:
Manual 2:
M'anual Scram 3:
Other (Explain) 4 5
Exhibit G - Instructions Exhibit I:
Same Source for preparation of data entry sheets for Licensee Event Report (LER) File (NUREQ 0161)
F 4 ~
l V
V ~ J
DOCKETfgg):
UNIT I8ÃE:
COMPLETED BY:
TELEPHONE:
DATE:
PAGE:
50-3 15 D.C.
Cook Unit 1 E.C.
Schimmel (616) 465-5901 January 4,
1991 1 of 1 MONTHLY OPERATING ACTIVITIES December 1990 HIGHLIGHTS The unit entered the reporting period in mode 6 with the reactor core unloaded.
The AB train emergency diesel generator was declared operable at 0034 hours3.935185e-4 days <br />0.00944 hours <br />5.621693e-5 weeks <br />1.2937e-5 months <br /> on December 4,
1990.
The unit then exited the unusual event condition caused by the planned evolution of both emergency diesel generators being declared inoperable at 1325 hours0.0153 days <br />0.368 hours <br />0.00219 weeks <br />5.041625e-4 months <br /> on November 28, 1990. Reactor fuel reloading commenced at 1223 hours0.0142 days <br />0.34 hours <br />0.00202 weeks <br />4.653515e-4 months <br /> on December 8,
1990.
Fuel reloading was complete at 2235 hours0.0259 days <br />0.621 hours <br />0.0037 weeks <br />8.504175e-4 months <br /> on December 10, 1990.
The unit entered mode 5 at 2315 hours0.0268 days <br />0.643 hours <br />0.00383 weeks <br />8.808575e-4 months <br /> on December 14, 1990.
The unit exited the reporting period in mode 5.
Gross electrical generation for the month of October was 0 MWH.
DETAILS 12/04/90 0034 12/08/90 1223 12/10/90 2235 12/14/90 2315 The AB train emergency. diesel generator is operable.
This terminates the planned unusual event declared when both emergency diesel generators were made inoperable.
Commenced reactor core reloading.
The reactor core reloading is complete.
The unit is in mode 5.
DOCKET VO:
UNIT NAME:
COMPLETED BY:
TELEPHONE:
DATE PAGE:
50-3 15 D.C.
Cook Unit 1 E. C.
Schimmel (616) 465-5901 January 4,
1990 1 of 1 MAJOR SAFETY-RELATED MAINTENANCE December 1990 There were no major safety-related maintenance items during the month of November.